ML23031A197

From kanterella
Jump to navigation Jump to search
Notification of NRC Fire Protection Team Inspection Request for Information, Inspection Report Nos. 05000373/2023011 and 05000374/2023011
ML23031A197
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 01/31/2023
From: Benny Jose
NRC/RGN-III/DORS/EB2
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2023011
Download: ML23031A197 (1)


See also: IR 05000373/2023011

Text

January 31, 2023

David P. Rhoades

Senior Vice President

Constellation Energy Generation, LLC

President and Chief Nuclear Officer (CNO)

Constellation Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: LASALLE COUNTY STATION UNITS 1 AND 2- NOTIFICATION OF NRC

FIRE PROTECTION TEAM INSPECTION REQUEST FOR INFORMATION;

INSPECTION REPORT NUMBERS 05000373/2023011 AND 05000374/2023011

Dear David Rhoades:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region III staff will conduct a Fire Protection Team Inspection (FPTI) at your LaSalle County

Station, Units 1 and 2 beginning May 22, 2023. The inspection will be conducted in accordance

with IP 71111.21N.05, Fire Protection Team Inspection (FPTI), dated June 12, 2019.

The inspection will verify that plant structures, systems, and components (SSCs) and/or

administrative controls credited in the approved Fire Protection Program (FPP) can perform

their licensing basis function.

The schedule for the inspection is as follows:

Preparation week (R-III office): May 15 - 19, 2023

Week 1 of onsite inspection: May 22 - 26, 2023

Week 2 of onsite inspection: June 05 - 09, 2023

Experience has shown that the baseline fire protection team inspections are extremely resource

intensive both for the NRC inspectors and the licensee staff. In order to minimize the inspection

impact on the site and to ensure a productive inspection for both organizations, we have

enclosed a request for documents needed for the inspection. These documents have been

divided into three groups. The first group lists information necessary to aid the inspection team

in choosing specific focus areas for the inspection and to ensure that the inspection team is

adequately prepared for the inspection. It is requested that this information be provided to the

lead inspector via mail or electronically no later than May 01, 2023. The second group of

requested documents consists of those items that the team will review, or need access to,

during the inspection. Please have this information available by the first day of the first onsite

inspection week May 22, 2023. The third group lists the information necessary to aid the

inspection team in tracking issues identified as a result of the inspection. It is requested that this

information be provided to the lead inspector as the information is generated during the

inspection. It is important that all of these documents are up to date and complete in order to

minimize the number of additional documents requested during the preparation and/or the

onsite portions of the inspection.

D. Rhoades -2-

The lead inspector for this inspection is Benny Jose. We understand that our regulatory contact

for this inspection is Jereme Greenblott of your organization. If there are any questions about

the inspection or the material requested, please contact the lead inspector at 630-829-9756 or

via e-mail at benny.jose@nrc.gov.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with the Title 10 of the Code of Federal Regulations 2.390, Public

Inspections, Exemptions, Requests for Withholding.

Sincerely,

Signed by Jose, Benny

on 01/31/23

Benny Jose, Senior Reactor Inspector

Engineering Branch 2

Division of Operating Reactor Safety

Docket Nos. 50-373 and 50-374

License Nos. NPF-11 and NPF-18

Enclosure:

Information Request for Fire Protection

Team Inspection

cc: Distribution via LISTSERV

D. Rhoades -3-

Letter to David P. Rhoades from Benny Jose dated January 31, 2023.

SUBJECT: LASALLE COUNTY STATION UNITS 1 AND 2- NOTIFICATION OF NRC

FIRE PROTECTION TEAM INSPECTION REQUEST FOR INFORMATION;

INSPECTION REPORT NUMBERS 05000373/2023011 AND 05000374/2023011

DISTRIBUTION:

Jessie Quichocho

Marc Ferdas

RidsNrrDorlLpl3

RidsNrrPMLaSalle Resource

RidsNrrDroIrib Resource

John Giessner

Mohammed Shuaibi

Diana Betancourt-Roldan

Allan Barker

R3-DORS

ADAMS Accession Number: ML23031A197

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

OFFICE RIII

NAME BJose:mb

DATE 01/31/2023

OFFICIAL RECORD COPY

FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION

I. Information Requested Prior to the Inspection Preparation Week

The following information is requested by May 01, 2023. If you have any questions

regarding this request, please call the lead inspector as soon as possible. All information

should be sent to Benny Jose (e-mail address benny.jose@nrc.gov). Electronic media is

preferred. The preferred file format is a searchable pdf or Microsoft Excel file on a compact

disk (CD). The CD should be indexed and hyper-linked to facilitate ease of use, if possible.

