Letter Sequence Request |
---|
|
|
MONTHYEARML21319A3542021-11-29029 November 2021 Acceptance of the Hermes Non-Power Test Reactor Construction Permit Application for Kairos Power LLC Project stage: Acceptance Review ML22024A4922022-01-10010 January 2022 Hermes CP RAI - Preliminary Questions on the Hermes PSAR, Email 1 Project stage: Request ML22028A0022022-02-0202 February 2022 Kairos Hermes Environmental Audit Plan Project stage: Other ML22041A3372022-02-0303 February 2022 Kairos Power LLC, Transmittal of Responses-to NRC Questions 2.3-1 and 2.3-2 on the Hermes Preliminary Safety Analysis Report Project stage: Request ML21364A0132022-02-0808 February 2022 Kairos Power LLC - Application for Construction Permit for Hermes Test Reactor Project stage: Other ML22040A3382022-02-0909 February 2022 Kairos Power LLC, Response to NRC Questions 2.5-1, 2.5-2, 2.5-3, and 2.5-4 for PSAR Section 2.5 on Hermes Construction Permit Application Project stage: Other ML22040A3362022-02-0909 February 2022 Kairos Power LLC, Submittal of Response to NRC Questions 2.5-1, 2.5-2, 2.5-3, and 2.5-4 for PSAR Section 2.5 on Hermes Construction Permit Application Project stage: Request ML21204A0392022-02-15015 February 2022 Federal Register Notice of Intent to Conduct Scoping and Prepare an EIS - Kairos Hermes CP Review Project stage: Request ML22039A2262022-02-17017 February 2022 Audit Plan for the Kairos Hermes Preliminary Safety Analysis Report (PSAR) Section 6.3 Decay Heat Removal System - February 2022 Project stage: Other ML22031A2892022-03-10010 March 2022 Request to Initiate Section 106 Consultation and Scoping Process for Kairos Power Hermes Non-Power Test Reactor Construction Permit Review Project stage: Request ML22091A0002022-03-23023 March 2022 Kairos Hermes Scoping Meeting Transcript Project stage: Request ML22089A1662022-04-0808 April 2022 Kairos Power LLC - Hermes Construction Permit Preliminary Safety Analysis Report I&C Repor (Chapter 7) Audit Plan (Cac/Epid No. 000955/05007513/L-2021-NEW-0011) Project stage: Other ML22110A0182022-05-0505 May 2022 Kairos Power LLC, Summary of March 23, 2022, Public Outreach Meeting on the Proposed Kairos Hermes Test Reactor with Designated Period for Receipt of Environmental Scoping Comments Project stage: Request ML22143B0162022-05-27027 May 2022 Audit Plan for Hermes Site Characteristics PSAR Chapter 2 Project stage: Other ML22230D0762022-08-0505 August 2022 Final RCI 349 on Salt Purity in the Chemistry Control System and the Inert Gas System Project stage: Other ML22227A1802022-08-0808 August 2022 Final RAI 348 on Shutdown Rod Reliability Project stage: RAI ML23158A2682023-06-13013 June 2023 Safety Evaluation for Hermes Construction Permit Application Project stage: Approval ML23158A2662023-06-13013 June 2023 Transmittal of Safety Evaluation for Hermes Construction Permit Application Project stage: Approval ML23181A1072023-07-18018 July 2023 Summary of August 25 and 30 2022 Public Meetings on the Kairos Hermes Preliminary Safety Analysis Report Project stage: Meeting ML23237B4652023-09-11011 September 2023 FRN: General Notice. Acceptance for Docketing of the Kairos Power LLC Hermes 2 Test Reactor Construction Permit Project stage: Request ML23353A0692024-01-0505 January 2024 Kairos Power, LLC-Hermes 2-Environmental Report Audit Plan Project stage: Other 2022-03-23
