IR 05000354/2015006

From kanterella
Revision as of 08:02, 20 May 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
ROP 16 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2015006)
ML16055A328
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 03/02/2016
From: Bower F L
Reactor Projects Branch 3
To: Braun R
Public Service Enterprise Group
BOWER, FL
Shared Package
ML16039A082 List:
References
IR 2015006
Download: ML16055A328 (7)


Text

March 2, 2016 Mr. Robert Braun President and Chief Nuclear Officer PSEG Nuclear LLC N09 P.O. Box 236 Hancocks Bridge, NJ 08038

SUBJECT: ANNUAL ASSESSMENT LETTER FOR HOPE CREEK GENERATING STATION (REPORT 05000354/2015006)

Dear Mr. Braun:

On February 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Hope Creek Generating Station (Hope Creek). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015 through December 31, 2015. This letter informs you period and its plans for future inspections at your facility. The NRC determined that overall, Hope Creek operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Hope Creek during the most recent quarter was within the Licensee Response Column of the low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through December 31, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 60855.1, .As discussed below, the NRC will also perform Temporary Instruction (TI) 2515-the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-p, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-ying Licenses with Regard to Reliable remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for Hope Creek, and the information gathered will aid staff in development of the Final Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing TI 2515-191, nt Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment From January 1 to December 31, 2015, the NRC issued three SL-IV traditional enforcement violations associated with impeding the regulatory process. The violations occurred over a -up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period. In accordance with NRC Inspection Manual Chapter 0305, violations through a baseline inspection (71111.11B) listed in the enclosed inspection plan and the second through IP -up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Follow-up for the third violation was already completed through baseline inspection. In accordance with Title 10 of the Code of Federal Regulations the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (610) 337-5200 with any questions you have regarding this letter.

Sincerely,/RA/ Fred L. Bower, III, Chief Project Branch 3 Division of Reactor Projects Docket Nos. 50-354 License Nos. NPF-57

Enclosure:

