MONTHYEARIR 05000373/20230042024-01-24024 January 2024 County Station - Integrated Inspection Report 05000373/2023004 and 05000374/2023004 IR 05000373/20230122024-01-18018 January 2024 County Station - Biennial Problem Identification and Resolution Inspection Report 05000373/2023012 and 05000374/2023012 IR 05000373/20234022023-12-20020 December 2023 County Station - Security Baseline Inspection Report 05000373/2023402 and 05000374/2023402 IR 05000373/20230032023-11-0909 November 2023 County Station Integrated Inspection Report 05000373/2023003, 05000374/2023003, and 07200070/2023001 IR 05000373/20234012023-11-0707 November 2023 County Station Security Baseline Inspection Report 05000373/2023401 and 05000374/2023401 IR 05000374/20230102023-10-11011 October 2023 NRC Inspection Report 05000374/2023010 IR 05000373/20233012023-09-15015 September 2023 Errata to NRC Initial License Examination Report 05000373/2023301; 05000374/2023301 IR 05000373/20230022023-08-0101 August 2023 County Station - Integrated Inspection Report 05000373/2023002 and 05000374/2023002 IR 05000373/20230112023-06-26026 June 2023 County Station - Quadrennial Fire Protection Team Inspection Report 05000373/2023011 and 05000374/2023011 IR 05000373/20230012023-05-10010 May 2023 County Station - Integrated Inspection Report 05000373/2023001 and 05000374/2023001 IR 05000373/20220062023-03-0101 March 2023 Annual Assessment Letter for LaSalle County Station, Units 1 and 2 (Report 05000373/2022006 and 05000374/2022006) IR 05000373/20220042023-01-31031 January 2023 County Station - Integrated Inspection Report 05000373/2022004 and 05000374/2022004 IR 05000373/20224042022-12-21021 December 2022 County Station - Material Control and Accounting Program Inspection Report 05000373/2022404 and 05000374/2022404 IR 05000373/20225012022-12-0505 December 2022 County Station - Emergency Preparedness Biennial Exercise Inspection Report 05000373/2022501 and 05000374/2022501 IR 05000373/20224022022-11-17017 November 2022 County Station - Security Baseline Inspection Report 05000373/2022402 and 05000374/2022402 IR 05000373/20220112022-11-0101 November 2022 County Station Design Basis Assurance Inspection (Teams) Inspection Report 05000373/2022011 and 05000374/2022011 IR 05000373/20220032022-11-0101 November 2022 County Station - Integrated Inspection Report 05000373/2022003 and 05000374/2022003 IR 05000373/20224032022-09-15015 September 2022 County Station - Cyber Security Inspection Report 05000373/2022403 and 05000374/2022403 IR 05000373/20220052022-08-22022 August 2022 Updated Inspection Plan for Lasalle County Station (Report 05000373/2022005; 05000374/2022005) IR 05000373/20220022022-08-10010 August 2022 County Station - Integrated Inspection Report 05000373/2022002 and 05000374/2022002 IR 05000373/20224012022-05-18018 May 2022 County Station - Security Baseline Inspection Report 05000373/2022401 and 05000374/2022401 IR 05000373/20220012022-04-26026 April 2022 County Station - Integrated Inspection Report 05000373/2022001 and 05000374/2022001 ML22108A2802022-04-19019 April 2022 Information Request for an NRC Triennial Baseline Design Bases Assurance Inspection (Team) Inspection Report 05000373/2022011 05000374/20220 IR 05000373/20220102022-03-15015 March 2022 County Station License Renewal Phase 2 Report 05000373/2022010 IR 05000373/20210062022-03-0202 March 2022 Annual Assessment Letter (Report 05000373/2021006 and 05000374/2021006) IR 05000373/20210042022-02-0707 February 2022 County Station Integrated Inspection Report 05000373/2021004 and 05000374/2021004 IR 05000373/20210132022-01-20020 January 2022 County Station Biennial Problem Identification and Resolution Inspection Report 05000373/2021013 and 05000374/2021013 IR 05000373/20214022021-12-15015 December 2021 County Station - Security Baseline Inspection Report 05000373/2021402 and 05000374/2021402 IR 05000373/20210032021-11-0808 November 2021 County Station Integrated Inspection Report 05000373/2021003; 05000374/2021003 and 07200070/2021001 IR 05000373/20210022021-11-0101 November 2021 County Station Integrated Inspection Report 05000373/2021002 and 05000374/2021002 IR 05000373/20210122021-10-28028 October 2021 County Station- 50.59 Team Inspection Report 05000373/2021012 and 05000374/2021012 IR 05000373/20210052021-09-0101 September 2021 Updated Inspection Plan for Lasalle County Station, Units 1 and 2; Report 05000373/2021005 and 05000374/2021005 IR 05000373/20210112021-08-23023 August 2021 County Station - Design Basis Assurance Inspection (Programs) Inspection Report 05000373/2021011 and 05000374/2021011 IR 05000373/20215012021-06-16016 June 2021 County Station - Emergency