ML20217N485
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ML20217N485 | |
Person / Time | |
---|---|
Site: | Portsmouth Gaseous Diffusion Plant, 07007001 |
Issue date: | 08/15/1997 |
From: | Rifakes G UNITED STATES ENRICHMENT CORP. (USEC) |
To: | Jazel Parks ENERGY, DEPT. OF |
References | |
NUDOCS 9708260198 | |
Download: ML20217N485 (5) | |
Similar Documents at Portsmouth Gaseous Diffusion Plant, 07007001 | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N5861999-10-22022 October 1999
[Table view]Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-7002/99-09 Issued on 990827 ML20217H6911999-10-19019 October 1999 Ack Receipt of 990928 Application to Revise Technical Safety Requirements 2.2.3.15 & 2.7.3.14.Initial Administrative Review Finds Application Acceptable.Completion of Review Is Anticipated by 991215 ML20217N7591999-10-18018 October 1999 Provides Monthly Update on Progress of Installation of Seismic Upgrade Mods to Bldgs C-331 & C-335 ML20217M3861999-10-15015 October 1999 Provides Addl Changes to SAR Update Certificate Amend Request,Containing Changes That Resulted from re-evaluation of Autoclave head-to-shell O-ring Leakage Analysis Provided by DOE SAR Repts ML20217M2961999-10-15015 October 1999 Provides Addl Changes to Updated SAR Certificate Amend Request,Including Changes Made IAW Item 5 of Plan of Action Schedule for Compliance Plan Issue 2 & Changes That Resulted from Reevaluation of Autoclave head-to-shell O-ring ML20217N9141999-10-15015 October 1999 Forwards Rev 6 of NCS Cap,Providing Addl Details within Subtask 3.3,addl Ncsa/E Reviews & Establishes New Milestone to Conduct Addl Reviews IAW Procedure XP2=EG-NS1037, Review of Non-Priority 1 & 2 ML20217G1731999-10-14014 October 1999 Requests Addl Info Re Applications Dtd 990924,requesting Amends to Cocs for Paducah & Portsmouth GDPs for Revised QA Programs.Encl Identifies Specific Info Needed.Info Should Be Provided within 30 Days ML20217G4671999-10-14014 October 1999 Forwards Proprietary Insp Rept 70-7002/99-207 on 990920-23. No Violations Noted.Under Provisions of Section 2.790(d), Repts Containing Info Related to Licensee MC&A Program, Exempt from Public Disclosure ML20217G1811999-10-14014 October 1999 Forwards Reissued Amend to Coc for Usec Paducah Gdp.Coc Corrects Coc Issued on 991006.Amend Number & Effective Date Were Inadvertently Incorporated as 3 & 991026,instead of 4 & 991105 ML20217F6801999-10-12012 October 1999 Forwards Updated Paducah GDP Certificate Amend Requests at NRC for Approval ML20217F5481999-10-0808 October 1999 Discusses Insp Rept 70-7002/99-12 on 990810-0920 at Ports- Mouth Gaseous Diffusion Plant.No Cited Violations of NRC Requirements Were Identified During Insp ML20217B3521999-10-0606 October 1999 Forwards Amend 3 to Certificate of Compliance GDP-1 to Revise Six Technical Safety Requirements Sections.Sections Are 2.1.4.17,2.1.4.8,2.3.4.1,2.3.4.4,2.3.4.16 & 3.10.4.b. Compliance Evaluation Rept Also Encl ML20217B2801999-10-0606 October 1999 Forwards Insp Rept 70-7001/99-203 on 990921-23.No Violations Noted ML20217B6121999-10-0606 October 1999 Forwards Copy of Security Incident Log for Month of Sept 1999 ML20212K8941999-10-0404 October 1999 Forwards Insp Rept 70-7001/99-10 on 990720-0907 & Forwards NOV Indicating That Some Personnel Were Incorrectly Granted Unescorted Access to Controlled Access Areas Without Having Necessary Specific Training ML20217A4781999-10-0404 October 1999 Forwards Revised Event Rept 99-17,for Event Resulting from Determination That Sprinkler Sys Not Capable of Meeting Operability Requirements.Caused by Mineral Deposits.Provided Following Completion of Root Cause Evaluation ML20216J8931999-10-0101 October 1999 Forwards Copy of Security Incident Log & Associated Info for Sept 1999 ML20216J9081999-09-30030 September 1999 Forwards Revised Written Event Rept 99-10,rev 3,pertaining to Corroded Fire Sprinkler Heads Affecting Operability of high-pressure Fire Water (HPFW) Sprinkler Sys.No Commitment Contained in Rept ML20217M3701999-09-29029 September 1999 Submits bi-monthly Update on Progress of Mods to Upgrade Audibility of Criticality Accident Alarm Sys (Caas).Schedule for CAAS Audibility Upgrades Attached