ML20211Q776
| ML20211Q776 | |
| Person / Time | |
|---|---|
| Site: | Portsmouth Gaseous Diffusion Plant |
| Issue date: | 09/10/1999 |
| From: | Ting P NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Adkins J UNITED STATES ENRICHMENT CORP. (USEC) |
| Shared Package | |
| ML20211Q781 | List: |
| References | |
| 70-7002-99-205, NUDOCS 9909150151 | |
| Download: ML20211Q776 (3) | |
Text
_
N LC E ih Ond1Y-Mr. Jim:s M. Adkins Vice President, Producti:n September 10, 1999 United States Enrichment Corporation Two Democracy Center 6903 Rockledge Drive Bethesda, MD 20817
SUBJECT:
INSPECTION REPORT NO. 70-7002/99-205
Dear Mr. Adkins:
The Nuclear Regulatory Commission conducted an announced inspection of the Portsmouth Gaseous Diffusion Plant's Year 2000 Readiness Program on August 16 - 20,1999. The inspection consisted of selective examinations of computer systems, representative records, and interviews with personnel, i
At the conclusion of the inspection, the findings were discussed with members of your staff.
I Subsequent to the inspection, a telephone conference with members of your staff and representatives of the NRC Fuel Cycle Safety and Safeguards Division was conducted to exchange additional information about the inspection.
Should you have any questions concerning this report, please contact me at (301) 415-7156.
Sincerely, Original /s/
Philip Ting, Chief Operations Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket No. 70-7002
Enclosure:
As stated 4
cc w/ enclosure:
I H. Pulley, Paducah General Manager k
I L. Jackson, Paducah Regulatory Affairs Vwanager
> - kh S. A. Toelle, Manager, Nuclear Regulatory Assurance and Policy, USEC R. M DeVault, Regulatory Oversight Manager, DOE
/
i W. J. Bruttaniti, Vice President and Chief Information Officer, USEC
'O R. L. Suppes, Chief, Bureau of Radiation Protection, Ohio Department of Health M
DISTRIBUTION:
Docket file 70-7002 Case File MMessier, LDFB(w/o enet)
WSmith, FCOB PDR/LPDR (w/o encl)
.RPerson, SPB YFaraz, SPB LHarris,FCOB TPham. LIB FCOB r/f FCSS r#
CCollins, FCOB NMSS r/f DHartland, PORTS CEmeigh, LIB BWishard, FCOB PHiland, Rlli HFelsher, LIB MRodgers, PMDA (w/o enct)
DOCUMENT NAME: POR99205.WPD
' *Please see psevious concurrence OFC FCOB E
FCOB E
FCOB FCOS 6
NAME
- THarich:rr
- DWhaley W
PTingO DATE 9 / 8 /99 9 / 8 /99 f / f /99 Til0/99 C = COPY.
E = COVER & ENCLOSURE E r No COPY OFFICIAL RECORD COPY 9909150151 990910 PDR ADOCK 07007002 C
PDR I
r Mr. J:mes M. Adkins Vice President, Production United States Enrichment Corporation Two Democracy Center 6903 Rockledge Drive Bethesda, MD 20817
SUBJECT:
INSPECTION REPORT NO. 70-7002/99-205
Dear Mr. Adkins:
The Nuclear Regulatory Commission conducted an announced inspection of the Portsmouth Gaseous Diffusion Plant's Year 2000 Readiness Program on August 16 - 20,1999. The inspection consisted of selective examinations of computer systems, representative records, and interviews with personnel.
At the conclusion of the inspection, the findings were discussed with members of your staff.
Subsequent to the inspection, a telephone conference with members of your staff and representatives of the NRC Fuel Cycle and Safeguards Division was conducted to exchange additional information about the inspection.
Should you have any questions conceming this report, please contact me at (301) 415-7156.
l i
Sincerely, Philip Ting, Chief l
Operations Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket No. 70-7002
Enclosure:
As stated cc w/ enclosure:
H. Pulley, Paducah General Manager L. Jackson, Paducah Regulatory Affairs Manager S. A. Toelle, Manager, Nuclear Regulatory Assurance and Policy, USEC R. M. DeVault, Regulatory Oversight Manager, DOE W. J. Bruttaniti, Vice President and Chief Information Officer, USEC i
l R. L. Suppes, Chief, Bureau of Radiation Protection, Ohio Department of Health f
DISTRIBUTION:
DorAet File 70-7002 Case File MMessier, LDFB(w/o encl) WSmith. FCOB PDR/LPDR (w/o enct)
RPerson, SPB YFarz SPB LHarris,FCoB TPham, LIB FCoE r/f FCdS r/f CCollins, FCoB NMSS t/f DHartland, PORTS CErneigh, LIB BWishard. FCOB
' PHiland, Rlll HFelsher, LIB MRodgers, PMDA (w/o enc!)
I DOCUMENT NAME: POR99205.WPD l
{
i OFC FCOB h
FCOB b
FCOB FCOB NAME THarich:rr DWhaley WSchwink PTing DATE h/ $ /99 9 / h /99
/
/99
/
/99 C = COPY E = COVER & enclosure N = No COPY OFFICIAL RECORD COPY t.
3 paatcoq UNITED STATES p
4 g
,g NUCLEAR REGULATORY COMMISSION WASHINGTON, D.c. 205554 001 September 10, 1999 Mr. James M. Adkins Vice President, Production United States Enrichment Corporation
]
Two Democracy Center 1
6903 Rockledge Drive
]
Bethesda, MD 20817 l
SUBJECT:
INSPECTION REPORT NO. 70-7002/99-205
]
Dear Mr. Adkins:
I The Nuclear Regulatory Commission conducted an announced inspection of the Portsmouth Gaseous Diffusion Plant's Year 2000 Readiness Program on August 16 - 20,1999. The inspection consisted of selective examinations of computer systems, representative records, and interviews with personnel.
- At the conclusion of the inspection, the findings were discussed with members of your staff.
Subsequent to the inspection, a telephone conference with members of your staff and representatives of the NRC Fuel Cycle Safety and Safeguards Division was conducted to exchange additional information about the inspection.
Should you have any questions concerning this report, please contact me at (301) 415-7156.
Sincerel 7
[Philip Ting, Chief)
Operations Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket No. 70-7002
Enclosure:
As stated cc w/ enclosure:
H. Pulley, Paducah General Manager L. Jackson, Paducah Regulatory Affairs Manager S. A. Toelle, Manager, Nuclear Regulatory Assurance and Policy, USEC R. M. DeVault, Regulatory Oversight Manager, DOE W. J. Bruttaniti, Vice President and Chie',Information Officer, USEC R. L. Suppes, Chief, Bureau of Radiation Protection, Ohio Department of Health