Preparedness Biennial Exercise Inspection Report 05000373/2021501 and 05000374/2021501 IR 05000373/20214012021-05-18018 May 2021 County Station - Security Baseline Inspection Report 05000373/2021401 and 05000374/2021401 IR 05000373/20210012021-05-0404 May 2021 Lssalle County Station - Integrated Inspection Report 05000373/2021001 and 05000374/2021001 IR 05000374/20210102021-04-0505 April 2021 County Station - Post-Approval Site Inspection for License Renewal (Phase I) Report 05000374/2021010 IR 05000373/20200042021-03-0505 March 2021 Reissue - Lasalle County Station - Integrated Inspection Report 05000373/2020004; 05000374/2020004; 05000373/2020501; 05000374/2020501; 05000373/2020011 and 05000374/2020011 IR 05000373/20200062021-03-0404 March 2021 Annual Assessment Letter for Lasalle County Station Units 1 and 2 (Report 05000373/2020006 and 05000374/2020006) ML21043A1982021-02-12012 February 2021 County Station - Integrated Inspection Report 05000373/2020004; 05000374/2020004; 05000373/2020501 and 05000374/2020501 IR 05000373/20204022021-01-0505 January 2021 County Station - Security Baseline Inspection Report 05000373/2020402 and 05000374/2020402 IR 05000373/20203012020-12-17017 December 2020 NRC Initial License Examination Report 05000373/2020301; 05000374/2020301 IR 05000373/20200032020-12-11011 December 2020 County Station - Integrated Inspection Report 05000373/2020003 and 05000374/2020003 IR 05000373/20200052020-09-0101 September 2020 Updated Inspection Plan for Lasalle County Station, Units 1 and 2 (Report 05000373/2020005 and 05000374/2020005) IR 05000373/20200022020-08-11011 August 2020 County Station - Integrated Inspection Report 05000373/2020002 and 05000374/2020002 IR 05000373/20200122020-06-0505 June 2020 County Station - Triennial Fire Protection Inspection Report 05000373/2020012 and 05000374/2020012 IR 05000373/20200012020-05-11011 May 2020 County Station - Integrated Inspection Report 05000373/2020001 and 05000374/2020001 IR 05000373/20204012020-03-16016 March 2020 Security Baseline Inspection Report 05000373/2020401 and 05000374/2020401 IR 05000373/20190062020-03-0303 March 2020 Annual Assessment Letter for LaSalle County Station, Units 1 and 2 (Report 05000373/2019006 and 05000374/2019006) IR 05000373/20200102020-02-25025 February 2020 Post-Approval Site Inspection for License Renewal (Phase I) Report 05000373/2020010 2024-01-24
[Table view] Category:Letter
MONTHYEARIR 05000373/20230042024-01-24024 January 2024 County Station - Integrated Inspection Report 05000373/2023004 and 05000374/2023004 ML24024A1332024-01-24024 January 2024 Confirmation of Initial License Examination IR 05000373/20230122024-01-18018 January 2024 County Station - Biennial Problem Identification and Resolution Inspection Report 05000373/2023012 and 05000374/2023012 ML23354A2902024-01-0505 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0028 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23360A6082023-12-27027 December 2023 County Station Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000373/2024010 and 05000374/2024010 ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums RS-23-120, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information IR 05000373/20230032023-11-0909 November 2023 County Station Integrated Inspection Report 05000373/2023003, 05000374/2023003, and 07200070/2023001 ML23286A2602023-11-0808 November 2023 Issuance of Amendment Nos. 260 and 245 to Renewed Facility Operating Licenses Relocation of Pressure and Temperature Limit Curves to the Pressure Temperature Report IR 05000373/20234012023-11-0707 November 2023 County Station Security Baseline Inspection Report 05000373/2023401 and 05000374/2023401 RS-23-103, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans IR 05000374/20230102023-10-11011 October 2023 NRC Inspection Report 05000374/2023010 IR 05000373/20233012023-09-15015 September 2023 Errata to NRC Initial License Examination Report 05000373/2023301; 05000374/2023301 RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor ML23212A9012023-08-0303 August 2023 Regulatory Audit Report to Support the Review of the Amendments to Relocation of the Pressure Temperature Limit Curves to the Pressure and Temperature Limits Report IR 05000373/20230022023-08-0101 August 2023 County Station - Integrated Inspection Report 05000373/2023002 and 05000374/2023002 ML23208A3182023-07-27027 July 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI RS-23-084, Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis2023-07-24024 July 2023 Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis ML23192A5272023-07-12012 July 2023 NRC Initial License