WO 18-0011, Revision 31 to Updated Safety Analysis Report, Fire Protection Evaluation for HAZ Assessment of Structural Steel Integral to Fire Boundary, M-663-00017A, Att G5 to Att H

From kanterella
(Redirected from WO 18-0011)
Jump to navigation Jump to search
Revision 31 to Updated Safety Analysis Report, Fire Protection Evaluation for HAZ Assessment of Structural Steel Integral to Fire Boundary, M-663-00017A, Att G5 to Att H
ML18093B043
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 03/08/2018
From:
Wolf Creek
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18093A810 List: ... further results
References
WO 18-0011 M-663-00017A
Download: ML18093B043 (79)


Text

Page 1 J~'a\

W~~t.F ~NUCLEAR CREEK OPERATING CORPORATION M-663-00017A Attachment G5 Fire Protection Evaluation For HAZ Assessment of Structural Steel Integral to Fire Boundary Rev. No. Prepared By Date Reviewed By Date W03 ~~~ 7/6/2007 71612007

M-663-000 17A Page 2 of 15 Attachment GS Revision W03 Table of Contents Revision Log ................................................................................................................................. 3 1.0 Purpose .............................................................................................................................4 2.0 Scope ................................................................................................................................ 4 3.0 References ........................................................................................................................ 4 4.0 Assumptions ...................................................................................................................... S 5.0 Assessment of Condition to Design Requirements ........................................................... 5 6.0 Methodology ......................................................................................................................6 7.0 Evaluation ......................................................................................................................... 8 8.0 Conclusions ..................................................................................................................... 15 Appendix GSA, Room Data Sheets ......................................................... (63 Total Pages)

M-663-000 17A Page 3 of 15 Attachment G5 Revision W03 Revision Log Revision Reason for Revision W03 Original Issue

M-663-000 17A Page 4 of 15 Attachment G5 Revision W03 1.0 Purpose 1.1 The purpose of this document is to evaluate the Heat Affected Zone (HAZ) impact of 10 CFR 50 Appendix R fire barriers containing integral structural steel where either of the following is present:

  • Steel is provided with fireproofing on only one barrier side.
  • Fireproofing is provided on both steel sides and an unprotected thermal short attachment larger than Unistrut is present.

This evaluation was conducted in accordance with the guidance of NRC Generic Letter 86-10.

2.0 Scope 2.1 This evaluation is applicable to the Rooms identified in Table II.

3.0 References 3.1 NRC Generic Letter 86-10, Implementation of Fire Protection Requirements, dated April 24, 1986 3.2 10 CFR 50 Appendix R, Fire Protection Program For Nuclear Power Facilities Operating Prior To January 1, 1979 3.3 ASTM E-119, Standard Test Methods for Fire Tests of Building Construction and Materials 3.4 UL N-711, (A-126-00001), Fire Test Report Of Loaded Restrained Beams Protected By Cementitious Mixture, Dated August 11, 1976 3.5 UL N-712, (A-126-00002), Fire Test Report Of Loaded Restrained Beams Protected By Cementitious Mixture, Dated May 13, 1977 3.6 A-126, Technical Specification For Cementitious Fireproofing Of Structural Steel For The Standardized Nuclear Unit Power Plant Unit (SNUPPS) 3.7 PIR 2002-2287, Structural Steel Fireproofing With Unprotected Attachments 3.8 FP-M-012, Rev 0, Structural Steel Fireproofing Thermal Shorts and Omissions Evaluation 3.9 CNT-MC-600, Rev. 2, Fireproofing of Structural Steel 3.10 E-15000, Electrical Cable And Raceway List, Rev. 65 3.11 A-126, Cementitious Fireproofing of Structural Steel, Rev. 7 3.12 Updated Safety Analysis Report (USAR) Section 9.5.1.2.2.3.a, Rev. 19

M-663-00017 A Page 5 of 15 Attachment G5 Revision W03 3.13 Change Package 012323, M-663-00017A Revision to incorporate Structural Steel Fireproofing Evaluation and Analysis, Rev. 0 3.14 IEEE 383, Standard for Qualifying Class 1E Electric Cables and Field Splices for Nuclear Power Generating Stations 4.0 Assumptions 4.1 It is assumed that fireproofing material used to protect building steel is applied to a thickness as required by CNT-MC-600. This is an acceptable assumption based on a review of the Quality Control documentation maintained during initial fireproofing installation activities and subsequent inspections during ongoing plant repairs witnessed by Fire Protection personnel and inspections performed during the this evaluation process.

5.0 Assessment of Condition to Design Requirements 5.1 Requirements USAR Section 9.5.1.2.2.3.a identifies that the design, construction, test method, and acceptance criteria for fire rated barriers is per applicable sections (determined by construction type) of ASTM E-119, UL standards, and state building codes.

5.2 Assessment Fire testing does not directly bound the use of protected steel as part of a fire barrier assembly. Such a configuration presents the potential to transmit detrimental temperatures from the fire side through the steel element of the fire barrier to insitu combustibles and/or post-fire safe shutdown (PFSSD) circuits located in close proximity to the unexposed side of the steel fire barrier segment.

Attachment G 1, Section 7.1, evaluated that steel with fireproofing on both barrier sides containing unprotected thermal short attachments no larger than Unistrut in size and mass provides an equivalent 3-hour F and T rated configuration.

Therefore, HAZ review, similar to that discussed in Section 7.2.3 of M-663-00017A for non-T rated penetration seals, is only necessary for structural steel integral to a fire barrier assembly where either of the following is present:

  • Steel is provided with fireproofing on only one barrier side.
  • Fireproofing is provided on both steel sides and an unprotected thermal short attachment larger than Unistrut is present.

M-663-00017A Page 6 of 15 Attachment G5 Revision W03 6.0 Methodology Where a HAZ review was necessary for steel that is integral to a fire barrier assembly, a review similar to M-663-00017A Section 7.2.3 was conducted with the exception that a review distance of two feet from the unexposed steel surface was utilized. This is an acceptable distance considering the air gap temperature drop discussion provided in M-663-00017 A Section 7 .2.3. This two-foot distance from the structural steel member on the unexposed side is the area that encompasses the HAZ. Assuming an ASTM E-119 three-hour fire duration, a temperature of either 1925°F or 11 00°F was assigned to the unexposed barrier side based on the fireproofing configuration provided, including consideration for unprotected thermal short attachments larger than Unistrut.

A 1925°F temperature was utilized for the following configurations:

  • Fireproofing is single sided with an unprotected attachment on either barrier side.
  • Fireproofing is provided on both barrier sides and an unprotected attachment larger than Unistrut is located on the fire side such that it is in proximity (within two feet) to an unexposed side attachment that supports a raceway within the HAZ.

An unexposed side temperature assignment of 1925°F for the above configurations is a conservative approach, as it utilizes the maximum temperature attained during ASTM E-119 fire testing, with no credit given for concrete barrier heat sink or recognition that the hot spot created by the unprotected thermal short on the exposed barrier side will be localized.