Please provide three copies of each CD submitted (one for each inspector).

1. One set of hard-copy documents for facility layout drawings which identify plant fire area

delineation; areas protected by automatic fire suppression and detection; and locations

of fire protection equipment.

2. Licensing Information:

a. All Nuclear Regulatory Commission (NRC) Safety Evaluation Reports (SERs)

applicable to fire protection (specifically including those SERs referenced by

the plant fire protection license condition) and all licensing correspondence

referenced by the SERs;

b. All licensing correspondence associated with the comparison to Standard Review

Plan (NUREG-0800), section 9.5.1 or equivalent for licensing purposes;

c. Exemptions from 10 CFR 50.48 and 10 CFR Part 50, appendix R, and associated

licensing correspondence;

d. For pre-1979 plants, all licensing correspondence associated with those sections of

10 CFR Part 50, appendix R, that are not applicable to the plant under

10 CFR 50.48(b)(1). Specifically, the licensing correspondence associated with

those fire protection features proposed or implemented by the licensee that have

been accepted by the NRC staff as satisfying the provisions of appendix A to

Branch Technical Position (BTP) APCSB 9.5-1 reflected in the NRC fire protection

SERs issued before February 19, 1981, (10 CFR 50.48(b)(1)(i)); or those fire

protection features, which were accepted by the NRC staff in comprehensive fire

protection SERs issued before appendix A to BTP APCSB 9.5-1 was published in

August 1976 (10 CFR 50.48(b)(1)(ii)); and

e. The final safety analysis report sections applicable to fire protection, Fire Hazard

analysis, and Safe shutdown analysis in effect at the time of original licensing.

3. Fire Protection Program:

a. A listing of changes made to the Fire Protection Program (FPP) since the last

triennial fire protection inspection;

b. For pre-1979 plants, a listing of the protection methodologies identified under

10 CFR Part 50, appendix R, section III.G used to achieve compliance for fire

zones/areas. That is, please specify whether 3-hour rated fire barriers;

(section III.G.2.a), 20-foot separation along with detection and suppression;

Enclosure

FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION

(section III.G.2.b), 1-hour rated fire barriers with detection and suppression;

(section III.G.2.c), or alternative shutdown capability; (section III.G.3) is used as a

strategy for each selected fire zone/area;

c. A list of Generic Letter (GL) 86-10 evaluations (i.e., a list of adverse to safe

shutdown evaluations);

d. A list of applicable codes and standards related to the design of plant fire

protection features. The list should include National Fire Protection Association

(NFPA) code versions committed to (i.e., the NFPA Codes of Record);

e. List of plant deviations from code commitments and associated evaluations;

f. FPP and/or Fire Protection Plan document;

g. (If available) Fire Probabilistic Risk Assessment (PRA) Summary Report or full

PRA document (if summary document not available);

h. List of the top 25 highest fire CDF scenarios for each unit;

i. List of Fire Areas/Zones ranked by contribution to CDF (i.e., ranking of highest to

lowest risk fire areas/zones);

j. List of the top 25 highest fire LERF scenarios for each unit; and

k. Risk ranking of operator actions and/or recovery actions from your site-specific

PRA sorted by Risk-Achievement Worth and human reliability worksheets for these

items.

4. Facility Information:

a. Piping and instrumentation (flow) diagrams showing the components used to

achieve and maintain hot standby and cold shutdown for fires outside the control

room, and those components used for those areas requiring alternative shutdown

capability;

b. One-line schematic drawings of the electrical distribution system for 4160 Volts

alternating current (Vac) down to 480Vac;

c. One-line schematic drawings of the electrical distribution system for 250 Volts

direct current (Vdc) and 125Vdc systems as applicable;

d. Logic diagrams showing the components used to achieve and maintain hot

standby and cold shutdown; and

e. Safe shutdown cable routing database (requested electronically, such as on

compact disc, if available).

2

FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION

5. Operations Response for Fire Protection:

a. Plant operating procedures which specify the initial operations response to a fire

alarm or annunciator

6. Corrective Actions:

a. Listing of open and closed fire protection condition reports (i.e., problem

identification forms and their resolution reports) since the date of the last triennial

fire protection inspection; and

b. List of current fire impairments, including duration.

7. General Information:

a. A listing of abbreviations and/or designators for plant systems;

b. Organization charts of site personnel down to the level of fire protection staff

personnel; and

c. A phone list for onsite licensee personnel.