Examination Report 05000373/2023301; 05000374/2023301 ML23186A2062023-07-0606 July 2023 Information Request for a NRC Post-Approval Site Inspection for License Renewal 05000374/2023010 ML23181A1502023-06-30030 June 2023 Combined Response to Request for Additional Information and Supplemental Information in Support of LAR to Relocate Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000373/20230112023-06-26026 June 2023 County Station - Quadrennial Fire Protection Team Inspection Report 05000373/2023011 and 05000374/2023011 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23167A0352023-06-16016 June 2023 Registration of Use of Cask to Store Spent Fuel ML23171A9562023-06-12012 June 2023 Post Exam Ltr RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling IR 05000373/20230012023-05-10010 May 2023 County Station - Integrated Inspection Report 05000373/2023001 and 05000374/2023001 ML23123A2202023-05-0303 May 2023 Relief Request I4R-14 for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 ML23121A1612023-05-0101 May 2023 Information Meeting (Open House) with a Question-and-Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of LaSalle County Station, Units 1 and 2 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML23107A1822023-04-18018 April 2023 Operator Licensing Examination Approval Lasalle County Station, May 2023 RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23073A2182023-03-22022 March 2023 Issuance of Amendment No. 258 to Renewed Facility Operating Licenses Exigent Amendment to Revise Design Basis Related to Seismic Requirements RS-23-048, Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements2023-03-0707 March 2023 Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000373/20220062023-03-0101 March 2023 Annual Assessment Letter for LaSalle County Station, Units 1 and 2 (Report 05000373/2022006 and 05000374/2022006) RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-037, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station2023-02-22022 February 2023 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station ML23024A1372023-02-0303 February 2023 Request for Withholding Information from Public Disclosure for LaSalle County Station, Unit Nos. 1 and 2 ML23031A1972023-01-31031 January 2023 Notification of NRC Fire Protection Team Inspection Request for Information, Inspection Report Nos. 05000373/2023011 and 05000374/2023011 IR 05000373/20220042023-01-31031 January 2023 County Station - Integrated Inspection Report 05000373/2022004 and 05000374/2022004 RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 2024-01-05
[Table view] |
Inspection Report - LaSalle - 2023010 |
---|
|
|
Text
October 11, 2023
SUBJECT:
LASALLE COUNTY STATION, UNIT 2 - NRC INSPECTION REPORT 05000374/2023010
Dear David P. Rhoades:
On September 20, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at LaSalle County Station, Unit 2, and discussed the results of this inspection with John Van Fleet and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Signed by Feliz-Adorno, Nestor on 10/11/23 Néstor J. Féliz Adorno, Chief Engineering and Reactor Projects Branch Division of Operating Reactor Safety Docket No. 05000374 License No. NPF-18
Enclosure:
As stated
Inspection Report
Docket Number: 05000374 License Number: NPF-18 Report Number: 05000374/2023010 Enterprise Identifier: I-2023-010-0049 Licensee: Constellation Nuclear Facility: LaSalle County Station, Unit 2 Location: Marseilles, IL Inspection Dates: September 11, 2023 to September 20, 2023 Inspectors: M. Domke, Reactor Inspector Approved By: Néstor J. Féliz Adorno, Chief Engineering and Reactor Projects Branch Division of Operating Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a NRC inspection at LaSalle County Station, Unit 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
OTHER ACTIVITIES
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL
===71003 - Post-Approval Site Inspection for License Renewal The NRC conducted this Phase 2 Post-Approval Site Inspection for License Renewal in accordance with the License Renewal Inspection Program (LRIP) for LaSalle, Unit 2. The inspection took place prior to the Unit 2 period of extended operation (PEO) which begins December 16, 2023. Per Inspection Manual Chapter 2516, the LRIP is the process used by the NRC staff to verify adequacy of aging management programs (AMP), Time Limited Aging Analyses (TLAA), and other activities associated with an applicants request to renew an operating license of a commercial nuclear power plant beyond the initial licensing period under 10 CFR part 54, Requirements for the Renewal of Operating Licenses for Nuclear Power Plants.