An 11 00°F temperature was utilized for the following configurations:

  • Fireproofing is single sided and no unprotected attachments larger than Unistrut are present on either barrier side.
  • Fireproofing is provided on both barrier sides and an unprotected attachment larger than Unistrut is not in close proximity (within two feet) of an unprotected attachment on the opposing barrier side.

An unexposed side temperature assignment of 11 00°F for the above configurations is a an acceptable approach based on subtraction of ASTM E-119 furnace temperature (1925°F) from Reference 3.4 and 3.5 thermocouple data (1, 100°F). This yields an approximate 825°F temperature drop across the exposed fireproofing during ASTM E-119 fire endurance testing.

For PFSSD circuits and IEEE-383 cable, an insult temperature limitation of 700°F was utilized. A temperature limitation of 400°F was utilized for other Class A combustibles.

These temperature limitations are consistent with M-663-00017A, Section 7.2.3.

Figure 6-1 reflects the review process utilized to assess HAZ impact.

M-663-000 17A Page 7 of 15 Attachment G5 Revision W03 Walkdown thermal short & building steel incorporated into Appendix R barriers to determine if circuits and/or exposed combustibles are present in the HAZ (within 2' of barrier of concern).

Assign unexposed side temperature (1925°F or 11QQ°F).

No Yes

1) Document in M-663-00017A Attachment G data sheet for unprotected thermal short.
2) Implement design control for scheduled circuit(s) to ensure HAZ issue is addressed if circuit(s) is to be credited for PFSSD in the future.

Further Action Required to Address Issue:

  • Evaluation or
  • Field Work Required No Yes Document in M-663-00017A Further Action Required to Attachment G data sheet for Address Issue:

unbounded thermal shorts

  • Evaluation or
  • Field Work Required Figure 6-1, Heat Affected Zone Review Process

M-663-00017A Page 8 of 15 Attachment G5 Revision W03 7.0 Evaluation 7.1 Where structural steel is incorporated into a 10 CFR 50 Appendix R barrier, one-sided protection does not satisfy cold side temperatures, when considering an ASTM E-119 3-hour design basis fire. The one-sided protection configuration will not allow flame passage through the barrier. However, it could result in temperatures up to 11 00°F or 1925°F on the unexposed steel surface of the barrier. Each room was reviewed for HAZ impact in effort to document each raceway and insitu combustibles within two (2) feet of the barrier segment containing steel protected with cementitious fireproofing to ensure PFFSD is not impacted. In addition, two-side protection with unprotected attachments can also produce localized high temperatures. Therefore, protected steel with unprotected attachments was also reviewed for HAZ impact at barriers separating fire areas. No credit was given to area suppression systems, in effort to achieve a level of conservatism in the analysis process.

One sided structural steel fireproofing is determined to be "F" rated only and does not satisfy "T" rating requirements when exposed to a design basis fire.

Specification A-126, Section 7.1 states in part, "stair towers and elevator construction shall be protected from external hazards", thus in these cases structural steel fireproofing was not required on both sides of the barrier. Where these barriers provide 10 CFR 50 Appendix R separation, this configuration does not satisfy maximum cold side temperature limitations required by the WCNOC Fire Protection Program (250°F plus ambient for fire barrier construction and 325°F plus ambient for fire barrier penetration seals). Therefore, each location where one-sided fireproofing or significant attachments are present was evaluated for HAZ impact to ensure PFSSD is not affected. As such, any raceway/circuit or component within 2 feet of the one-sided protected barrier steel and/or two-sided protected steel with large thermal shorts will be considered within the HAZ and will be evaluated for PFSSD impact utilizing the Figure 6-1 methodology. Thermal shorts attached to stairwell steel will not impact the structural integrity of the steel or induce steel failure due to the corbel support afforded by the under supporting walls.

Table II defines the review scope and identifies the communicating rooms and fire areas along with the raceways that are potentially subject to thermal insult, based on proximity to the barriers evaluated. Each room and raceway (where applicable) is dispositioned in the "Comments/Disposition" Section of Table II, with reference provided to the appropriate evaluation paragraph section below.

Area walkdown reviews revealed that no insitu combustibles (other than IEEE-383 cable) were located within the HAZ for each of the Table II areas.

Appendix G5A documents the result of the Fire Protection reviews and assessments for each room and area listed in Table II, below. The data sheets contain relevant information for each location reviewed for HAZ impact.

M~663-000 17A Page 9 of 15 Attachment G5 Revision W03 TABLE II HAZ Barrier Review Fh Area Room Bldg a.v. ROQIII

~ RoomWfb Alr~1 -. ...........:

Areas (Inches)

A-1 1201 Aux 1988*0 Vestibule 1201 1119 19250F 1). No HAZ review required, no items in close proximity.

A-1 A-5 N/A A*l 1116 Aux 1974-0 Boric Acid 1116 1301 Bounded 1.) No HAZ review required, Tank Room B embedded steel (Concrete) on A-3 A-8 N/A backside.

1117 Boric Acid 1111 1320 Bounded 1.) No HAZ review required.

Tank Room A embedded steel (Cohcrete) on A-3 A-8 N/A backside.

1407 Aux 2026-Q Boric Acid 1407 1408 Bounded 1.) No HAZ review required, Batching embedded steel (Concrete) on A-3 A-16 N/A backside.

Tank Area A-5 1119 Aux 1988-0 Aux. Stair A-1 1119 1201 1100°F 1). No HAZ review required, no items in close proximity.

A-5 A-1 NIA Aux 2000-0 1321 1925°F 1). No HAZ review required, no Items in close proximity.

A-8 N/A Aux 2047-6 1502 1100DF-R Items 1, 2 & 3 ate NOT PFSSD:

A-20 1 1). Conduit 5U4B8R, See Section 4" (R) 7.1.3. NO Set Route Control Required 4" (R)1 2). Conduit 6U1214, See Section 7.1.3, NO Set Route Control Required 1 3). Conduit 5C1014. See Section 4" (R) 7.1.3, NO Set Route Control Requir&d A-6 1127 Aux 1974-0 Aux. Stair A-2 1127 1120 1925°F 1). No HAZ review required, no items In close proximity.

A-6 A-1 N/A Aux 2000-0 1320 1925'F.C Items 1 and 2 are NOT PFSSD.

1100'F-R Item 3 Jj PFSSD:

A*8

%" (C)1 1). Conduits 1J1E10, Set Route Control Required See Section 7.1.2 1%" (C)1 2). Conduit 1U1 F2G, Set Route Control R*qvired See Seetion7.1.2 1 3). Conduit 4U305H, Set Route 4" (C)

Control Required See SRtion 7.1.6 A-8 1320 Aux 2000.0 Aux. Corridor 1320 1127 1100'F-R Item 1 is NOT PFSSD:

No.4 A-8 A-6 14%" (R)1 1). Conduit 4J3C1 E. See Section 7.1.3, NO Set Route Control Required 1321 Aux 2000..0 Exit Vestibule 1321 1119 110o<'F-R 1). No HAZ review required, no items in close proximity.