ML20212H5991999-09-27027 September 1999 Responds to Violations Noted in Insp Rept 70-7002/99-09. Corrective Actions:Engineering Evaluated Site Rail Track Insp Process for Improvement ML20216J7891999-09-27027 September 1999 Provides Required 30-day Event Rept 99-19 for Event That Resulted from Failure of Cascade Automatic Data Processing Data Processing Smoke Detection Sys at Portsmouth Gaseous Diffusion Plant.Encl 2 Is List of Commitments Made in Rept ML20212H1251999-09-24024 September 1999 Notifies NRC of Change in Regulatory Commitments Associated with Submittal Date for Update of Application SAR Chapter 3.Specifics of Commitment Changes of Listed ML20212H3801999-09-24024 September 1999 Responds to 990723 RAI Re 1999 Annual Update to Certification Applications ML20212G9401999-09-23023 September 1999 Responds to 990806 Reply to NOV in Ltr with Insp Rept 70-7002/99-04.Revised Reply Reviewed & Responses to Violations 1.B & 1.C Do Not Fully Address Needs as Clarified in 990715 Telcon.Resubmit Response within 30 Days of Ltr ML20212G0551999-09-23023 September 1999 Provides Revised 30-day Event Rept 99-06 for Emergency Condition That Was Declared Alert at Portsmouth Gaseous Diffusion Plant ML20212H3721999-09-22022 September 1999 Forwards NRC Form 790 Classification Record Documents for Paducah & Portsmouth GDPs That Were Generated During Month of Aug 1999.Without Encl ML20212F0981999-09-22022 September 1999 Forwards Insp Rept 70-7001/99-12 on 990830-0902.Purpose of Insp Was to Determine If Security Requirements Adequately Implemented & Included Review of Approved Plant Security Plan.No Violations Identified ML20217J1211999-09-20020 September 1999 Submits Listed Comments on NRC Proposed Rule, Reporting Requirements for Nuclear Power Reactors ML20212D4291999-09-17017 September 1999 Forwards Required 30-day Written Event Rept Re Criticality Accident Alarm Sys Response Time in Bldg C-710.Encl 2 Contains Commitments Contained in Submittal ML20212D4231999-09-16016 September 1999 Informs That Review of Event Rept Er 99-12 Revealed Listed Two Statements Inadvertently Omitted from Document ML20212B6611999-09-15015 September 1999 Forwards Insp Rept 70-7001/99-202 on 990816-20.No Violations Noted ML20212D2361999-09-15015 September 1999 Submits Monthly Update on Progress of Installation of Seismic Upgrade Mods to Bldgs C-331 & C-335 ML20212A5441999-09-14014 September 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-7001/99-07 ML20212A5531999-09-14014 September 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-7001/99-08 ML20216E6911999-09-13013 September 1999 Forwards 30-day Written Rept Er 99-18,re Actuation of Cascade ADP Smokehead in X-333 Bldg Low Assay Withdrawal Station.Caused by UF6 Release from Law A/B Compressor Shaft Seal Area.Planned C/As Will Be Provided in Revised Rept ML20211Q7761999-09-10010 September 1999 Forwards Insp Rept 70-7002/99-205 on 990816-20.No Violations Noted.Insp Consisted of Selective Exams of Computer Systems, Representative Records & Interviews with Personnel ML20211Q9951999-09-10010 September 1999 Forwards 30-day Written Rept ER-99-12,re Loss of Power to Autoclave Position 1 North & 1 South Process Gas Leak Detection (Pgld) in Bldg C-333-A.Caused by Electrical Short Circuit.Submitted Work Request 501636 for PI SEX-4 ML20211P2091999-09-0909 September 1999 Provides Staff Written Clarification of NRC Reporting Expectations of When Double Contingency Losses Should Be Reported to NRC IAW Bulletin 91-001, Reporting Loss of Criticality Safety Controls, & Suppl ML20216E4891999-09-0909 September 1999 Responds to Violations Noted in Insp Rept 70-7001/99-08. Corrective Actions:On 990602 Responsible Organization Manager Met with FP Engineer Performing Bldg Reappraisal & Made Clear Expectation for Prompt Reporting of Deficiencies ML20211Q8041999-09-0808 September 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-7002/99-05 ML20211Q7171999-09-0808 September 1999 Forwards Required 30-day Written Event Rept 99-14,rev 1,re 990628 Event Involving Actuation of Brake Sys on Liquid U Hexafluoride Handling Crane at Plant.Revised Rept Includes Corrective Actions.Commitments in Rept Also Encl ML20211N8951999-09-0707 September 1999 Forwards