TXX-9139, Suppls License Amend Request LAR-91-007,submitted Via ,Changing Tech Specs to Allow Relocation of Cycle Specific Parameters to Core Operating Limits Rept,Per NRC Request

From kanterella
Revision as of 17:45, 25 July 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Suppls License Amend Request LAR-91-007,submitted Via ,Changing Tech Specs to Allow Relocation of Cycle Specific Parameters to Core Operating Limits Rept,Per NRC Request
ML20085K208
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 10/21/1991
From: William Cahill, Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20085K211 List:
References
TXX-91394, NUDOCS 9110300208
Download: ML20085K208 (1)


Text

. - . - . . _ - - - - - - . _ - _. - - -_-....- .. . . . - - .. . _ . . .

.b 6: n tog # TXX-91394

" ~

File # 10010 ,

- 916 (6.0)

E E , 4 10CFR50.90 7UELECTRIC October 21, 1991 William J. Oshill. Jr.

Grese tWe bes, dent U. 5. Nuclear Regulatory Cn..imission 1 Attn Document Control Desk Washington, D.C. 20555

$UBJECT: COMANCHE PEAK STEAN ELECTRIC STATION (CPSES) UNIT 1 DOCKET NO. 50 445 OPERATING LICENSE NPF-87 TECHNICAL SPECiflCATION SUBHITTAL ON CORE OPERATlHG LlHITS REPORT REF: 1) TU Electric letter logged TXX 91179 from William J. Cahill, Jr.,

to the NRC, dated May 24, 1991.

Gentlemen:

Via the referenced letter and pursuant to 10CFR50.90 TU Electric requested an amendment to its Operating License HPF 87 by incorporating proposed changes to the Technical Specification for CPSES Unit 1. When implemented, this License Amendment Request (LAR)91-007 would allow, among other things, the relocation of cycle specific' parameters to a Core Operating Limits Report. The specifics concerning this report are contained in the requested changes for Administrative Control section 6.9.1.6.

During the review of LAR-91 007 t:1e NRC staff quest'oned the meaning of the word "CAOC" in Insert E, of fnclosure 3 to TXX-91179, page 29 of 32 (Reference 1). The word "CAOC" stands for Constant Axial Offset Control as identified in Insert D, of Enclosure 3 to TXX 91179, page 31 of 32 (Reference 1). Attachen is a marked-up of Insert E to reflect the discussion above.

If you should have additional questions please contact Mr. D. R. Woodlan at 214/612-8225.

Sincerely,

@a: William J. Cahill Jr.

5$

co$

By: , ph (o r D. R. Woodlan OS Docket Licensing Hanager glj y HCP/gj y F> Attachment 3rr cc: Mr. R. D. Martin Region IV gI Q Resident inspectors, CPSES (2)

Hr. T. A. Bergman. NRR i

[bO(( 400 N. Ohve street LD.8L Dallas,Tenas 752o1

.w

. - -. .. . ,-. .- .-. - -, - -.