A-8 A-5 N/A A-26 1405 Aux 2026-Q Chemical 1405 1401 Bounded 1.) No HAZ review required, Storage Area embedded steel (Concrete} on A-26 A-16 N/A baCkside.

M-663-00017A Page 10 of 15 Attachment GS Revision W03 Fh Anta Roam

- Elev. ....

Dllcrtpllon:

I Rooniil Flia-ANM *-~

(Inches)

C-2 3106 Cntrl 1974-0 Electrical 3106 3101 ttOO'F-R Items 1, 2 & 3 are NOTP.FSSD:

Chase C-2 C-1 6" (C), 1). Cable Tray 5JfA90, See Section 1 7.1.3. NO Set Route Control Required 3" (R) 6" (C), 2). Cable Tray 5U4A90. See Section 1 7.1.3, NO Set Route Control Requ*ired 3" (R) e* (C), 3). Cable Tray 5U1B90, See Section 3" (R)1 7.1.3, NO Set Route Control Required C-3 3105 Cntrl 1974-0 Electrical 3105 3101 110rF-R Items 1 & 2 are *NOT PFSSD:

Chase C-3 C-1 9" (C), 1). Cable Tray 6U1 890, See Section I

7.1.3, NO Set Route Control Required 1 7" (R)'

I I e* (C)1 2). Cable Tray 6U3G90, See Section 7.1.3, !NO Set Route Control Required 2" (R),

C-6 3201 Cntrl 1984-0 Control 3201 OSAC 1100°F-R 1). N/A ligh *ng conduit, Same Fire Building, Stair I Area, No HAZ review required, See C-6 C-6 NIA Section 7.1.1, no items ln close C-1 ' proximity. -.

Cntrl 2000-0 3201 3302 192.5°F-R 1). NIA lighting and communications conduit No HAZ review required, See C-6 C-10 N/A Section 7.1.1, no items in Close proximity.

Cntrl 2016-0 3201 3403 19251F-R Items *1 is _NOT PFSSD and Item C-6 C-15 2!§_PFSSD; I 23" (C)1 1). Cable Tray 6J8D22, See Section 7.1.3, NO Set Route Control Required 1~ (R)1 23" (C)1 2). cable Tray 6U3E21 , Set Route Control Required See Sec:tion 7..1.5 3" (R) 1 Cntrl 2032-0 3201 3501 11000F-C 1). Lighting conduit, Same Fire .Area, No HAZ review required, See Section C-6 C-21 N/A 7.1.1. no items in close *proximity.

Cntrt 2047-6 3201 3605 110CI'F-R Item 11s NO'TPFSSD:

C-6 C-17 14" (R)1 t). Conduit6J1T1A. See Section 7.1.3, NO Set Route Control Required 1t25"F.C Items 2 & 3 are NOT PFSSD:

21" (C)1 2). Conduit 4J3006, Set Route '

Control Requirad See Section 7.1.2 7" (C)1 3). Conduit 4.13007, Set Route Control Required See Sef:tion 7.1.2 Cntrl 2073-0 3201 3801 1100°F-R 1). 'No HAZ review required, items I

noted were Lighting and Detection C-6 C-22 conduits no other 4tems in close N/A I proximity, See Section 7.1.1 .

I C-8 3229 Cntrl 1984--0 I Electrical 3229 3204 11IJOIF-R Item 1 is !!Ql PFSSD:

Chase 7"(R),

C-8 C-6 1). Cable Tray 6U3G90, See Section 7.1.3, NO Set Route Control Required a

M-663-00017A Page 11 of 15 Attachment GS Revision W03 Fire ArM

  • ~ EttY .....

DelcriPtfon:

RoQn)ll ~-

Air~

(lnc:hn)

C-9 3301 I" Cntrl 2000-0 ESF 330~ 3306 1100'FoR hem 1 ~PFSSD & Item 2 is I

I I Switchgear C-9 C-12 NOTPFSSD:

Room No. 1 6" (C)' 1). Cable Tray 5C8081 , See Section 1 7.1.4, NO Sat !Route Control Required 4" (R) 6" {C), 2). Cable Tray 5C8A81 , See Section 7.1 .3, NO Set Route Control Required 2" (R)'

C-11 3305 Cntrt 2000-0 Electrical 3305 3302 110CJIIF-R Items 1 & 2 are !iQI PFSSD:

Chase C-11 C-10 5" (R)1 1). Cable Trays 6J1S70, See Section 7.1 .3, NO- Set Route

  • Control Required 1

23" (R) 2). Cable Trays 6U3H70, See Section 7.1.3, NO Set Route Control Required C-13 3415 Cntrl 2016-0 Access Ctrl & 3415 3416 1100'f.C Items 1& 2 Me NOT~FSSD:

~

ElecEquip A/C Units No.

C-13 C-14 n~* <c>' 1 ). Conduit 4U3061, Set Rout.

Control Required See Section 7.1.2 1

1aa-p;.c Item 2 Is !!QI. PFSSIJ:

1 12" (C) 2). Conduit 6U3089. Set Route 2" (R)'

Control Required See Section 7.1.2 I C-15 3403 Cntrl 2016-0 Non-Vital 3403 3404 Sounded 1 ). No HAZ Issue, Lighting Conduit Swgr& Xfmr Only, See Room 3201-2016, !No HAZ C-15 C-15 review required RmNo.1 N/A I

3404 Cntrt 2016-0 Switchboard 3404 3403 1Bounded 1). Same FtreArea. No HAZ*review RmNo. -4 required C-15 C-15 NfA 3405 CntrJ 2016-0 Battery Rm 3405 3406 Bounded 1). Same Are Area. No HAZ review No.4 required C-15 C-35 N/A I 3410 Cntrt 2016-0 Switchboard 3410 3418 110o-F-R Item 1 is NOT PFSS:

RmNo. 2 C-15 C-17 12" (C)1 1). Conduit 5.!3027, See Section 1 7.1.3, NO Set Route Control Required I 10" (R)

C-16 3409 Cntrl 2016-0 Non-Vital 3409 3401 11000F-R 1). No HAZ review required, no items Swgr&Xfmr in close proximity.

C-16 C-35 NlA RmNo.2

. C*17 3418 Cntrl 2016-0 Electrical 3418 3410 110CJIIF-R Items 1 and 2 ARE PFSSD and Chase C17 C-15 Item 3 is NOT PFSSD:

1 8" (R) 1). Cable Tray 6C8A60, See Section 7.1.4, NO Set Route Control Reqvlred 8" (R)1 2). Cable Tray 6U3H60 See Section 7.1.4, NO Set Route Control Req\lired 8" (R)1 3). Cable Tray 6J1A60, See Section

_, 7 .1.3, NO Set Route Control Required C-18 3419 Cntrl 2016-0 Electrical 3419 3414 110CJI'F-R Item 1 is NOT PFSSD and Item Chase C-18 C-16 21SPFSSD:

8" (C)' 1). Cable 'rray 5C8A70, See Section 1 7.1.3, NO Set Route Control Required 3" (R}

s* (C)' 2). Cable Tray 5C8070, See Section 1 7.1.4, NO Set Route Control Required 3* (R)

C-21 3501 Cntrl 2032-0 Lower Cable 3501 3505 11000F-R 1). 'See Room 3505. Item 1. *No HAZ Spreading review required. no Items in close C-21 C*23 N/A proximity.