Hope Creek Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML16055A328 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE R1/DRP R1/DRP R1/DRP NAME JHawkins/MXD per telecon MDraxton/ MXD FBower/ FLB DATE 02/22 /16 02/23 /16 02/ 23 /16 Page 1 of 302/23/201612:18:40Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteHope CreekInspection / Activity Plan01/01/2016-12/31/2017TRI FI-TRIENNIAL FIRE PROTECTION41 IPFire Protection [Triennial]7111105T03/14/201603/18/20161 IPFire Protection [Triennial]7111105T03/28/201604/01/2016EP-EP EXERCISE EVALUATION11 IPExercise Evaluation711140105/16/201605/20/2016EXM8/15-HOPE CREEK INITIAL EXAMINATION51 FY16-HOPE CREEK INITIAL OPERATOR LICENSING EXAMU0192507/18/201607/22/20161 FY16-HOPE CREEK INITIAL OPERATOR LICENSING EXAMU0192508/22/201609/02/201692702-IP 9270211 IPFollowup On Corrective Actions For Violations And Deviations9270205/23/201605/26/201671124-ENVIRONMENTAL11 IPRadiological Environmental Monitoring Program71124.0706/06/201606/10/201671124-RADIATION PROTECTION11 IPRadiological Hazard Assessment and Exposure Controls71124.0106/20/201606/24/20161 IPOccupational ALARA Planning and Controls71124.0206/20/201606/24/20161 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0306/20/201606/24/20161 IPOccupational Dose Assessment71124.0406/20/201606/24/20161 IPRadiation Monitoring Instrumentation71124.0506/20/201606/24/20167111111B-HOPE CREEK REQUAL INSP W/ P/F RESULTS21 IPLicensed Operator Requalification Program7111111B09/12/201609/16/201671124-RADIATION PROTECTION11 IPRadiological Hazard Assessment and Exposure Controls71124.0109/12/201609/16/20161 IPOccupational ALARA Planning and Controls71124.0209/12/201609/16/20161 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0309/12/201609/16/20161 IPOccupational Dose Assessment71124.0409/12/201609/16/20161 IPRadiation Monitoring Instrumentation71124.0509/12/201609/16/20167111108G-INSERVICE INSPECTION11 IPInservice Inspection Activities - BWR7111108G10/17/201610/21/201671124-RADIATION PROTECTION11 IPRadiological Hazard Assessment and Exposure Controls71124.0110/17/201610/21/20161 IPOccupational ALARA Planning and Controls71124.0210/17/201610/21/20161 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/17/201610/21/20161 IPOccupational Dose Assessment71124.0410/17/201610/21/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 302/23/201612:18:40Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteHope CreekInspection / Activity Plan01/01/2016-12/31/201771124-RADIATION PROTECTION11 IPRadiation Monitoring Instrumentation71124.0510/17/201610/21/201671124-RADIATION PROTECTION11 IPRadiological Hazard Assessment and Exposure Controls71124.0112/12/201612/16/20161 IPOccupational ALARA Planning and Controls71124.0212/12/201612/16/20161 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0312/12/201612/16/20161 IPOccupational Dose Assessment71124.0412/12/201612/16/20161 IPRadiation Monitoring Instrumentation71124.0512/12/201612/16/20161 IPOccupational Exposure Control Effectiveness71151-OR0112/12/201612/16/20161 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0112/12/201612/16/201671152B-PI&R BIENNIAL11 IPProblem Identification and Resolution71152B01/30/201702/03/20171 IPProblem Identification and Resolution71152B02/13/201702/17/2017MODS-PERMANENT PLANT MODIFICATIONS31 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T03/13/201703/17/20171 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T03/27/201703/31/2017EP-EP PROGRAM INSPECTION11 IPAlert and Notification System Testing711140205/15/201705/19/20171 IPEmergency Preparedness Organization Staffing and Augmentation System711140305/15/201705/19/20171 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140505/15/201705/19/20171 IPPerformance Indicator Verification7115105/15/201705/19/20177111107T-TRIENNIAL HEAT SINK11 IPHeat Sink Performance7111107T06/19/201706/23/201771124-RADIATION PROTECTION - EFFLUENTS11 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0607/10/201707/14/201771124-RADIATION PROTECTION11 IPRadiological Hazard Assessment and Exposure Controls71124.0107/24/201707/28/20171 IPOccupational ALARA Planning and Controls71124.0207/24/201707/28/20171 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0307/24/201707/28/20171 IPOccupational Dose Assessment71124.0407/24/201707/28/20171 IPRadiation Monitoring Instrumentation71124.0507/24/201707/28/2017ISFSI-ISFSI LOADING CAMPAIGN INSPECTION11 IPOperation Of An ISFSI6085508/07/201708/11/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 3 of 302/23/201612:18:40Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteHope CreekInspection / Activity Plan01/01/2016-12/31/2017ISFSI-ISFSI LOADING CAMPAIGN INSPECTION11 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.108/07/201708/11/2017T1-191-FUKUSHIMA LESSONS-LEARNED11 IPInspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 20122515/19108/21/201708/25/201771124-RADIATION PROTECTION11 IPRadiological Hazard Assessment and Exposure Controls71124.0110/02/201710/06/20171 IPOccupational ALARA Planning and Controls71124.0210/02/201710/06/20171 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/02/201710/06/20171 IPOccupational Dose Assessment71124.0410/02/201710/06/20171 IPRadiation Monitoring Instrumentation71124.0510/02/201710/06/201771124.08-RADWASTE11 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0812/04/201712/08/201771124-RADIATION PROTECTION11 IPRadiological Hazard Assessment and Exposure Controls71124.0112/04/201712/09/20171 IPOccupational ALARA Planning and Controls71124.0212/04/201712/09/20171 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0312/04/201712/09/20171 IPOccupational Dose Assessment71124.0412/04/201712/09/20171 IPOccupational Exposure Control Effectiveness71151-OR0112/04/201712/09/20171 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0112/04/201712/09/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.