The NRC completed its Phase 2 Post-Approval Site Inspection for License Renewal for Unit 1 on February 22, 2023. During this prior inspection, the inspectors reviewed at least 70 percent of regulatory commitments, along with their associated AMPs and TLAAs (ML22073A100).
During this Unit 2 inspection, the inspector focused on Unit 2 commitments, such as the examination of ASME class 1 small-bore piping and ASME IWE Containment Liner. The inspector also conducted samples for other programs that impact both units. As described in inspection procedure (IP) 71003, subsequent Phase 2 inspections at multi-unit sites may not require the same level of effort as the initial Unit's Phase 2 inspection.
Post-Approval Site Inspection for License Renewal ===
- (1) Commitment Item 17: Fire Water System
- (2) Commitment Item 21: One-Time Inspection
- (3) Commitment Item 22: Selective Leaching
- (4) Commitment Item 28: Buried and Underground Piping
- (5) Commitment Item 29: ASME Section XI, Subsection IWE
- (6) Commitment Item 48: Unit 2 Inspection of ASME Code Class 1 Small-Bore Piping Program
INSPECTION RESULTS
Observation: Unit 2 Cable Spreading Room Pre-action Fire Sprinkler Obstruction 71003 Evaluation Lacked Supporting Information The licensee did not provide a description of the source of the obstruction in sprinkler nozzle 4-5 and lacked a sufficient basis for their conclusion that asserted the absence of age-related degradation.
Updated Safety Analysis Report (USAR) Fire Water AMP enhancement no. 3, states Perform internal visual inspections of sprinkler and deluge system piping to identify internal corrosion and obstructions to flow. If the presence of sufficient foreign organic or inorganic material to obstruct pipe or sprinklers is detected during pipe inspections, the material is removed and its source is determined and corrected where possible. Follow up volumetric examinations will be performed if internal visual inspections detect age-related degradation in excess of what would be expected accounting for design, previous inspection experience, and inspection interval.
Additionally, USAR Fire Water AMP enhancement no. 4 states Perform obstruction evaluations when degraded conditions are identified through visual inspections, flow testing, or volumetric examinations. The obstruction evaluations will include an extent of condition determination, need for increased inspections, and follow up examinations if internal visual inspections detect age-related degradation in excess of what would be expected accounting for design, previous inspection experience, and inspection interval.
On September 4, 2020, during pre-action fire sprinkler testing in the Unit 2 cable spreading room, blockage at nozzle 4-5 was identified. In accordance with procedure LOS-FP-R6, step E.2.16.1, and license renewal commitment AR 01603204-17, the system engineer was contacted for evaluation. However, inspectors noted that the conclusions drawn from this assessment were not supported.
On September 13, 2023, the inspectors reviewed the obstruction evaluation, which asserted the absence of age-related degradation "in excess of" expectations, with no need for follow-up volumetric examinations. The evaluation did not describe the obstruction and did not identify its source in the nozzle 4-5 sprinkler branch, as specified in the commitment.
Also, the evaluation concluded there was no age-related degradation because only one out of eleven sprinkler branch lines was affected by the obstruction. However, using just one impacted sprinkler among any number as a basis is inconsistent with the test acceptance criteria. Interviews revealed that the system engineer did not observe the test, and there was no information forthcoming from the individuals who conducted the test. Interviews with licensee personnel also affirmed that the issue report documenting the obstruction yielded minimal information regarding its cause or source.
The inspectors concluded that the absence of specific details about the obstruction in nozzle 4-5 undermined the evaluation conclusions. Despite deficiencies in the evaluation, there is a reasonable assurance that the Unit 2 cable spreading room pre-action sprinkler system can fulfill its intended function. The obstruction evaluation in issue report IR 04367410 was an isolated instance with the obstruction cleared through flushing, and no other fire protection obstruction evaluations were brought to the attention of inspectors.