Room

M-663-00017A Page 12 of 15 Attachment G5 Revision W03 FJre Ante

.... lldg Elh. Room Diflcrlpllon: Roonltlfli AriM *-*

(Inches) 1). No HAZ Issue, Gatronics Conduit C-22 3801  : Cntrl 2073-0 Upper Cable 3801 3201 11000F-R Spreading Only, See Section 7.1.1 C-22 C-6 NJA Room

  • C-23 3505 Cntrl 2032-0 Electrical 3505 3501 1100'F-R Item 1 is NOT PF.SSD:

Chase C-23 C-21 T (R)1 1). cable Tray 6J1A56, See Section 7.1 .3, NO Set ROI.te Control Required C-27 3605 Cntrl 2047-6 Equipment 3605 3617 NJA 1). See Room 3617, Duplicate HAZ cabinet Area C-27 C-30 C-30 3617 Cntrl 2047-S Electrical 3617 3605 1100'f.R Items 1, 2 & 3 are !!.QLPFSSD:

Chase C-30 C-27 18" (C) 1 1). Conduit 4J1032, Set Route Control Required See Section 7.1.2

%- (R)' I 8" (R) 1 2). Cable Tray 6J1A4{), See Section 7.1.3. NO Set Route Control Required 8" (R)1 3). Cable Tray 6C8A40, See Section 7.1.3, NO Set Route Control Required C-35 3406 Cntrl 2016-0 Corridor No. 2 3406 3405 11000F-R 1). Grid Plug Mounting, No HAZ review required . No HAZ Issues C-35 C-15 I N/A 3412 Cntrt 2016-o Emergency 3412 3101 I UOQIF-R Items 1, 2 and 3 are NOT Shower& C-35 PFSSD:

C-1 Eyewash 2" (C)' 1)~ Conduit 4U1 E2N, Set < Route Area Duct Control Required See Section 7.1.2 Chase 2" (C) 1 2). Conduit to JB 4U3045, Set Route Control Required See Section 7.1.2 2" (C), 3). Conduit to JB 4U3046, Set Route Control Required See Section 7.1.2 3412 3411 1180'F-R Item 1 is NOT PFSSD:

C-35 C-15 8" (C)' 1). Conduit 4U1 E2N, See Section 7.1.3, NO Set Route Control Required 2" (R),

C-36 C36 Cntrl 20oo-o Cable .Chase C36 3302 1100"f-R 1). Conduits in close proximity enter

@CA-C6, ad'j8C8nl FA. No HAZ Issue C-36 C-10 N/A 2000-0 to 2016-0, C-37 C37 Cntrt 2000-0 Cable Chase Elec. 3301 Bounded Item 1 is NOT PFSSD:

@CA-C3, Chase C-9 2000-Qto 1%" 1). Conduit 2U1034, See Section 2016-0 C-37 7.1.3, NO Set Route Control Required (R)1 Unislrut only, no thermal impact F-4 6203 Fuel 2026-0 Air Handling 6203 6202 1925°F-C Item 1 is NOT PFSSD:

Equipment F-4 F-5 NJA 1). Conduit 6J6014, Assumed failed, Room see Room 6202 F*5 6202 Fuel 2026-o Electrical 6202 6203 1925"F.C Item 1 is NOT PFSSD:

Equipment 1 F--5 F-4 14" (C) 1). Conduit 6.16014, 'Set Route Room Control Required See Section 7.1.2 Table Notes:

1. To determine acceptable air gap distance, conductive pathways, estimated exposure temperature is based on existing steel protection configuration and whether the exposure is C-Conduction or R-Radiant. In each case, the worse case Conductive and Radiant distance is used, either cumulative or a single thermal pathway exposure were reviewed as applicable.

M-663-000 17A Page 13 of 15 Attachment G5 Revision W03 7.1.1 Unscheduled conduit such as communication, fire detection and general plant lighting are not considered relevant to PFSSD and are not evaluated for PFSSD impact. Cabling contained within conduit cannot support combustion, propagate flame or hot gases. Therefore, fire propagation is not credible.

7.1.2 Scheduled Non-PFSSD conduits referring to this section are located within the HAZ and cable within the conduits have the potential to sustain damage from heat transmission through the barrier segment fabricated from building steel protected with cementitious fireproofing, as postulated temperature exposure exceeds 700°F for the respective raceway.

However, fire propagation will not occur, as cabling contained within conduit cannot support combustion, propagate flame or hot gases; therefore, fire propagation is not credible. Future use of these raceways shall be restricted or may require field modification if they are credited for PFSSD in the future. E-15000 set-route control is required for these raceways to ensure future raceway use continue to satisfy the conclusions of this evaluation. Referenced E-15000 set-route changes were completed by change package 012323.

7.1.3 Scheduled Non-PFSSD conduit and cable tray raceways referring to this section have been determined to have sufficient distance from the point of thermal insult and will not be thermally affected by conductive or radiant heat on the unexposed barrier side. This determination is supported by use of the air gap methodology described in M-663-000 17A, Section 7.2.3, which credits air space to reduce exposure temperatures to cabling and combustibles within or adjacent to the HAZ. Each HAZ issue was reviewed to ensure combustibles on the unexposed side of the barrier would not be affected by radiant energy and/or auto-ignition. Air gaps and thermal short distances were measured to permit use of the 222°F temperature drop rule for every 1" of air gap. After considering the air gap distance, each of the HAZ issues would have to meet acceptable cable exposures of <700°F. Maintaining exposure temperatures below this limitation will ensure that fire propagation cannot occur, and the raceway will not be affected through conduction or radiant heat.

7.1.4 PFSSD credited conduit or cable tray raceways referring to this section have been determined to have sufficient distance from the point of thermal insult and will not be thermally affected by conductive or radiant heat on the unexposed barrier side. This determination is supported by use of the air gap methodology described in M-663-00017A, Section 7.2.3, which credits air space to reduce exposure temperatures to cabling and combustibles within or adjacent to the HAZ. Each HAZ issue was reviewed to ensure combustibles on the unexposed side of the barrier would not be affected by radiant energy and/or auto-ignition. Air gaps and thermal short distances were measured to permit use of the 222°F temperature drop rule for every 1" of air gap. After considering the air gap distance, each of the HAZ issues would have to meet acceptable cable exposures of <700°F. Maintaining exposure temperatures below this limitation will ensure that fire propagation cannot occur, and the raceway will not be affected through conduction or radiant heat.

M-663-00017A Page 14 of 15 Attachment G5 Revision W03 7.1.5 PFSSD credited cable tray 6U3E21, located in Room 3403, is a 12" X 4" open cable tray in close proximity to a 6" x .375 thick I beam that is attached to the building steel. The building steel separates 10 CFR 50 Appendix R fire areas and is protected on the cable tray side with cementitious fireproofing (one-sided protection). The exposed side of the barrier is Room 3201, North Control Building Stairwell.

