IR 05000373/2020012
| ML20157A258 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 06/05/2020 |
| From: | Paul Zurawski Engineering Branch 3 |
| To: | Bryan Hanson Exelon Generation Co, Exelon Nuclear |
| References | |
| IR 2020012 | |
| Preceding documents: |
|
| Download: ML20157A258 (8) | |
Text
June 05, 2020
SUBJECT:
LASALLE COUNTY STATION - TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000373/2020012 AND 05000374/2020012
Dear Mr. Hanson:
On May 15, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at LaSalle County Station and discussed the results of this inspection with Mr. P. Hansett, plant manager and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Paul J. Zurawski, Chief (Acting)
Engineering Branch 3 Division of Reactor Safety
Docket Nos. 05000373 and 05000374 License Nos. NPF-11 and NPF-18
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000373 and 05000374
License Numbers:
Report Numbers:
05000373/2020012 and 05000374/2020012
Enterprise Identifier: I-2020-012-0022
Licensee:
Exelon Generation Company, LLC
Facility:
LaSalle County Station
Location:
Marseilles, IL
Inspection Dates:
April 27, 2020 to May 15, 2020
Inspectors:
J. Benjamin, Senior Reactor Inspector
A. Dahbur, Senior Reactor Inspector
A. Shaikh, Senior Reactor Inspector
Approved By:
Paul J. Zurawski, Chief (Acting)
Engineering Branch 3
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial fire protection inspection at LaSalle County Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin telework. The inspection documented below was determined that the objectives and requirements stated in the IP could be performed remotely.
REACTOR SAFETY
===71111.21N.05 - Fire Protection Team Inspection (FPTI)
SSC Credited for Fire Prevention, Detection, Suppression, or Post-Fire SSD Review (IP Section 03.01)===
The inspectors verified that following selected components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA).
- (1) High Pressure Core Spray (HPCS)
- (2) Automatic Depressurization System (ADS) Division II
- (3) Diesel Fire Pumps
Fire Protection Program Administrative Controls (IP Section 03.02) (1 Sample)
The inspectors verified that the following selected control or process is implemented in accordance with the licensees current licensing basis. If applicable, ensure that the licensees FPP contains adequate procedures to implement the selected administrative control. Verify that the selected administrative control meets the requirements of all committed industry standards.
- (1) Control of Transient Combustible Material
Fire Protection Program Changes/Modifications (IP Section 03.03) (1 Sample)
- (1) Generic Letter 86-10 Evaluation for Removal of Fire Detectors in Unit 1 and Unit 2 Containment
For the selected change/modification, the inspectors verified the following:
a.
Changes to the approved FPP do not constitute an adverse effect on the ability to safely shutdown.
b.
The adequacy of the design modification, if applicable.
c.
Assumptions and performance capability stated in the SSA have not been degraded through changes or modifications.
d.
The FPP documents, such as the Updated Final Safety Analysis Report, fire protection report, FHA, and SSA were updated consistent with the FPP or design change.
e.
Post-fire SSD operating procedures, such as abnormal operating procedures, affected by the modification were updated.
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On May 15, 2020, the inspectors presented the triennial fire protection inspection results to Mr. P. Hansett, plant manager and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.21N.05 Calculations
Fire Protection Hydraulic Model
04/20/2004
Corrective Action
Documents
03998250
LOS-FP-SR2 Yard Loop Flow Test Results
04/13/2017
213919
Transient Combustible Permit Will Exceed 30 Days
01/25/2019
242799
Crack in Door 240
04/23/2019
272605
LOS-FP-SR2 Yard Loop Flow Test Results
08/16/2019
275147
Door 305 Has a Crack in the Door Skin
08/28/2019
Drawings
Schematic Diagram - Automatic Depressurization System
U
Schematic Diagram - Automatic Depressurization System
(Part 4)
AG
Schematic Diagram - High Pressure Core Spray System
(Part 3)
R
Schematic Diagram - High Pressure Core Spray System
(Part 5)
T
Schematic Diagram - High Pressure Core Spray System
(Part 4)
Q
HP-1
High Pressure Core Spray System
NB-1
Automatic Depressurization System
Engineering
Changes
08/06/2012
04/17/2012
04/05/2012
MSO Perform IN 92-18 Modification for SRV (Scenarios 1,
3A, 3B and 3C)
Engineering
Evaluations
29906
GL 86-10 Evaluation for Removal of Fire Detectors in Unit 1
and Unit 2 Containment at LaSalle
11/06/2019
FPP, Appendix H
Safe Shutdown Analysis
Procedures
Fire Protection Program Configuration Change Review
LA-PBD-AMP-
XI.M26
Gall Program XI.M26 - Fire Protection
LGA-001
RPV Control
LOA-FX-101
Unit 1 Safe Shutdown with a Fire in the Control Room or
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
LOP-DO-01
Receiving and Sampling New Diesel Fuel Oil
Fire Protection System Impairment Control
Control of Transient Combustible Material
Work Orders
01799165
Technical Requirement Yard Loop Flow Test
04/12/2017
04627572
Technical Requirement Yard Loop Flow Test
08/16/2019
04696776
Door 240 Needs to Be Replaced
09/06/2019
04982035
FP Deluge Valve Lineup
2/04/2020
Non-Destructive Functional Test of 2B D/G Room Fire
Damper ETLS
Non-Destructive Functional Test of 1B D/G Room Fire
Damper ETLS
07/03/2012
Non-Destructive Functional Test of 2B D/G Room Fire
Damper ETLS
Non-Destructive Functional Test of 1B D/G Room Fire
Damper ETLS
05/05/2017
Inspection of Fire Door Separating Safety Related Fire
Areas
05/04/2015
LES-Co-O3: CO2 System and Functional Test for 2E22-
S001
06/01/2017
Fire Damper Visual Inspection
09/28/2017
LES-CO-O3: CO2 System Functional and Flow Test for 1B
D/G Room
2/03/2018
LRA LES-CO-O3: CO2 System Finctional and Flow Test for
11/27/2018
LRA Fire Damper Visual Inspection
09/23/2019
LRA LES-CO-O3: CO2 System Functional and Flow Test
for 1B D/G Room
10/31/2019
EWP-LRA-MM-Inspection of Fire Doors Separating SR Fire
Areas
11/08/2019
LOS-HP-Q1 U2 HPCS Pump Run
03/13/2020
LOS-FP-D1 Attachment 1 1A FP Door Daily Surveillance
0