Not determining the obstruction's source can lead to overlooking biologically influenced corrosion. The lack of qualification for obstruction-related degradation introduces subjectivity and the potential for overlooking necessary further action, such as volumetric examinations, for ensuring the pre-action system's functionality throughout the extended operation period.
The licensee captured this observation in issue report IR 04703313, which intends to improve the evaluation process by developing a list of information for consideration during obstruction evaluations. According to the licensee, this list will ensure proper information is obtained at the time of the obstruction event and should improve the ability of evaluation personnel to determine necessary follow up actions.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On September 20, 2023, the inspectors presented the NRC inspection results to John Van Fleet, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71003 Corrective Action 04350050 Fire Protection Leak During Performance of LOS-FP-R6 06/12/2020
Documents 04367410 U2 Cable Spreading Room FP System Blockage at Nozzle 4-5 09/04/2020
04431105 LR-UT Inspection on 0WW28A-2" 06/23/2021
04431106 LR-UT Inspection on 0WW30A-2" 06/23/2021
04440284 Documentation of Selective Leaching Based on Powerlabs 08/12/2021
04440286 Documentation of Selective Leaching Based on Powerlabs 08/12/2021
04452213 Extent of Condition Assessment for One-Time Inspection AMP 10/11/2021
04522696 Buried Pipe -2022 gPIMS Examination Results 09/15/2022
Corrective Action AR 04703313 NRC ID Improvement Suggested for FW Obstruction 09/18/2023
Documents Evaluation
Resulting from
Inspection
Miscellaneous PMCR 00092160 Service Request 04/15/2020
NDE Reports AH1543- PIMS Re-Inspection Various Piping Lines 06/20/2022
41060080
AH1548- Long Range Guided Wave Ultrasonic Pipe Screening Results 06/21/2022
410762266
LAS-48146 License Renewal Socket Weld Inspections, ASME Code 06/29/2023
Class 1 Small-Bore Piping Program
Procedures ER-AA-330-012 ASME Code Class 1 Small-Bore Piping Aging Management 6
Program
ER-AA-700-301 License Renewal One-Time Inspection Program 1
LA-AMPBD-SLI Selection Leaching Inspection Sample Basis Document 0
LOP-FP-03 Viking Automatic Deluge Valve Actuation and Reset 30
LOS-FP-R6 Preaction Spray Systems Functional Test 17
Work Orders 01579781-05 Technical Report AM4103-535476-R 03/26/2014
01849461-01 CM Provide Support for UT Exam of DW Liner 03/11/2019
01924992 LR -Exterior Prot. Re-Coat Degraded -WS Inlet Pipe/Valve 07/10/2017
01925023-02 LR -Exterior Prot. Re-Coat Degraded -D WS Inlet Pipe/Valve 07/10/2017
01925025 LR -Exterior Prot. Re-Coat Degraded -E WS Inlet Pipe/Valve 07/10/2017
01934305-01 MM (LROT)/2MS04B Steam Relief Tail Pipe Support NDE 02/23/2019
Inspection Type Designation Description or Title Revision or
Procedure Date
(Prep)
04665916-01 Coating Surface Preparation and Application Report 08/15/2020
04665916-02 MM (LR) Excavate and Inspect Pipe 0FP08A-6" 09/20/2020
04828202-01 LRA OP LOS-FP-R6 U0 Cable Tray Over Lab Sprinkler 06/13/2020
Section E.5
05018308-01 CMO (LR) Perform Cathodic Protection Effectiveness Review 02/21/2021
05108476 Service Water Inlet to VA Compressor Valve Failure 05/24/2021
05109393 Unable to Perform WO 01942056-01 Due to Poor Isolation 05/20/2021
05109396 Replace 0WS041 Isolation Valve 08/12/2021
05125267 CMO (LR) Perform Cathodic Protection Effectiveness Review 01/24/2022
05134421-01 CM (LR) Provide Support for UT Exam of DW Liner 02/11/2023
05165205 Replace the 0WW30A-2"" and Drain Valve 06/19/2023
219788 L2R19 LR-License Renewal One-Time U-2 Class 1/A Socket 03/08/2023
Welds
228543-01 CMO (LR) Perform Cathodic Protection Effectiveness Review 01/04/2023
7