The cable tray is 23" away from the postulated exposure temperature of 1925°F as determined by the steel configuration and one-side fireproofing. Conservatively applying the M-663-00017A, Table 7.2.3-2B review distance for a 12" diameter pipe, in relation to the 6" beam, reveals that at 24" the thermal exposure would be approximately 1209°F.

Application of the air gap methodology of 222°F drop per 1" air gap reveals an approximate temperature of 543°F for the cables within the tray of concern. This is less than the 700°F insult temperature limitation for the IEEE-383 cable. However, this raceway requires E-15000 set route control to ensure future cable additions consider impact to this evaluation. This E-15000 set-route change was completed by change package 012323.

7.1.6 PFSSD credited conduit 4U3D5H, located in Room 1320 is a 3" rigid steel conduit supported by a 4" tube steel and Unistrut design mounted to the vertical column separating fire areas. The conduit contains PFSSD cabling associated with BIT injection. The building steel separates 10 CFR 50 Appendix R fire areas and is protected on the conduit side with cementitious fireproofing (one-sided protection). The exposed side of the barrier is Room 1127, North Auxiliary Building Stairwell.

The conduit is 4" away and mounted directly on to the conductive path to the postulated exposure temperature of 1925°F, as determined by the steel configuration and one-side fireproofing. The thermal path is conductive and thermal failure is expected due to the close proximity of the conduit to the exposure temperature of 1925°F. A fire in A-6 does not require BIT injection. Seal injection is available with no inventory loss through letdown. Therefore, PFSSD capability is not affected if a fire would occur in Fire Area A-6. However, this raceway requires E-15000 set route control to ensure future cable additions consider impact to this evaluation. This E-15000 set-route change was completed by change package 012323.

7.2 Post Fire Safe Shutdown Impact There is no impact to PFSSD capability, as the evaluation demonstrates that steel integral to 10 CFR 50 Appendix R fire barriers will prevent fire propagation.

The comprehensive walkdown review for each of the areas revealed that no exposed insitu combustibles or PFSSD capability is negatively affected by the steel fire barrier segments.

M-663-00017A Page 15 of 15 Attachment G5 Revision W03 8.0 Conclusions Based on physical plant walk downs, reviews and assessments performed by Fire Protection the room and areas identified in Table II above, contain protected structural steel that separate 10 CFR 50 Appendix R fire areas. Each of these barriers vary in configuration, some with one-sided protection and others with two-sided protection with unprotected attachments that could induce heat through the barrier beyond WCNOC cold side temperature limitations, if an ASTM E-119 three hour fire were to occur in the adjacent fire area. Therefore, each raceway that was located within the HAZ was reviewed for potential impact to PFSSD. All raceways listed in Table II above have been determined to be acceptable and do not affect PFSSD considering the protective coating or thermal short configurations that are present.

It is reasonable to conclude that the building steel integral to a fire barrier will satisfy regulatory expectations and commitments as well as WCNOC Fire Protection Program requirements, to prevent fire propagation and unacceptable thermal insult to raceways on the unexposed side of the fire barrier.

M-663-00017A, Revision W03 Page G5A- 1 of G5A-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation : 1201-1988 Building: Auxiliary Fire Area: A-01

==

Description:==

Vestibule Room Sketch :

- -- _$>~ .!O !..."' !!~ ,...-- - - - - - !

HAZ #1 Sketch 1.> * ...

  • L) **

p ,. .

-~

. *

  • _* (1 . a. .

[D}iJ N6 i+lfZ J SSqt:s, INJU/.IIi%'11 PI~

HAZ #1 Photo

M-663-00017A, Revision W03 Page G5A-2 of G5A-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation : 1116-1974 Building: Auxiliary Fire Area : A-03 Description : Boric Acid Tank Room B Room Sketch:

@' ~ .

~:3~----------------~.------i ~

HAZ # 1 Sketch

~I HAZ #1 Photo

M-663-00017 A, Revision W03 Page GSA-3 of GSA-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation : 1117-1974 Building : Auxiliary Fire Area : A-03 Description : Boric Acid Tank Room A Room Sketch:

ITS I

HAZ #1 Sketch 1111111.1 Look *"' So tl HAZ #1 Photo

M-663-00017 A, Revision W03 Page G5A-4 of GSA-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation : 1407-2026 Building : Auxiliary Fire Area : A-03

==

Description:==

Boric Acid Batching Tank Area Room Sketch :

HAZ #1 Sketch

. . ., /) . "

  • ~ *~ *~~ ** D IIAZ r

XC. \tON fo...* A vtew LoOK'" s o..rrH HAZ #1 Photo

M-663-00017 A, Revision W03 Page GSA-5 of GSA-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation: 1119-1988 Building: Auxil iary Fire Area : A-05

==

Description:==

Aux. Stair A- 1 & A-1 A Room Sketch:

HAZ #1 Sketch HAZ #1 Photo

M-663-00017A Revision W03 Page GSA-6 of GSA-63 Structural Steel Fireproofing Data Append ix GSA Room -Elevation : 11 19-2000 Bu ilding : Auxiliary Fire Area: A-05 Description : Aux . Stair A- 1 & A-1A Room Sketch :

1..-+--+-t- "r HAZ #1 Sket ch HAZ #1 Photo No photo required .

M-663-00017A, Revision W03 Page G5A-7 of G5A-63 Structural Steel Fireproofing Data Append ix GSA 1119-2000 HAZ #2 Sketch A.

\ 1

~ .o.

UI!.iJ

\o.IO Cl ltC...tlS vJ/ol-)

"~ -

l-ANilrNii S>'L.

Zzr.,

i 4 ' 1'1

~/16X:'SO 4.

rn IJI*'L J

---* 6

~ "f)

'A,'

IJ/iw /.1Jol:411r. IJ6t111 HAZ #2 Photo No photo required.

M-663-00017 A, Revision W03 Page GSA-8 of GSA-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation: 1119-2047 Building: Auxiliary Fire Area: A-05

==

Description:==

Aux . Stair A-1 & A-1A Room Sketch:

HAZ #1 Sketch A

<~* (o l>o.Ar>'> J:l)('o.JloFoC' >t\AI2't.. T-' \! ~ ...: At*-

N 1 ,.., "" *.: ~...,e HAZ #1 Photo

M-663-00017A, Revision W03 Page GSA-9 of GSA-63 Structural Steel Fireproofing Data Appendix G5A Room-Elevation: 1127-1974 Buildi ng : Auxi li ary Fire Area : A-06

==

Description:==

Aux. Stair A-2 Room Sketch :

@IT]

I HAZ #1 Sketch NO 1/AZ IS~

11/iz.