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24247A1602024-09-0303 September 2024 Kairos - Hermes 2 Docs - Final Environmental Assessment and Finding of No Significant Impact for Kairos Hermes 2 Test Reactors in Oak Ridge, Tennessee ML24246A0142024-08-28028 August 2024 NRR E-mail Capture - Regarding DG-5071 Target Set Identification and Development for Nuclear Power Reactors Access ML24206A0842024-07-24024 July 2024 NPS Draft EA Response - Hermes 2 ML24206A0862024-07-24024 July 2024 Construction of Kairos Power, LLC, Hermes 2 Non-Power Test Reactor, Ettp - Project SHPO0004436 ML24193A2442024-07-11011 July 2024 Transmittal Email for the Summary Report for the Regulatory Audit of the Hermes 2 Preliminary Safety Analysis Report ML24180A1392024-06-28028 June 2024 Kairos - Hermes 2 Docs - Advanced Safety Evaluation for Hermes 2 ML24166A2222024-06-14014 June 2024 Kairos - Hermes 2 Docs - FW FW (External) Re Fw Kairos Power Test Reactor NRC ML24138A1562024-05-17017 May 2024 Kairos - Hermes 2 Docs - Preliminary Chapter 5 of Hermes 2 SE to ACRS ML24138A2072024-05-17017 May 2024 Kairos - Hermes 2 Docs - Preliminary Chapter 13 of Hermes 2 SE to ACRS ML24137A2662024-05-15015 May 2024 Kairos - Hermes 2 Docs - Preliminary Chapter 9 of Hermes 2 SE to ACRS ML24135A2602024-05-14014 May 2024 Transmittal Email for Request for Confirmation of Information 3 for Hermes 2 Preliminary Safety Analysis Report ML24136A0682024-05-10010 May 2024 Kairos - Hermes 2 Docs - Preliminary Chapters (2 & 3) of Hermes 2 SE to ACRS ML24116A1622024-04-25025 April 2024 Kairos - Hermes 2 Docs - Draft Environmental Assessment and Finding of No Significant Impact for Kairos Hermes 2 Test Reactors in Oak Ridge, Tennessee ML24114A2802024-04-23023 April 2024 Kairos - Hermes 2 Docs - Preliminary Chapter of Hermes 2 SE to ACRS ML24114A2822024-04-23023 April 2024 Kairos - Hermes 2 Docs - Preliminary Chapter of Hermes 2 SE ML24113A2722024-04-22022 April 2024 Kairos - Hermes 2 Docs - Preliminary Chapter of Hermes 2 SE ML24105A0002024-04-14014 April 2024 Kairos - Hermes 2 Docs - Environmental Audit Summary Report for Hermes 2 ML24103A1762024-04-12012 April 2024 Transmittal Email from NRC to Kairos Power LLC, Request for Confirmation of Information for the Hermes 2 Preliminary Safety Analysis Report ML24095A2922024-04-0404 April 2024 Kairos - Hermes 2 Docs - Preliminary Chapter of Hermes 2 SE ML24080A4502024-03-20020 March 2024 Kairos - Hermes 2 Docs - FW Kairos Power Test Reactor NRC ML24074A3712024-03-14014 March 2024 Kairos - Hermes 2 Docs - Preliminary Chapters of Hermes 2 SE ML24072A3162024-03-12012 March 2024 Kairos - Hermes 2 Docs - FW Transmittal of Responses to NRC Requests for Confirmatory Information for the Review of the Hermes 2 Environmental Report (Courtesy Copy) ML24059A3892024-02-28028 February 2024 Kairos - Hermes 2 Docs - Feb 28 2024 Ipac Updated Species List_ Tennessee Ecological Services Field Office (1).pdf ML24057A3872024-02-26026 February 2024 Hermes 2 General Audit Questions 5.2-13, 5.2-14, and 5.2-15 ML24057A4222024-02-26026 February 2024 Kairos - Hermes 2 Docs - RCI Confirmation Message ML24051A2352024-02-20020 February 2024 Kairos - Hermes 2 Docs - FW HC-1 Status ML24051A2412024-02-20020 February 2024 