County Station - Triennial Fire Protection Inspection Report 05000373/2020012 and 05000374/2020012
ML20157A258
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 06/05/2020
From: Paul Zurawski
Engineering Branch 3
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2020012
Preceding documents:
Download: ML20157A258 (8)


Text

June 05, 2020

SUBJECT:

LASALLE COUNTY STATION - TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000373/2020012 AND 05000374/2020012

Dear Mr. Hanson:

On May 15, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at LaSalle County Station and discussed the results of this inspection with Mr. P. Hansett, plant manager and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Paul J. Zurawski, Chief (Acting)

Engineering Branch 3 Division of Reactor Safety

Docket Nos. 05000373 and 05000374 License Nos. NPF-11 and NPF-18

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000373 and 05000374

License Numbers:

NPF-11 and NPF-18

Report Numbers:

05000373/2020012 and 05000374/2020012

Enterprise Identifier: I-2020-012-0022

Licensee:

Exelon Generation Company, LLC

Facility:

LaSalle County Station

Location:

Marseilles, IL

Inspection Dates:

April 27, 2020 to May 15, 2020

Inspectors:

J. Benjamin, Senior Reactor Inspector

A. Dahbur, Senior Reactor Inspector

A. Shaikh, Senior Reactor Inspector

Approved By:

Paul J. Zurawski, Chief (Acting)

Engineering Branch 3

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial fire protection inspection at LaSalle County Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin telework. The inspection documented below was determined that the objectives and requirements stated in the IP could be performed remotely.

REACTOR SAFETY

===71111.21N.05 - Fire Protection Team Inspection (FPTI)

SSC Credited for Fire Prevention, Detection, Suppression, or Post-Fire SSD Review (IP Section 03.01)===

The inspectors verified that following selected components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA).

(1) High Pressure Core Spray (HPCS)
(2) Automatic Depressurization System (ADS) Division II
(3) Diesel Fire Pumps

Fire Protection Program Administrative Controls (IP Section 03.02) (1 Sample)

The inspectors verified that the following selected control or process is implemented in accordance with the licensees current licensing basis. If applicable, ensure that the licensees FPP contains adequate procedures to implement the selected administrative control. Verify that the selected administrative control meets the requirements of all committed industry standards.

(1) Control of Transient Combustible Material

Fire Protection Program Changes/Modifications (IP Section 03.03) (1 Sample)

(1) Generic Letter 86-10 Evaluation for Removal of Fire Detectors in Unit 1 and Unit 2 Containment

For the selected change/modification, the inspectors verified the following:

a.

Changes to the approved FPP do not constitute an adverse effect on the ability to safely shutdown.

b.

The adequacy of the design modification, if applicable.

c.

Assumptions and performance capability stated in the SSA have not been degraded through changes or modifications.

d.

The FPP documents, such as the Updated Final Safety Analysis Report, fire protection report, FHA, and SSA were updated consistent with the FPP or design change.

e.

Post-fire SSD operating procedures, such as abnormal operating procedures, affected by the modification were updated.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On May 15, 2020, the inspectors presented the triennial fire protection inspection results to Mr. P. Hansett, plant manager and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.21N.05 Calculations

L-002808

Fire Protection Hydraulic Model

04/20/2004

Corrective Action

Documents

03998250

LOS-FP-SR2 Yard Loop Flow Test Results

04/13/2017

213919

Transient Combustible Permit Will Exceed 30 Days

01/25/2019

242799

Crack in Door 240

04/23/2019

272605

LOS-FP-SR2 Yard Loop Flow Test Results

08/16/2019

275147

Door 305 Has a Crack in the Door Skin

08/28/2019

Drawings

1E-1-4201AB

Schematic Diagram - Automatic Depressurization System

U

1E-1-4201AD

Schematic Diagram - Automatic Depressurization System

(Part 4)

AG

1E-1-4222AC

Schematic Diagram - High Pressure Core Spray System

(Part 3)

R

1E-1-4222AE

Schematic Diagram - High Pressure Core Spray System

(Part 5)

T

1E-4222AD

Schematic Diagram - High Pressure Core Spray System

(Part 4)

Q

HP-1

High Pressure Core Spray System

NB-1

Automatic Depressurization System

Engineering

Changes

EC 380790

MSO Mod for Valve 1E22-F004

08/06/2012

EC 380791

MSO Mod for Valve 2E22-F004

04/17/2012

EC 380791

MSO Mod for Valve 2E22-F004

04/05/2012

EC-380784

MSO Perform IN 92-18 Modification for SRV (Scenarios 1,

3A, 3B and 3C)

Engineering

Evaluations

29906

GL 86-10 Evaluation for Removal of Fire Detectors in Unit 1

and Unit 2 Containment at LaSalle

11/06/2019

FPP, Appendix H

Safe Shutdown Analysis

Procedures

CC-AA-209

Fire Protection Program Configuration Change Review

CC-AA-211

Fire Protection Program

LA-PBD-AMP-

XI.M26

Gall Program XI.M26 - Fire Protection

LGA-001

RPV Control

LOA-FX-101

Unit 1 Safe Shutdown with a Fire in the Control Room or

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AEER

LOP-DO-01

Receiving and Sampling New Diesel Fuel Oil

OP-AA-201-007

Fire Protection System Impairment Control

OP-AA-201-009

Control of Transient Combustible Material

Work Orders

01799165

Technical Requirement Yard Loop Flow Test

04/12/2017

04627572

Technical Requirement Yard Loop Flow Test

08/16/2019

04696776

Door 240 Needs to Be Replaced

09/06/2019

04982035

FP Deluge Valve Lineup

2/04/2020

WO 01040897

Non-Destructive Functional Test of 2B D/G Room Fire

Damper ETLS

WO 01057048

Non-Destructive Functional Test of 1B D/G Room Fire

Damper ETLS

07/03/2012

WO 01672891

Non-Destructive Functional Test of 2B D/G Room Fire

Damper ETLS

WO 01679528

Non-Destructive Functional Test of 1B D/G Room Fire

Damper ETLS

05/05/2017

WO 01782130

Inspection of Fire Door Separating Safety Related Fire

Areas

05/04/2015

WO 01877671

LES-Co-O3: CO2 System and Functional Test for 2E22-

S001

06/01/2017

WO 01878192

Fire Damper Visual Inspection

09/28/2017

WO 01929284

LES-CO-O3: CO2 System Functional and Flow Test for 1B

D/G Room

2/03/2018

WO 04647331

LRA LES-CO-O3: CO2 System Finctional and Flow Test for

2E22-S001

11/27/2018

WO 04695869

LRA Fire Damper Visual Inspection

09/23/2019

WO 04743107

LRA LES-CO-O3: CO2 System Functional and Flow Test

for 1B D/G Room

10/31/2019

WO 04914828

EWP-LRA-MM-Inspection of Fire Doors Separating SR Fire

Areas

11/08/2019

WO 04984635

LOS-HP-Q1 U2 HPCS Pump Run

03/13/2020

WO 05027823

LOS-FP-D1 Attachment 1 1A FP Door Daily Surveillance

0