I

~

HAZ #1 Photo

M-663-00017 A, Revision W03 Page G5A-1 0 of G5A-63 Structural Steel Fireproofing Data Appendix GSA 1127-1974 HAZ #2 Sketch liJ.al l 't"'

MIJ 1t'1A'i HAZ #2 Photo

M-663-00017 A, Revision W03 Page G5A-11 of G5A-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation: 1127-2000 Building : Auxiliary Fire Area: A-06 Description : Aux. Sta ir A-2 Room Sketch:

E. U.**M7 14A.I 2.Q)I1 '

( ~JT":>) hDRmn I

[@!]

I J

LIW' I""t HAZ #1 Sketch

('-./D. S~ff /IJ 3 LUAtN-.JS"

.5*(0111 : 4U !.0 SH

~*.C<IN'6 : I 3' 1,.; I D 1\"(..-i~ ; 14 I ~1 t; HAZ #1 Photo

M-663-00017A, Revision W03 Page GSA-12 of GSA-63 Structural Steel Fireproofing Data Appendix GSA 1127-2000 HAZ #2 Sketch

'"I i .:zc; .J

>roor lf16 f f,u~.- ..... - . 1> J/4Z

(';'(i' ~ II . l c... *~) 0

  • Sft.iiC-.1 A* A HAZ #2 Photo

M-663-00017A, Revision W03 Page GSA-13 of GSA-63 Structural Steel Fireproofing Data Appendix GSA 1127-2000 HAZ #3 Sketch HAZ #3 Photo

M-663-0001 7A, Revision W03 Page GSA-14 of GSA-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation: 1127-2026 Bu ilding: Auxiliary Fire Area: A-06 Descript ion : Au x. Stair A-2 Room Sketch :

HAZ #1 Sketch 0

6

  • HAZ #1 Photo No photo required .

M-663-00017 A , Revision W03 Page GSA- 15 of GSA-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation : 1320-2000 Building: Auxiliary Fire Area: A-08

==

Description:==

Corridor No. 4 Room Sketch:

HAZ #1 Sketch II

~ ". s~c:nj)~ A*A HAZ #1 Photo

M-663-00017 A, Revision W03 Page GSA-16 of GSA-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation : 1321-2000 Building : Auxiliary Fire Area : A-08

==

Description:==

Exit Vestibu le Room Sketch:

El.ev. zooo' (tJ~)


r--------------~---F--~--~

HAZ #1 Sketch lA HAZ #1 Photo No photo required .

M-663-00017A, Revision W03 Page GSA-17 of GSA-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation: 1405-2026 Building : Auxiliary Fire Area: A-26

==

Description:==

Chemica l Storage Area Room Sketch :

HAZ #1 Sketch HAZ #1 Photo

M-663-00017A, Revision W03 Page GSA-18 of GSA-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation: 3106-1974 Building: Control Fire Area: C-02

==

Description:==

Electrical Chase Room Sketch:

HAZ #1 Sketch

.,...-.,,:....-..,-H *. :...i l lo-- -H-*-11 II I

'b I,

[ _] I'

( T'( f )

1:

f AST S.l!:C::.i IO!.l A- A HAZ #1 Photo

M-663-00017 A, Revision W03 Page GSA-19 of GSA-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation: 3105-1974 Building: Control Fire Area : C-03

==

Description:==

Electrica l Chase Room Sketch :

---@ ce HAZ #1 Sketch

~Ul&~

C**..,.J t;,1.1l .;-,o

[P ..... T] S t: Ci l O>J A- A

'liEN LbO h/6. & liST HAZ #1 Photo

M-663-00017A, Revision W03 Page G5A-20 of G5A-63 Structural Steel Fireproofing Data Appendix GSA 3105-1974 HAZ #2 Sketch t' 'ZI 55

~

!>:<:..Tror-.~ A- A*

( PAr roa t..)

HAZ #2 Photo

M-663-00017A, Revision W03 Page GSA-21 of GSA-63 Structural Steel Fireproofing Data Appendix G5A Room-Elevation: 3201-1984 Building: Control Fire Area : C-06

==

Description:==

Control , Stair C-1 Room Sketch:

HAZ #1 Sketch No sketch required.

HAZ #1 Photo

M-663-00017A, Revision W03 Page GSA-22 of GSA-63 Structural Steel Fireproofing Data Appendix G5A Room-Elevation: 3201-2000 Building: Control Fire Area: C-06

==

Description:==

Control , Stair C-1 Room Sketch:

WI~JJ-t~~~~:wfzz*

I JJo'tl ~ {w.sc. xl~

HAZ #1 Sketch n . O *.

a * .* .

A .

o . *,.. ' ' .t> ~

. ..

  • JI

.* A C I'll<.~ WAll.

l3z.ot I StC.rtoN A-A VI!W OOj; t.IJ c, IJ6 R.171 HAZ #1 Photo

M-663-00017A, Revision W03 Page G5A-23 of G5A-63 Structural Steel Fireproofing Data Appendix GSA 3201-2000 HAZ #2 Sketch Haz Sketch 2 HAZ #2 Photo

M-663-00017 A, Revision W03 Page GSA-24 of GSA-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation: 3201-2016 Building : Control Fire Area: C-06

==

Description:==

Control, Sta ir C- 1 Room Sketch :

3Z.OI 0--r--- --------'--

!ifEV. l O/t-HAZ #1 Sketch HAZ #1 Photo

M-663-00017A, Revision W03 Page GSA-25 of GSA-63 Structural Steel Fireproofing Data Appendix GSA 3201-2016 HAZ #2 Sketch HAZ #2 Photo

M-663-00017A. Revision W03 Page GSA-26 of GSA-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation : 3201-2032 Building : Control Fire Area: C-06

==

Description:==

Control , Stair C-1 Room Sketch :

I c-t" .~ ;;w z.tJ 32.

IJ TS 3~ 1 vr .~

j..l

!*"'1"'

HAZ #1 Sketch EtEYI1'1'ft)lv Zo3z' NT?

HAZ #1 Photo

M-663-000 17A, Revision W03 Page GSA-27 of GSA-63 Structural Steel Fireproofing Data Appendix GSA 3201-2032 HAZ #2 Sketch

- Ll'iH iiN/i (ON (Ju,f L J KI.Nf, - J7.

£Le '/1 /ltJN 2o3Z' HAZ #2 Photo

M-663-00017 A , Revision W03 Page GSA-28 of GSA-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation : 3201-2047 Building : Control Fire Area: C-06 Description : Control, Stair C-1 Room Sketch:

I fi.E.Y. ZD4(

(rm.)

wn~17r--~~~r

- 'IJJ'"'Ioo

- "11'1007 HAZ #1 Sketch I

Eli?:IJ U>lt7 W 'Z1xi'+

r--'

111 z a. R.ACeS

~ lt71N<) 4 'J 300(., ( 4"{oJJt))

C:.~II.I IC o,..,, ~ _.

