Forwards Operational Readiness Assessment of X-326 High Assay Storage Area Vault.New Commitments,Submitted
ML20216J462
Person / Time
Site: Portsmouth Gaseous Diffusion Plant
Issue date: 08/28/1997
From: Toelle S
UNITED STATES ENRICHMENT CORP. (USEC)
To: Devault R
ENERGY, DEPT. OF
References
NUDOCS 9709170311
Download: ML20216J462 (10)


Text

-

Unit:d St:tes Enrichm:nt Corporaten 2 Democracy Center 6903 Rockledge Orrve Bethesda, MD 20817 Tel. (301) $64 3200 Fax:(301)564 3?01 August 28.1997 Mr. Randall bl. DeVault Regulatory Oversight hianager Office of the Assistant Manager for Enrichmot Facilities U.S. Department of Energy Oak Ridge Operations P.O. Box 2001 Oak Ridge, TN 378318651 United States Enrichment Corporation (USEC) - Portsmouth Gaseous Diffusion Plant (PORTS)- Docket No. 70 7002 Completion of X 326 II ASA Vault ORA

Dear hir. DeVault:

USEC has completed the Operational Readiness Assessment (OR A) of the X 326 liigh Assay Storage Area (llASA) Vault. A copy of the ORA is included in the endosure.

All open items which are necessary to operate the X 326 IIASA Vault have been completed with the exception of those related to training and the assignment of the cas :ade operation procedure efTective date. The training, consisting of required reading of the newly re tised procedure, has not been completed for all applicable operations personnel. As noted in the attached memorandum from hiike llopper to Roger hicDemiott dated July 22,1997, once DOE approval to use the X-326 liASA Vault is obtained, an effective date will be assigned for all pertinent procedures and training will be completed. In the interim, only those operations personnel who have successfully completed training will be allowed to operate the X 326 IIASA Vault. During this time, minimum staffing levels will be maintained in accordance with the X-326 llEU Refeed TSRs.

New commitments made in this letter are for USEC to assign a cascade operation procedure efTective date and assure that all pertinent operations personnel receive the required trainirg upon receipt of DOE approval to operate the X 326 IIASA Vault. If you have any questions, or require additional infonnation on this subject, please call hiark Lombard at (301) 564 3248.

l'iF 04,i t

Sm.cerely, f)

S. A.

/ /

@kll,l3(U($ll$

Steven A.Toelle j ".' O 3 3 Nuclear degulatory Assurance and Policy hianager 9709170311 970820 PDR ADOCK 07007002 N

C PDR OMices 6n Uvermore, Cahfornta Paducah, Kentucky Portsmouth, Ohio Washington, DC

hir. Randall hl. DeVault August 28,1997 Page Two cc:

DOE Site Safety Representatives, PORTS NRC Project Manager, PORTS NRC Project Manager, PODP NRC Resident inspector, PORTS NRC Resident inspector, PGDP NRC Region 111 l

s a

r__de..J.o.h_hh-4

-JL.~4ed-A.A-n*M--m.-6.hW4 J4 E,+ L J __#6 - e.W J aA.M.h M h A maM _Mua l

.a4 A.m44 Mw J -huMm-.s.4.4mM& h M _ ah Wh.

3 6e-,6---4M*am---

AAw-M mda h 4

4 g.

s 8,

e G

s 4

4 ENCLOSURE X-326 ffASA VAULT ORA I

i l.

l'jx l-

---~=~-

4 j

L O C KNE E D M A R TIN Date:

August 8,1997 POEF-945 97 097 To:

RogerMcDennott From:

Mike Hopper,X 100,MS 1214A, PORTS (2

Subject:

Opemtional Readiness Assessment (ORA) of the X-326'HASA Vault for Cylinder Stomge prior to, and immediately afler Refeed Operations To ensure adequate n:adiness of the X 326 HASA Vault, tus Operational Readiness Assessment (ORA) was perfonned dudng the pedod of July 10 - 18,1997.

- ne asse:isment was perfonned by Mike Hopper, Mike Kelly, John Schwab, Steve Balko, Jen:my Smith.

Salah Darwish, Debbie Kielmar and Len Sendek using the Readiness Assessment Procedure, UE2-QA-QS1033. Dudng the ORA some deficiencies were identified and included in the rrport attached.

Cascade Opemtions took actions to correct those deficiencies identified. He conective actions were assessed as adequate.

Basedontheabove fxts, theteamconchries ' tallactionsinvoMng the useof theX 326VaultforStedng Cylinders has been completed.

Mitesd cc:

JeffCastle Roy Holiday Dana Mauk QS File RC i

t.ockheed Martin Utility Services, Inc.

P. O. Box 628 Piketon OH 45661 Telephone 614 897'2331 Facsimile 614*897 2985

,1 LOCKHEED M A R T I Nl Date:

July 22,1997 POEF 945-97 081 To:

Roger McDermott From:

hiike Hopper, X 100, MS 1214A, PORTC (2606)T

Subject:

Opemtional Readiness Assessment (ORA) of the X-326 IMSA Vault for Cylinder Stemge prior to and immediately after Refeed Opemtions The ORA tam comprised of Mike Kelly, John Schwab, Steve Balko, Jeremy Smith. Salah Damish. Debbie Kielmar Len Sendek and myself has completed the Operation Readiness Assessment. 'Ihe assessment was performed during the period ofJuly 10 18,1997.