Kairos - Hermes 2 Docs - Quick Question ML24046A1732024-02-15015 February 2024 Hermes 2 General Audit Question 9.3-1 ML24043A2172024-02-12012 February 2024 Hermes 2 General Audit Questions 5.2-10, 5.2-11, and 5.2-12 ML24206A0872024-02-0707 February 2024 Prshpo Section 106 Initiation Response - Hermes 2 ML24033A1812024-02-0202 February 2024 Hermes 2 General Audit Questions 5.2-6, 5.2-7, 5.2-8, and 5.2-9 ML24030A9732024-01-30030 January 2024 Kairos - Hermes 2 Docs - RCI Preview for Hermes 2 Environmental Audit ML24024A2262024-01-24024 January 2024 Hermes 2 General Audit Question 13.1-11 ML24002B1392024-01-0202 January 2024 Hermes 2 General Audit Questions 2.5-2, 2.5-3, 4.3-2, 4.3-3, 4.5-1, 5.1-1, 5.1-2, 5.1-3, 5.2-2, 5.2-3, 5.2-4, 5.2-5, 6.3-1, 9.1-1, 9.1-2, 9.6-1, 13.1-7 Through 10, TR-1, TR-2, TR-3 ML23346A0162023-12-11011 December 2023 Hermes 2 General Audit Questions 3.5-1, 4.3-1, 5.2-1, 7.4-1, 9.8-1, 11.1-1, 13.1-1 Through 13.1-6, 13.2-1, 14.1-1, and 14.1-2 ML23338A2352023-12-0404 December 2023 Hermes 2 General Audit Questions 7.1-2, 7.1-3, 7.1-4, 7.1-5, and 7.2-3 ML23332A0012023-11-28028 November 2023 Public Summary of November 7 Tribal Consultation Response Letter to the NRC ML23324A1172023-11-20020 November 2023 Hermes 2 General Audit Questions 2.1-1, 2.1-2, 2.2-1 Through 4, 2.5-1, 7.1-1, 7.2-1, and 7.2-2 ML23317A3682023-11-0606 November 2023 Hermes CP Doc - (External_Sender) Construction of Kairos Power, LLC, Hermes Non-Power Test Reactor, Ettp - Project SHPO0001832 ML23307A0552023-11-0101 November 2023 Hermes CP Doc - (External_Sender) Construction of Kairos Power, LLC, Hermes Non-Power Test Reactor, Ettp - Project SHPO0001832 ML23305A0502023-11-0101 November 2023 NRR E-mail Capture - Response to Kairos Request for Non-Public Documents Related to Security ML23304A2092023-10-31031 October 2023 Hermes 2 General Audit Questions 1.3-1 and 13.1-1 ML23296A2202023-10-13013 October 2023 Hermes 2 General Audit Questions 1.5-1 and 1.5-2 ML23276B3992023-10-0303 October 2023 Email to Kairos Providing the Hermes 2 General Audit Plan ML23274A0062023-10-0101 October 2023 Hermes CP Doc - Public Summary of Sep 14 Meeting with Consulting Tribe ML23268A3602023-09-12012 September 2023 Request to Speak Letter from the City of Oak Ridge, Tennessee at the October 19, 2023 Evidentiary Hearing for the Kairos Power, LLC, Hermes Test Reactor Construction Permit Application ML23226A1722023-08-10010 August 2023 NRR E-mail Capture - Hermes Construction Permit Application Mandatory Hearing Resource Estimate ML23185A0042023-07-0404 July 2023 Hermes CP Doc - Submittal of Supplemental Information from Kairos Power_Redacted (8).pdf ML23180A2982023-06-29029 June 2023 Hermes CP Doc - Public Summary of 6-27-23 Email from Consulting Tribe ML23180A2992023-06-29029 June 2023 Hermes CP Doc - FW Email Summary of the April 20 Kairos Submittal 2024-09-03
[Table view] |
Text
From: Beasley, Benjamin Sent: Monday, January 10, 2022 1:39 PM To: Darrell Gardner
Subject:
Preliminary questions on the Hermes PSAR, email #1
Dear Mr. Gardner,
By letter dated September 29, 2021, Kairos submitted an application and PSAR for the Hermes test reactor. Based on the review of the PSAR, the NRC staff has developed preliminary questions to support the NRC staffs review of the application.