HAZ #1 Photo

M-663-00017 A, Revision W03 Page G5A-29 of G5A-63 Structural Steel Fireproofing Data Appendix G5A 3201-2047 HAZ #2 Sketch salt A-A HAZ #2 Photo

M-663-00017 A, Revision W03 Page GSA-30 of GSA-63 Structural Steel Fireproofing Data Appendix GSA 3201-2047 HAZ #3 Sketch El£ . 2().47' J..ilt Z. 6N L 'T' NO 1Ncemn S.ltoi?T VsCW LObi\W6 GA..S I HAZ #3 Photo

M-663-00017A, Revision W03 Page GSA-31 of GSA-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation: 3201 -2073 Building : Control Fire Area : C-06

==

Description:==

Control . Stair C-1 Room Sketch:

HAZ #1 Sketch

... o .

I>

2~ *--- i, '6 lllill ... .

.,. , 'Z.073' h '*

E.l.i VA7 1o

  • ..b kiTS HAZ #1 Photo

M-663-00017A. Revision W03 Page GSA-32 of GSA-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation : 3229-1984 Building: Control Fire Area: C-08

==

Description:==

Electrica l Chase Room Sketch:

HAZ #1 Sketch 7'XJ( I.

(lYP z)

HAZ #1 Photo

M-663-00017A, Revision W03 Page G5A-33 of G5A-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation : 3301-2000 Building : Control Fire Area : C-09 Description : ESF Switchgear Room No . 1 Room Sketch:

h
  • Room Layout HAZ #1 Sketch VIC:W LOO"i':IIJl, ~MI 5t.:.c.T tbk.J A-A HAZ #1 Photo No photo required.

M-663-00017A, Revision W03 Page G5A-34 of G5A-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation : 3305-2000 Build ing: Control Fire Area : C-1 1

==

Description:==

Electrical Chase Room Sketch:

tot t*wo. *l15"

'e) f4 Ut' """* C. II )luw I<>II I B7o CAWTr~rs o.l Tit <!>~ ....

I; <.I }4 To oC: Cll ~ c! ~'1:1!

>I.OTAI'~

I. 3'1 ~ 70 llT *'Ttai-'-

13)0'3 I ,:t'R'I) f..(.8A7o 1\1\'Z.,

" 8 11\ 70 1 334~1 t.J"I ~70 E.J.fi ~*

A ~Th

~*

v HAZ #1 Sketch

~c> J' J,( 7o Vll. w LLlol iNh I::AST HAZ #1 Photo

M-663-00017A, Revision W03 Page GSA-35 of GSA-63 Structural Steel Fireproofing Data Appendix GSA 3305-2000 HAZ #2 Sketch (cub loll SIC..

s* t>. .,.........

- b 3"IS70 f:l :. l.t::~:==ll I '~ I HAZ #2 Photo

M-663-00017A, Revision W03 Page G5A-36 of G5A-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation: 3415-2016 Building: Control Fire Area : C-1 3

==

Description:==

Access Ctrl & Elec Equip AJC Units No. 1 Room Sketch:

F HAZ #1 Sketch HAZ #1 Photo

M-663-00017A, Revision W03 Page GSA-37 of GSA-63 Structural Steel Fireproofing Data Appendix GSA 3415-2016 HAZ #2 Sketch HAZ #2 Photo

M-663-00017A, Revision W03 Page G5A-38 of G5A-63 Structural Steel Fireproofing Data Appendix GSA 3415-2016 HAZ #3 Sketch I ' A II)

  • C'I Q

HAZ #3 Photo

M-663-00017 A, Revision W03 Page G5A-39 of G5A-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation : 3403-2016 Building : Control Fire Area : C-15

==

Description:==

Non-Vi tal Swgr & Xfmr Rm No. 1 Room Sketch :

~ j ~o1 !

t-1 ..

II

[@]

  • ~:r- ....

(-

.....If

""161 I .}'Irs I HAZ #1 Sketch Nb 1J T Tile ;;m&. tS To GIL..; ... toJ HAZ #1 Photo No photo required.

M-663-00017 A, Revision W03 Page G5A-40 of G5A-63 Structural Steel Fireproofing Data Appendix GSA 3403-2016 HAZ #2 Sketch LJ '

  • Q 0 I~ !>U G, ( 4'-1 Ut7"{l6U~

~H i=1 0lr ~In

'liZ t.

HAZ #2 Photo

M-663-00017A, Revision W03 Page G5A-4 1 of G5A-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevat ion : 3404-2016 Bu ilding : Control Fire Area : C-15

==

Description:==

Switchboard Rm No . 4 Room Sketch :

3~01

"~~

(7 T '*

~

7~1~

""Jot~~.,..

r.34<>4 HAZ #1 Sketch A

NtJ 19 rrllct;m~tJT"S Tt>

ut."' ""'"'*

HAZ #1 Photo No photo required .

M-663-00017A, Revision W03 Page GSA-42 of GSA-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation : 3405-2016 Building : Control Fire Area : C-15

==

Description:==

Battery Rm No. 4 Room Sketch:

HAZ #1 Sketch NO t/AZ. tS .(c,e;o;

/ -~~;:- -

l. AL.81 l ~ TN/.. r..%J I.J"fa? I S~ctatJ A -ll HAZ #1 Photo

M-663-00017 A, Revision W03 Page GSA-43 of GSA-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation : 3410-2016 Building: Control Fire Area : C- 15

==

Description:==

Switchboard Rm No . 2 Room Sketch :

aE. . "ZCl\\.o (Ni';.)

[a[]

Pcoc>.C 3"1/01

---~

HAZ #1 Sketch SCC.T!O N k~

HAZ #1 Photo

M-663-00017A, Revision W03 Page GSA-44 of GSA-63 Structural Steel Fireproofing Data Appendix GSA 3410-2016 HAZ #2 Sketch 3 5

~ ~ ~

~

p.

-v b

  • j

~

~--

~

l}lf[]

  • p 13--l to I

- L;.-. LA' p

HAZ #2 Photo

M-663-00017A, Revision W03 Page GSA-45 of GSA-63 Structural Steel Fireproofing Data Appendix GSA 3410-2016 HAZ #3 Sketch HAZ #3 Photo

M-663-00017 A, Revision W03 Page G5A-46 of G5A-63 Structural Steel Fireproofing Data Append ix GSA Room-Elevation : 3409-2016 Building : Control Fire Area : C-16

==

Description:==

Non-Vital Swgr & Xfmr Rm No . 2 Room Sketch :

ALL CotU u IT ~ ~CK.o'i\!'ll T~o<.iG.II WALL A l:htlfet>Ji TO 14112.*1 l!'loiTiflt f'lt<>M R<>otYI ~ 11 1110 1~<4C":>

A J"'l'll v

HAZ #1 Sketch A " t'CNU I'fS /IV Ct.oSif ~i)'

.4~ ~~b Tlll!tA.It<,t/W4"'- To Jt<lt!JO'l 3"i..I HAZ #1 Photo

M-663-00017A, Revision W03 Page GSA-47 of GSA-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation: 3418-2016 Building: Control Fire Area : C-17

==

Description:==

Electrical Chase Room Sketch:

~---

HAZ #1 Sketch sec.no>~ A* A HAZ #1 Photo

M-663-0001 7A, Revision W03 Page GSA-48 of GSA-63 Structural Steel Fireproofing Data Appendix GSA 3418-20 16 HAZ #2 Sketch "J"IAI,O l l-'1 *~ I Si£C.TIO tJ A* A lilt! v.~ U>o "'"' G Ai. r HAZ #2 Phot o No photo required.