II. Information Requested to be Available on First Day of the FIRST ONSITE Inspection

Week (MAY 22, 2023)

The following information is requested to be provided on the first day of inspection. It is

requested that this information be provided on three sets of CDs (searchable, if possible).

1. Program Procedures:

a. Procedures for:

i. Administrative controls (such as allowed out of service times and

compensatory measures) for fire protection systems and components;

ii. Control of transient combustibles; and

iii. Control of hot work

b. List of maintenance and surveillance testing procedures for alternative shutdown

capability and fire barriers, detectors, pumps, and suppression systems; and

c. List of maintenance procedures which routinely verify fuse breaker coordination

in accordance with the post-fire safe shutdown coordination analysis.

2. Design and Equipment Information (for only selected fire zone/area(s) and/or SSCs

to be determined during inspection preparation week):

a. Coordination calculations and/or justifications that verify fuse/breaker coordination

for SSCs that are fed off of the same electrical buses as components in the

protected safe shutdown train;

3

FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION

b. Copies of significant fire protection and post-fire safe shutdown related design

change package descriptions (including their associated 10 CFR 50.59

evaluations) and GL 86-10 (or adverse to safe shutdown) evaluations;

c. Gaseous suppression system pre-operational testing, if applicable, for selected fire

zones/areas;

d. Hydraulic calculations and supporting test data which demonstrate operability for

water suppression systems;

e. Alternating current (ac) coordination calculations for 4160Vac down to 480Vac

electrical systems; and

f. List of all fire protection or appendix R calculations.

3. Assessment and Corrective Actions:

The three most recent fire protection Quality Assurance audits and/or fire protection self-

assessments.

4. Any updates to information previously provided.

5. Classic Fire Protection (for only selected fire zone/area(s) and/or SSCs to be

determined during inspection preparation week):

a. Copy of FPP implementing procedures (e.g., administrative controls, surveillance

testing, and fire brigade);

b. Pre-fire plans for selected fire area(s) and

c. List of fire protection system design changes completed in the last 3 years.

6. Electrical (for only selected fire zone/area(s) and/or SSCs to be determined during

inspection preparation week):

a. Nuclear safety circuit coordination analysis for fuse and breaker coordination of

safe shutdown components;

b. Administrative or configuration control procedures that govern fuse replacement

(e.g., fuse control procedures);

c. Maintenance procedures that verify breaker over-current trip settings to ensure

coordination remains functional, for post-fire nuclear safety capability components;

d. Last surveillance demonstrating operability of those components operated from the

primary control stations;

e. Schematic or elementary diagrams for circuits (only for selected SSCs) to be

reviewed (C-size paper drawings);

4

FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION

f. Cable routing for components and equipment credited for post-fire nuclear safety

capability systems and components;

g. List of post-fire nuclear safety capability system and component design changes

completed, in the last 3 years; and

h. List of identified fire induced circuit failure analyses.

7. Operations

a. List of procedures that implement Cold Shutdown Repairs (if applicable for

selected fire area);

b. For Cold Shutdown Repairs, provide the following:

i. Procedure for inventory and inspection (i.e., needed tools, material,

etc.); and

ii. Most recent inspection and inventory results.

c. List of licensed operator Job Performance Measures for operator actions required

to achieve and maintain post-fire nuclear safety performance criteria (for selected

SSCs and fire area);

d. For Radio communications, provide the following:

i. Communications Plan for firefighting and post-fire safe shutdown

manual actions;

ii. Repeater locations;

iii. Cable routing for repeater power supply cables;

iv. Radio coverage test results; and

v. Radio Dead Spot locations in the plant.

e. Environmental and habitability evaluations for post-fire operator actions

(temperature, smoke, humidity, SCBAs, etc.).

8. Administrative Control, Oversight, and Corrective Action Programs:

a. Self-assessments, peer assessments, and audits of fire protection activities for the

last 3 years;

b. Self-assessments, peer assessments, and audits of post-fire nuclear safety

capability methodology for the last 3 years; and

c. List of fire event analysis reports for the last 3 years.

9. Any updates to information previously provided.

III. Information Requested to be Provided Throughout the Inspection

1. Copies of any corrective action documents generated as a result of the inspection

teams questions or queries during this inspection.

5

FIRE PROTECTION TEAM INSPECTION SUPPORTING DOCUMENTATION

2. Copies of the list of questions submitted by the inspection team members and the

status/resolution of the information requested (provided daily during the inspection to

each inspection team member).

6