Required 30 Day Event Rept 99-17,for Event That Resulted from Determination That 13 Sprinkler Sys Associated with High Pressure Fire Water Sys in Process Buildings Were Not Capable of Meeting Operability Requirements ML20211P3831999-09-0303 September 1999 Forwards Coc GDP-1,amend 3 & Coc GDP-2,amend 4 for Paducah (Pgdp) & Portsmouth (Ports) Gdps,Respectively by Revising Pgdp & Ports QAPs in Vol 3 of Respective Certificate Applications ML20211M6401999-09-0303 September 1999 Forwards Security Incident Log for Month of Aug 1999,per Requirements of 10CFR95.57(b) ML20211L6441999-09-0202 September 1999 Forwards Insp Rept 70-7001/99-11 on 990802-06.No Violations Noted.Insp Consisted of Selective Exam of Procedures & Representative Records,Interviews with Personnel & Observations of Activities in Progress ML20211M6941999-09-0202 September 1999 Forwards 30-day Written Event Rept 99-09,rev 1,for Event Involving Actuation of Brake Sys on Liquid U Hexafluoride Handling Crane at Plant.Revised Rept Includes Root Cause & Corrective Actions.List of Commitments,Included ML20211M3551999-09-0101 September 1999 Forwards Copy of Security Incident Log & Associated Info for Month of Aug 1999,IAW 10CFR95.57(b) ML20211L4871999-09-0101 September 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-7002/99-07 Issued on 990709 ML20211K2081999-08-31031 August 1999 Discusses 990730 Revised Response to RAI Transmitted by NRC Re 990528 Response for Severity Level IV Violations Identified in Insp Rept 70-7002/99-06 ML20211K4041999-08-31031 August 1999 Forwards Responses to Remaining NRC Questions/Comments from 980601 & 0709 NRC RAIs Re SAR Update 1999-09-09 Category:EXTERNAL CORRESPONDENCE MONTHYEARML20211M7031999-08-30030 August 1999
[Table view]Forwards Proprietary Rev 0 to Arming & Arrest Authority Security Plan for Paducah & Portsmouth Gaseous Diffusion Plants, for Review & Approval.Encl Withheld ML20211D6341999-08-16016 August 1999 Forwards Proprietary Info Containing Process That Would Be Followed Once Deposit Identified That Could Cause Usec to Exceed NRC Possession Limit.Proprietary Encl Withheld ML20206U8021999-05-13013 May 1999 Forwards DOE Regulatory Oversight (RO) Staff Assessment of Paducah Gaseous Diffusion Plant Protective Force.Results Indicate Lack of Overall Program That Establishes & Directs Implementation of RO Agreement Requirements ML20207A2871999-05-13013 May 1999 Forwards Proprietary Rev 2 to POEF-151-96-1042, X-705 Security Plan, with Comments as Noted.Proprietary Info Withheld ML20207A0321999-05-12012 May 1999 Approves Usec Request to Modify DOE-approved Proposed Portsmouth Gaseous Diffusion Plant Compliance Plan Issue 23R, Changes & Configuration Mgt (Reopened) ML20207A0381999-05-10010 May 1999 Forwards DOE-approved Portsmouth Gaseous Diffusion Plant Compliance Plan Issue 23R, Plant Changes & Configuration Mgt, Superseding Version Transmitted in DOE ML20205M5561999-04-0606 April 1999 Discusses DOE Review of Reopening of Compliance Plan Issues 8,9 & 23 Re NCS Program at Portsmouth Gaseous Diffusion Plant ML20207E8761999-02-25025 February 1999 Submits Request for Review & Approval of Rev to Plan for Achieving Compliance with NRC Regulations at Portsmouth Gaseous Diffusion Plant.Rev Involves Changes to Issue 8, Issue 9 & Portions of Issue 23 ML20205M2691999-02-23023 February 1999 Forwards List of Documents Re Gaseous Diffusion Plant Safety Sar,That Will Be Archived.Doe Will Not Be Archiving Engineering Svc Orders (Esos) That Supported Preparation of Sars.Original Esos Will Be Sent to Gaseous Diffusion Plants ML20198K7261998-12-11011 December 1998 Forwards Proposed Rev to Compliance Plan Issue 36 Re Seismic Capability of Bldgs C-331 & C-335.Encl 1 Provides Detailed Description & Justification for Proposed Change ML20155A6451998-10-19019 October 1998 Forwards Rev to Compliance Plan Issues 46 & 50 for Review & Approval.Revs Ensure That Criticality Accident Alarm Sys Horns Are Audible Throughout Affected Areas of Process Bldgs & in Unalarmed Bldgs within Listed Evacuation Area ML20154Q2601998-10-13013 October 1998 Informs of DOE Approval of Usec Requested Change in Schedule for Completion of HEU Cylinder Cleaning Activities & Subsequent Transition