County Station - Triennial Fire Protection Inspection Report 05000373/2020012 and 05000374/2020012
ML20157A258
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 06/05/2020
From: Paul Zurawski
Engineering Branch 3
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2020012
Preceding documents:
Download: ML20157A258 (8)


Text

June 05, 2020

SUBJECT:

LASALLE COUNTY STATION - TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000373/2020012 AND 05000374/2020012

Dear Mr. Hanson:

On May 15, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at LaSalle County Station and discussed the results of this inspection with Mr. P. Hansett, plant manager and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Paul J. Zurawski, Chief (Acting)

Engineering Branch 3 Division of Reactor Safety Docket Nos. 05000373 and 05000374 License Nos. NPF-11 and NPF-18

Enclosure:

As stated

Inspection Report

Docket Numbers: 05000373 and 05000374 License Numbers: NPF-11 and NPF-18 Report Numbers: 05000373/2020012 and 05000374/2020012 Enterprise Identifier: I-2020-012-0022 Licensee: Exelon Generation Company, LLC Facility: LaSalle County Station Location: Marseilles, IL Inspection Dates: April 27, 2020 to May 15, 2020 Inspectors: J. Benjamin, Senior Reactor Inspector A. Dahbur, Senior Reactor Inspector A. Shaikh, Senior Reactor Inspector Approved By: Paul J. Zurawski, Chief (Acting)

Engineering Branch 3 Division of Reactor Safety Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial fire protection inspection at LaSalle County Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin telework. The inspection documented below was determined that the objectives and requirements stated in the IP could be performed remotely.

REACTOR SAFETY

71111.21N.05 - Fire Protection Team Inspection (FPTI) SSC Credited for Fire Prevention, Detection, Suppression, or Post-Fire SSD Review (IP Section 03.01)

The inspectors verified that following selected components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA).

(1) High Pressure Core Spray (HPCS)
(2) Automatic Depressurization System (ADS) Division II
(3) Diesel Fire Pumps

Fire Protection Program Administrative Controls (IP Section 03.02) (1 Sample)

The inspectors verified that the following selected control or process is implemented in accordance with the licensees current licensing basis. If applicable, ensure that the licensees FPP contains adequate procedures to implement the selected administrative control. Verify that the selected administrative control meets the requirements of all committed industry standards.

(1) Control of Transient Combustible Material

Fire Protection Program Changes/Modifications (IP Section 03.03) (1 Sample)

(1) Generic Letter 86-10 Evaluation for Removal of Fire Detectors in Unit 1 and Unit 2 Containment For the selected change/modification, the inspectors verified the following:

a.

Changes to the approved FPP do not constitute an adverse effect on the ability to safely shutdown.

b.

The adequacy of the design modification, if applicable.

c.

Assumptions and performance capability stated in the SSA have not been degraded through changes or modifications.

d.

The FPP documents, such as the Updated Final Safety Analysis Report, fire protection report, FHA, and SSA were updated consistent with the FPP or design change.

e.

Post-fire SSD operating procedures, such as abnormal operating procedures, affected by the modification were updated.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On May 15, 2020, the inspectors presented the triennial fire protection inspection results to Mr. P. Hansett, plant manager and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.21N.05 Calculations L-002808 Fire Protection Hydraulic Model 04/20/2004

Corrective Action 03998250 LOS-FP-SR2 Yard Loop Flow Test Results 04/13/2017

Documents 04213919 Transient Combustible Permit Will Exceed 30 Days 01/25/2019

242799 Crack in Door 240 04/23/2019

272605 LOS-FP-SR2 Yard Loop Flow Test Results 08/16/2019

275147 Door 305 Has a Crack in the Door Skin 08/28/2019

Drawings 1E-1-4201AB Schematic Diagram - Automatic Depressurization System U

1E-1-4201AD Schematic Diagram - Automatic Depressurization System AG

(Part 4)

1E-1-4222AC Schematic Diagram - High Pressure Core Spray System R

(Part 3)

1E-1-4222AE Schematic Diagram - High Pressure Core Spray System T

(Part 5)

1E-4222AD Schematic Diagram - High Pressure Core Spray System Q

(Part 4)

HP-1 High Pressure Core Spray System 2

NB-1 Automatic Depressurization System 2

Engineering EC 380790 MSO Mod for Valve 1E22-F004 08/06/2012

Changes EC 380791 MSO Mod for Valve 2E22-F004 04/17/2012

EC 380791 MSO Mod for Valve 2E22-F004 04/05/2012

EC-380784 MSO Perform IN 92-18 Modification for SRV (Scenarios 1, 2

3A, 3B and 3C)

Engineering 629906 GL 86-10 Evaluation for Removal of Fire Detectors in Unit 1 11/06/2019

Evaluations and Unit 2 Containment at LaSalle

FPP, Appendix H Safe Shutdown Analysis 9

Procedures CC-AA-209 Fire Protection Program Configuration Change Review 6

CC-AA-211 Fire Protection Program 8

LA-PBD-AMP- Gall Program XI.M26 - Fire Protection 1

XI.M26

LGA-001 RPV Control 18

LOA-FX-101 Unit 1 Safe Shutdown with a Fire in the Control Room or 30

Inspection Type Designation Description or Title Revision or

Procedure Date

AEER

LOP-DO-01 Receiving and Sampling New Diesel Fuel Oil 40

OP-AA-201-007 Fire Protection System Impairment Control 0

OP-AA-201-009 Control of Transient Combustible Material 24

Work Orders 01799165 Technical Requirement Yard Loop Flow Test 04/12/2017

04627572 Technical Requirement Yard Loop Flow Test 08/16/2019

04696776 Door 240 Needs to Be Replaced 09/06/2019

04982035 FP Deluge Valve Lineup 02/04/2020

WO 01040897 Non-Destructive Functional Test of 2B D/G Room Fire 0

Damper ETLS

WO 01057048 Non-Destructive Functional Test of 1B D/G Room Fire 07/03/2012

Damper ETLS

WO 01672891 Non-Destructive Functional Test of 2B D/G Room Fire 0

Damper ETLS

WO 01679528 Non-Destructive Functional Test of 1B D/G Room Fire 05/05/2017

Damper ETLS

WO 01782130 Inspection of Fire Door Separating Safety Related Fire 05/04/2015

Areas

WO 01877671 LES-Co-O3: CO2 System and Functional Test for 2E22- 06/01/2017

S001

WO 01878192 Fire Damper Visual Inspection 09/28/2017

WO 01929284 LES-CO-O3: CO2 System Functional and Flow Test for 1B 02/03/2018

D/G Room

WO 04647331 LRA LES-CO-O3: CO2 System Finctional and Flow Test for 11/27/2018

2E22-S001

WO 04695869 LRA Fire Damper Visual Inspection 09/23/2019

WO 04743107 LRA LES-CO-O3: CO2 System Functional and Flow Test 10/31/2019

for 1B D/G Room

WO 04914828 EWP-LRA-MM-Inspection of Fire Doors Separating SR Fire 11/08/2019

Areas

WO 04984635 LOS-HP-Q1 U2 HPCS Pump Run 03/13/2020

WO 05027823 LOS-FP-D1 Attachment 1 1A FP Door Daily Surveillance 0

6