The attached signatures for specific elements were included to allow verification that all items were completed.

The following deficient conditions were identified: 1) Old NCS signs inside and outside of vault need removed. NCSA-032(024301 does not require signs. 2) General clean up is needed. 3) Relamping is needed. 4) Emergency lighting needs repaired and tested.

An c!Tective date will be established for the changes to the required Cascade Opemtion procedure to include the X 326 HASA Vauh. Also the required tmirung for those changes will be conducted pending the approval from the Depanment of Energy to proceed.

ne team has concluded that afler deficient conditions are conected there will be acceptable evidence of readiness to proceed with the use ofthe X-326 HASA Vault for storing cylinders prior to and immediately ader refeed.

He Repon of Conective Actions should be fonvarded to the team leader by July 29,1997 for verificmion.

This will allow for the assessment to be resiewed and submitted to DOE for approval.

MH:csd cc:

JelTCastle Roy Holiday Dana Mauk QS-File-RC l.o-lheed Manin Utility Senices. tnc.

P. O. Box 628 PActon. Oli 45661 Telephone 614*S97*2331 Facsimite 614*897* 933

i e

READINESS ASSESSMENT PLAN AND CRITERIA Training Cascade Operators, and 95% complete as evidenced FLMs, PSS, UMil, Security by signed training rosters and personnel Required Reading Procedures Operations, UMil, Security 100% Complete as evidenced by signed procedure cover sheet.

NCSA Walkdowns Plant and Cascade Specific 100% Complete and that Apply Documented on A 3549 Conduct of 0perations (logs, Review all TSR and NCSA 100% Complete as evidenced records, operator aids, Shift requirement incorporation by revised items that impact Routines)

TSR or NCSAs Facility Walkdown Walkdown of facility to 100% complete evidenced by ensure specifications and signed verification and DWGs are up to-date validation of the walkdown and review of specifications and DWGs.

Security (Security Plans, Wakdown of the llASA 100% complete evidenced by Procedures and Systems)

Vault Alarm System, Review the signed verification and of the Security Plan and validation of the walkdown Security procedures and review of the Security Plan, Secunty procedures and Security Alarm System.

Fire Protection (coverage and Review of the Fire Protection 100% complete evidenced by current testing)

System and current testing signed verification and validation of adequate fire protection system and current tests performed for operability.

CAAS cover &,,e Review of the Report of 100% complete evidenced by Determination of the the signed validation and Response Function for the verification of adequate Portsmouth Gaseous coverage for the 11ASA Vault Difrusion Plant Criticality and current testing is Accident Alarm System complete Neutron Detectors and current testing of the CAAS

A o.-

t READINESS ASSESSMENT PLAN AND CRITERIA Radiation Protection Program Review of procedures and 100% complete evidenced by program requirements for the signed validation and liASA Vault area and verification of adequate walkdown of the area for procedures and program program implementation implementation.

NMCA Review FMNC Plan and 100% complete evidenced procedures.

approved PCR and RAC for the FMNC Plan change.

1

ERocencRrs 1.

Reviewed the following groups of procedures to verify the NCSA, OSR, TSR, SAR required items are incorporated and paragraph markin s are repriate.

l Procedure reflects conect function. 4T". ':: L: /@

ce M

hB d_L/'/d/f/

Jf l

Operations Sc%sb UMH T b4 M"

INpper Security

[!

V Kalfy TRAINING 1.

Persor.r.cl training for the X.326 HASA Vault for Operations and Uranium Material Handling. 95% c.

gla 9

Operations Kielm

/

UMH Kielmar SECURITY 1,

Review of the X 326 Facility Security Plan Security Plan M

D~~

Kelly

<j

6 OPERATIONS 1.

Walk down verification of the operability of the vault for storage purposes.

Operability of the Vault f/f.,i.e A.-

Schwab

/

Facility adequacy A

Y*

~.b (structure, equipment, Danvish

~7 l 11 I9 7 modifications.)

RADIATION PROTECTION PROGILQ1 1

Review of the Radiation Protective Program as applied to the X426 HASA vault.

Surveys, boundries, RWPs

[/,4 4

established.

Balko FIRE PROTECTION 1.

Review of the Fire Protection System for the X 326 HASA vault Adequate coverage YJ[&

dopper/.5Mee6 CAAS 1.

Review of the Determination of the Response Function for the Portsmouth Gaseous Diffusion Plant Criticality Accident Alarm System Neutron Detectors.

Adequate coverage YudNJ lidpper

SC5A 1.

Review NCSA 0326_024301 and Facility /NCSA Field Verification hecklist 7/q[77 NCSA Adequate and Vault complies ALA

[

Sith' NMCA 1.

Review FMNC Plan.

Ownership of vault operation

/ '~ f>/- / y for updating Dymcus Inventory

// Sendek l