of Regulatory Oversight Responsibility from DOE to NRC for HEU Cylinder Cleaning Areas of X-705 ML20154M6801998-10-0909 October 1998 Forwards Response to DOE CAL Re Fabrication,Testing & Application of HEU Cylinder Adaptors.Outline of Resolution of All Issues Provided in Encl.Licensee Intends to Continue HEU Cylinder Cleaning Operation in X-705 ML20154A6701998-09-25025 September 1998 Submits Proprietary Request to DOE for Review & Approval of Rev to Plan for Achieving Compliance with NRC Regulations at Portsmouth Gaseous Diffusion Plant.Rev Involves Change to Compliance Plan Issue A.4,plan of Action.Encl Withheld ML20247F5461998-05-0707 May 1998 Requests DOE & NRC Authorization to Proceed W/Temporary Conversion of X-705 South Annex to DOE Regulation & to Initiate HEU Cylinder Valve Replacement Activity in X-705 South Annex on 980511 ML20247D7131998-05-0707 May 1998 Forwards Rev to Compliance Plan Issue 11,for Review & Approval.Encl 1 to Ltr Provides Detailed Description & Justification for Proposed Changes ML20217J3561998-03-26026 March 1998 Forwards Proposed Rev to Shared Site Issues Agreement (Ssia) Modifying Section 13, Access to Deleased Outside Areas, as Listed ML20217M5091998-03-25025 March 1998 Forwards Response to Ltr Re Concerns United Plant Guard Workers of America Expressed ML20217P8021998-02-27027 February 1998 Forwards Summary of Additions,Mods & Deletions of Policies, Procedures,Practices & Other Implementation Measures Described in Safety Basis & Framework for DOE Oversight of Gaseous Diffusion Plants for Period 960701-970630 ML20198Q7701998-01-0808 January 1998 Withdraws Request to Review Compliance Plan Changes as Changes Not Necessary ML20198Q8211997-12-23023 December 1997 Forwards Proprietary Security Plan for Plant Re X-705 HEU Cylinder Valve Replacement Activities.Document Received from Toelle for Signature & Return.Encl Withheld ML20217A7191997-09-15015 September 1997 Forwards Requested Radiological Survey Data for Enriched Uranium (Eu) DOE Matl Storage Areas (Dmsas) for Portsmouth Gaseous Diffusion Plant.Revised Inventory Listing for Affected Eu Dmsas,Also Encl ML20216J4621997-08-28028 August 1997 Forwards Operational Readiness Assessment of X-326 High Assay Storage Area Vault.New Commitments,Submitted ML20217N4851997-08-15015 August 1997 Forwards Proposed Rev to Usec & DOE Agreement for DOE Matl Storage at Gaseous Diffusion Plants,Revising Section 5, Transfer of Matl/Equipment, for Approval ML20217K5171997-08-0808 August 1997 Provides Notification of Completion for Following Regulatory Commitment for Completion of HEU Orr for Phase II of X-705 Cylinder Cleaning Facility West Annex ML20217K0801997-07-17017 July 1997 Provides Revised Computer Based Integrated Security Sys Security Plan & Safeguards Alarm Sys Security Plan for Purpose of Reaccreditation.W/O Encls ML20148L7121997-06-13013 June 1997 Notifies DOE of Several Issues Re Hgsystem/Uf Computer Code Suite Used for Consequence Analysis as Part of DOE SAR Upgrade Program & Plans for Resolution ML20138A1291997-04-21021 April 1997 Forwards Documents Which Contain Results of X-705 Confirmatory Measurement Which Confirm That U Enriched Above 9.99 Weight Percent U-235 Remaining in Usec Leased & Certified Areas of Facility Is within Limits Allowed by SAR ML20137D4141997-03-11011 March 1997 Submits Commitments Made as Result of Response to Insp Repts 70-7001/96-08,70-7002/96-07 & 70-7001/97-01 ML20135A0991997-02-24024 February 1997 Requests DOE Review of Proposed Changes to FSAR to Resolve Cell Treatment Coolant Sys Pressure Issue ML20132H0101996-12-18018 December 1996 Forwards Results of Compliance Plan Action Item Closure Effort for Months of Oct & Nov 1996 ML20129J0741996-10-30030 October 1996 Informs That DOE Canceling Plans for Special Insp of Us Enrichment Corp Mgt Involvement,Based on Updated Info Provided in .Expects Licensee to Continue to Emphasize Importance of Keeping Submitted Issues ML20129J0361996-10-16016 October 1996 Discusses Usec Action Plan Per DOE Mgt Conference 96-001 Re Effectiveness of Usec Mgt Controls in Improving Operations at Gaseous Diffusion Plants 1999-08-30 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20217N485&oldid=3609043"