PSAR Request Request / Question Chapter Number
Please submit the representative hourly meteorological data referenced in Section 2.3.3 so that it can be docketed along with the application. This 2.3-1 should be provided in a text file in Regulatory Guide 1.23 format by email, optical disk or other mode. Please coordinate with a project manager on 2.3 the mode used.
Meteorology In Section 2.3.4 Kairos states that the short-term dispersion modelling uses ARCON96 with the atmospheric dispersion methodology as outlined in the 2.3-2 KP-FHR mechanistic source term topical report. NRC staff requests that Kairos provide the site-specific inputs and assumptions used to run the ARCON96 model and provide the ARCON96 input and output files.
FEMA flood insurance study (FIS) data:
The Hermes test reactor site is approximately 3 miles upstream from the confluence of the Clinch River and Poplar Creek. In Table 2.4-2, Kairos provided FIS flood elevations at the confluence and applied those FIS flood 2.4-1 elevations to the Hermes test reactor site. The NRC staff checked the FIS data and found there is no FIS data covering the Hermes site in the Poplar Creek watershed. In the PSAR, no illustration is provided for how the FIS flood elevations at the confluence are transferred to the Hermes site.
Please provide information describing how the flood elevation shown in Table 2.4-2 was developed for the Hermes site.
2.4 Dam Failure Information:
Hydrology 2.4-2 In Section 2.4.2.2, Kairos references TVA evaluations of dam safety from 1991 and 2014. Are there more recent evaluations by TVA regarding the safety of Norris and Melton Hill dams? If so, please provide them.
In the PSAR, the design basis flood appears to be supported by two references:
- Reference 2, BARGE, Flood Hazard Evaluation for Y -12 (Bear 2.4-3 Creek) and K-25 (Poplar Creek). 2015.
- Reference 6, Tennessee Valley Authority, Flood Analysis for Department of Energy Y-12, ORNL, and K-25 Plants, TVA. 1991.
The staff requests that Kairos submit those two references on the docket.
Section 2.5.3 of the application relies on the information of Clinch River Early Site Permit applications earthquake catalog, which ends in 2013. An 2.5-1 updated (2013 - 2021) earthquake catalog should be provided to demonstrate that the assumptions and conclusions in the CRN PSHA remain valid.
2.5-2 For Section 2.5.4.3, how does Kairos intend to determine that the 2.5 Geology, foundation rock shows no evidence of karstic dissolution?
Seismology, Geologic cross-section A-A (Figure 2.5-2) appears to be missing the Geotechnical 2.5-3 Mascot Dolomite, which is shown on the map (Figure 2.5-1) but not in the Engineering cross-section. Provide a new cross-section that includes all geologic units shown on the surface and encountered in the subsurface.
Geologic cross-section B-B (Figure 2.5-3) shows the Mascot Dolomite appearing to dip to the northwest. However, geologic maps of the site show 2.5-4 all units at the site location dipping to the southeast (see Geologic Map of the Elverton Quadrangle, Tennessee Geological Survey, 2015). Please confirm the correct dip direction of the Mascot Dolomite and provide a new cross-section that shows the correct dip if needed.
Please review the questions for proprietary information and tell me of your conclusion. If there is no proprietary information, this email will be placed into ADAMS as a public document. If there is proprietary information, a non-public record will be created.
If Kairos would like clarification of the preliminary questions, please propose times to discuss them. If Kairos would like to discuss possible responses to the preliminary questions, a public meeting will be scheduled. If there is a need to discuss proprietary information, a portion or all of the meeting may be closed.
In some instances, preliminary questions may support future requests for additional information (RAIs). Kairos will be advised of the need for RAIs by separate correspondence.
If you have any questions or need clarifications on the preliminary questions, please do not hesitate to contact me.
Ben Beasley
~~~~~~~~~~~
Benjamin Beasley Senior Project Manager Advanced Reactor Licensing Branch Office of Nuclear Reactor Regulation 301-415-2062 Benjamin.Beasley@nrc.gov