Information Request for a NRC Post-Approval Site Inspection for License Renewal 05000374/2023010
ML23186A206
Person / Time
Site: LaSalle  
Issue date: 07/06/2023
From: Matthew Domke
NRC/RGN-III/DORS/RPB1
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2023010
Download: ML23186A206 (1)


See also: IR 05000374/2023010

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE ROAD, SUITE 210

LISLE, IL 60532-4352

David P. Rhoades

Senior Vice President

Constellation Energy Generation, LLC

President and Chief Nuclear Officer (CNO)

Constellation Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT:

LASALLE COUNTY STATION, UNIT 2 - INFORMATION REQUEST FOR A

NRC POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL

05000374/2023010

Dear David Rhoades:

On September 11, 2023, the U.S. Nuclear Regulatory Commission (NRC) will begin a Post-

Approval Site Inspection for License Renewal at Lasalle County Station, Unit 2. This inspection

will be performed in accordance with NRC Inspection Procedure (IP) 71003. This inspection will

focus on verifying that license conditions added as part of your renewed license and a sample

of license renewal commitments have been implemented.

In order to minimize the inspection impact on the site and to ensure a productive inspection for

both parties, we have enclosed a request for information needed for the inspection. It is

important that all of these documents are up to date and complete in order to minimize the

number of additional documents requested during the preparation and/or the on-site portions of

the inspection. Insofar as possible, this information should be provided electronically to the lead

inspector. The information request has been divided into two groups:

The first group lists information necessary for our initial inspection scoping and in-office

preparation activities. During the in-office preparation activities, the team will identify as

much as possible the information and activities to be reviewed during the inspection.

This information should be provided to the lead inspector by August 21, 2023.

The second group includes the additional information required for the team to

review selected activities. This information should be available to the team onsite

September 11, 2023. It is also requested that corrective action documents and/or

questions developed during the inspection be provided to the lead inspector as the

documents are generated.

The lead inspector for this inspection is Mr. Matthew Domke. We understand that our licensing

contact for this inspection is Mr. Jereme Greenblott of your organization. If there are any

questions about the inspection or the material requested in the enclosure, please contact the

lead inspector at (630) 829-9562.

July 6, 2023

D. Rhoades

2

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget Control Number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,

a request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget Control Number.

In accordance with Title 10, Code of Federal Regulations (CFR), Section 2.390 of the NRC's

"Rules of Practice," a copy of this letter and its enclosure will be available electronically for

public inspection in the NRC Public Document Room or from the Publicly Available Records

System (PARS) component of NRC's Agencywide Documents Access and Management

System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

Matthew Domke, Reactor Inspector

Engineering Reactor Projects Branch

Division of Operating Reactor Safety

Docket Nos. 50-373; 50-374

License Nos. NPF-11; NPF-18

Enclosure:

Post-Approval Site Inspection

License Renewal Request for Information

cc: Distribution via LISTSERV

Signed by Domke, Matthew

on 07/06/23

D. Rhoades

3

Letter to David Rhoades from Matthew Domke dated July 06, 2023.

SUBJECT:

LASALLE COUNTY STATION, UNIT 2 - INFORMATION REQUEST FOR A

NRC POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL

05000374/2023010

DISTRIBUTION:

Jeffrey Josey

RidsNrrDorlLpl3

RidsNrrPMLaSalle Resource

RidsNrrDroIrib Resource

John Giessner

Mohammed Shuaibi

Diana Betancourt-Roldan

Allan Barker

R3-DORS

ADAMS Accession Number: ML23186A206

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

OFFICE

RIII

NAME

MDomke:ls

DATE

07/06/2023

OFFICIAL RECORD COPY

POST-APPROVAL SITE INSPECTION LICENSE RENEWAL

REQUEST INFORMATION

Inspection Report: 05000374/2023010

Inspection Dates:

September 11, 2023 - September 29, 2023

Inspection Procedure:

Inspection Procedure 71003 Post-Approval Site Inspection for

License Renewal

Lead Inspector:

Matthew Domke

I.

Information Requested Prior to the On-site Inspection Week on August 21, 2023

The following information is requested by August 21, 2023, or sooner, to facilitate

inspection preparation. (Please provide the information electronically in pdf files, Excel,

or other searchable formats, preferably on station/corporate online portal for document

sharing. The electronic information should be identified by unit, contain descriptive

names, and be indexed and hyperlinked to facilitate ease of use. Information in lists

should contain enough information to be easily understood by someone who has

knowledge of light water reactor technology).

1.

Provide a list of your license renewal commitments with an approximate

completion status of each.

2.

Provide a list of your Aging Management Programs (AMPs), copies of the

program basis document for each, and a listing of the action tracking items for

each.

3.

For AMPs that are one-time inspection programs, provide a list of completed

work order numbers for inspections that have been completed. This may be

incorporated with the previous item and should include identification of the

inspected component.

4.

Provide list of action request reports associated with licensee renewal

commitments, evaluations including 10CFR50.59 screenings or 50.59

evaluations, and time-limited aging analyses generated since submittal of

the license renewal application.

5.

Provide current management and license renewal organizational charts.

6.

Provide electronic copies of Updated Final Safety Analysis Report, Technical

Specifications, Technical Specifications Bases, and Technical Requirements

Manual.

7.

Provide copies of any internal/external self-assessments and associated

corrective action documents generated in preparation for the inspection.

Enclosure

II.

Information Requested to be Available When the Inspectors Arrive On-Site on

September 11, 2023

1.

Documentation demonstrating completion of license renewal commitments

completed as of the inspection date. For example, this may be in the form of a

binder for each commitment which includes the implementing documentation and

references.

III.

Information Requested to be Provided Throughout the Inspection

1.

Copies of any corrective action documents generated as a result of the teams

questions or queries during this inspection.

2.

Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily during the inspection

to each team member).

If you have questions regarding the information requested, please contact the lead inspector.