M-663-00017 A , Revision W03 Page GSA-49 of GSA-63 Structural Steel Fireproofing Data Appendix GSA 3418-2016 HAZ #3 Sketch S~c..n e A* A l-"1 311 c.o V/t!'N LDoiCW(> IA ~T HAZ #3 Photo No photo required.

M-663-00017 A , Revision W03 Page GSA-50 of G5A-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation: 3419-2016 Building: Control Fire Area: C-18

==

Description:==

Electrica l Chase Room Sketch:


- - - - N HAZ #1 Sketch HAZ Sketch 1 r* &.! ~""..s 5C SA -,<>

5<1Jt~~70 VlfW LOOr\fl.l6 wc:.ST sec r161J A*A HAZ #1 Photo

M-663-00017A, Revision W03 Page GSA-51 of G5A-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation: 3801-2073 Building: Control Fire Area : C-22 Description : Upper Cable Spreading Room Room Sketch :

-:r--

wt~a m (C

HAZ #1 Sketch HAZ # 1 Photo

M-663-00017A, Revision W03 Page GSA-52 of GSA-63 Structural Steel Fireproofing Data Appendix GSA Room -Elevation: 3505-2032 Building: Control Fire Area: C-23 Description : Electrical Chase Room Sketch:

....------ v A

~~ ----~ --rw~~3C.

Jolo IIEkn'INt.~

I~!.U~ .

t..;l.fiVA 1tdi..J 2,..o)'l,.

N,...,

HAZ #1 Sketch HAZ #1 Photo

M-663-00017A, Revision W03 Page GSA-53 of GSA-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation: 3605-2047 Bu ilding : Control Fire A rea : C-27 Description : Equipment Cabinet Area Room Sketch :

vtJ tSJ clt
i~ tJAI Cowmm O IJ l..'t' UIJ I S7li!vn4>tT7~

HAZ #1 Sketch

... b -

TYriL~~-t. 8 ?UICJ;""5 S. ltQOM LAY4ur FoR T ~A 'I' t.Jo'S,

~ ..

t1 *

, 0 v 'E.W LM , *.u. w~s r HAZ #1 Photo No photo required .

M-663-00017A, Revision W03 Page G5A-54 of GSA-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation: 3617-2047 Building: Control Fire Area: C-30

==

Description:==

Electrical Chase Room Sketch :

HAZ #1 Sketch

.. ~ *  ! r P

.. -* .b

.,. ~,;:. R.:JoY'fl t.A\'04T ~

PC2Qita .... ,'1'(.

HAZ #1 Photo

M-663-00017A, Revision W03 Page GSA-55 of GSA-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation: 3406-2016 Buildi ng: Control Fire Area: C-35

==

Description:==

Corridor No . 2 Room Sketch:

HAZ #1 Sketch HAZ Sketch 1

, A If '

10" C/11/MIJF/,

~.. "Til liJ I'~

l 340i.o I HAZ #1 Photo

M-663-00017A, Revision W03 Page G5A-56 of G5A-63 Structural Steel Fireproofing Data Appendix GSA 3406-2016 HAZ #2 Sketch VeR ~ 'flllt.c;. ~ I ON G.O, SCT ~ . .3 +o 4"

-pfi<.I:~S ~CALV T~41!uNb <..I RICMI'I'S ltJ CLoSG f'eo.J

HA"Z. l:TcSM .

<i!.<..rODoJ **8 W:Wlbol:llll. Wts~T HAZ #2 Photo

M-663-00017A, Revision W03 Page GSA-57 of GSA-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation: 3412-2016 Building : Control Fire Area: C-35

==

Description:==

Emergency Shower & Eyewash Area Room Sketch:

EL/fYl.Oih .

(NTS)

HAZ #1 Sketch AL'B 1 )<.t Mst'f?~'l"' f*PPci~RS:

TIJ 1XS" yEJi! '( Ttl IC P::. AITi/1!>

Lo c. ~ T ao.J .

fl. *'

~ , , ~... *~

    • I>

~

HAZ #1 Photo

~* *i, <

I I **- .*

)
j i~

~ _. _ l~

M-663-00017A, Revision W03 Page G5A-58 of G5A-63 Structural Steel Fireproofing Data Appendix GSA 3412-2016 HAZ #2 Sketch

  • . t W1>~2 1

~

n .

I# * *

  • ~

l't "(*o.l~

1 1i(o oJt 4U.3<>'\5 4<i3o4t..

Vtt:W ~D/;tNI, sour-f  !;,eC.77&.U .4 -A AI.~ 'i::.u~I!-S,.Zl! r IS A ~PRbll . '3 u+* *f'TIIIG AT [ljr~ ~£ATI1l..i HAZ #2 Photo

M-663-00017A, Revision W03 Page G5A-59 of G5A-63 Structural Steel Fireproofing Data Appendix GSA 3412-2016 HAZ #3 Sketch

.. ~TLO-.J A-A HAZ #3 Photo

M-663-00017A, Revision W03 Page GSA-60 of GSA-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation : C036-2000 Building : Control Fire Area : C-36 Descript ion : Cable Chase@ CA-C6, 2000-0 to 2016-0 ,

Room Sketc h:

HAZ #1 Sketch AU. (dN/Jf.JITS 141

'-'-" ~<! PfM.t ti1*Vi' To "1-i A£ E,qit"R..

C.ti ~ ~ ~~OPH Room 33ot .

1\.lC I ~S~L...,. .

HAZ #1 Photo

M-663-00017A, Revision W03 Page GSA-61 of GSA-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation : C037-2000 Building : Control Fire Area : C-37

==

Description:==

Cable Chase @ CA-C3, 2000-0 to 2016-0 Room Sketch:

'i <o"'l>

2 10 34 ALL r~,., "'~

t! ra1J.J)

"'" 61.E c.. rrr+Sc A il<' ~o-..n:D I1HZ0\4E.tt 1\h~C',Uf rle.ft

,----4.---~ --I~ IC 1J

'A 3:.f"'J3 v

HAZ #1 Sketch

. . -u -0

? loot HAZ #1 Photo

M-663-00017 A, Revision W03 Page GSA-62 of GSA-63 Structural Steel Fireproofing Data Appendix GSA C037-2000 HAZ #2 Sketch HAZ #2 Photo

M-663-00017A, Revision W03 Page GSA-63 of GSA-63 Structural Steel Fireproofing Data Appendix GSA Room-Elevation : 6202-2026 Building: Fuel Fire Area : F-05

==

Description:==

Electrical Equipment Room Room Sketch :

V vT v

H I

HAZ #1 Sketch HAZ #1 Photo

Wolf Creek Nuclear Operating Corporation Page 1 of 1 f\k663-00017 A, Revision W01 Attachment H Fire Protection Evaluations for Unique or Unbounded Firestop and Cable Tray Cover Configurations (There are currently no evaluations in this attachment)