|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20217F3481999-10-15015 October 1999 Marked-up & Reprinted TS Pages,Changing TS Requirements for Insp of RCP Flywheels ML20212E7851999-09-16016 September 1999 Proposed Tech Specs Pages,Modifying Surveillance Requirements 3.8.4.8,3.8.4.9 & 3.8.4.8 Bases to Allow Testing of DC Channel Batteries with Units on Line ML20210N3151999-08-0404 August 1999 Proposed Tech Specs Changing TSs 3.3.2, ESFAS Instrumentation, 3.3.3, Post Accident Monitoring Instrumentation, 3.4.14, RCS Loops - Test & 5.3, Unit Staff Qualifications ML20196H7551999-06-24024 June 1999 Proposed Tech Specs 2.0, Safety Limits, TS 3.3.1, Reactor Trip Sys Instrumentation & TS 3.4.1, RCS Pressure,Temp & Flow Departure from Nucleate Boiling (DNB) Limits ML20206M9391999-05-0606 May 1999 Proposed Tech Specs,Revising List of Referenced Documents in TS 5.6.5b Re COLR Requirements ML20205C6901999-03-25025 March 1999 Proposed TS Facilitating Treatment of RTS Instrumentation, ESFAS Instrumentation,Lop DG Start Instrumentation,Cp & Exhaust Isolation Instrumentation & LTOP PORV TS Trip Setpoints as Nominal Values ML20204E5281999-03-15015 March 1999 Proposed Tech Specs Deleting TS for Cravs & Auxiliary Bldg Filtered Ventilation Exhaust Sys Actuation Instrumentation & Adding Note to TS for Cravs Re Chlorine Protection Function ML20204F6931999-03-11011 March 1999 Proposed Tech Specs 3.3.7 & 3.3.8 Re CR Area Ventilation Sys & Auxiliary Bldg Filtered Ventilation,Exhaust Sys Actuation Instrumentation ML20203A3331999-01-28028 January 1999 Proposed Tech Specs Modifying Flowrate Specified for SR 3.7.13.4 from Value Representative of One Filter Unit/Fan to Value Representative of Entire Fhves Train ML20197G8991998-12-0707 December 1998 Proposed ITS 3.8.3,modifying Inventory Requirements for DG Lube Oil Sys ML20195D6481998-11-11011 November 1998 Proposed Tech Specs,Modifying Details of SRs 3.6.11.6 & 3.6.11.7 to Be Consistent with Design of Containment Pressure Control Sys at Plant ML20155B2111998-10-22022 October 1998 Proposed Revs to Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009 & DPC-NE-2009P ML20151Y1821998-09-15015 September 1998 Proposed Improved TSs Providing Changes Necessary to Resolve Items Identified by Util During Review ML20151T9491998-09-0808 September 1998 Proposed Tech Specs & Bases Re Relocation from Current TS & Scheduling of New More Restrictive Surveillance Requirements ML20237B6241998-08-14014 August 1998 Proposed Tech Specs 4.6.5.1.b.2 & 4.6.5.1b.3 Relating to Ice Condenser Ice Bed Changing Portion of Surveillances Pertaining to Lower Inlet Plenum Support Structures & Turning Vanes from 9-month Frequency to 18-month Frequency ML20237B5751998-08-12012 August 1998 Proposed Tech Specs 4.6.5.1b.2 Re Ice Condenser Sys Components W/Respect to Accumulation of Frost or Ice ML20237A6571998-08-0606 August 1998 TS Page 3/4 8-9 Re Notice of Enforcement Discretion Request from Enforcing TS Surveillance Requirement 4.8.1.1.2i.2 ML20237A9341998-08-0606 August 1998 Proposed Tech Specs,Deleting SR 4.8.1.1.2i.2 for Pressure Test of DG Fuel Oil Sys ML20237A0361998-08-0505 August 1998 Suppl 8 to Improved TS (Its),Combining Units ITS Pages to Facilitate Ease of Use & Significantly Reduce Vol of Paper That Must Be Processed & Controlled ML20236U1531998-07-22022 July 1998 Proposed Revised Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009P & DPC-NE-2009 ML20249B3961998-06-15015 June 1998 Proposed Tech Specs Affecting Requirements for low-temp Overpressure Protection ML20248B5741998-05-22022 May 1998 Proposed Tech Specs Modifying SR 4.4.3.3 for Pressurizer Heaters to Be Consistent W/Plant Design & W/Ts Requirement as Delineated in Improved Tech Specs ML20217E9831998-04-20020 April 1998 Proposed Improved Tech Specs Sections 1.0,2.0,3.0 & 4.0 ML20217E9521998-04-20020 April 1998 Proposed Tech Specs Revising Requirements for Automatic Actuation Logic & Actuation Relays Associated W/Cravs Operation Function,Which Is Part of ESFAS ML20216B9721998-04-0808 April 1998 Proposed Tech Specs 3/4.6.5 Re Ice Condenser Reduction of Required Ice Weight ML20217C7121998-03-20020 March 1998 Proposed Improved TS Section 3.6 Re Containment Sys ML20216B7691998-03-0909 March 1998 Proposed Tech Specs Pages Responding to 980116 RAI Re Improved TS Sections 3.1 & 3.2.Suppl Changes to Improved TS Also Included ML20217Q3741998-03-0303 March 1998 Proposed Tech Specs Re Catawba Safety Review Group ML20197G4391997-12-17017 December 1997 Proposed Tech Specs Referencing Updated or Recently Approved Methodologies Used to Calculate cycle-specific Limits Contained in COLR ML20203H9241997-12-11011 December 1997 Proposed Tech Specs Re ESFAS Instrumentation ML20210U6401997-09-15015 September 1997 Proposed Tech Specs Revising Pressure/Temp Limits, Overpressure Protection & Reactor Vessel Matl ML20140A6201997-05-27027 May 1997 Proposed Tech Specs Deleting References to Steam Generator Tube Sleeving & Repair That Will Not Be Used for Westinghouse Model D5 Steam Generators in Use at Catawba Unit 2 ML20140A6681997-05-27027 May 1997 Proposed Tech Specs,Removing Surveillance Requirement 4.7.13.3a.2 Which Specifies 112,320 Gallon Min Volume of Borated Water Be Available to Supply Standby Makeup Pump ML20141C2281997-05-0808 May 1997 Proposed Tech Specs Allowing Natural Circulation Testing in Mode 3 Following Steam Generator Replacement for Catawba Unit 1 ML20136G2471997-03-0707 March 1997 Proposed Tech Specs Re SGTR Evaluation ML20133E6801997-01-0303 January 1997 Proposed Tech Specs to Eliminate SI Signal on Low Steam Line Pressure.Unnecessary SI Actuation Causes Unnecessary Challenges to Plant Safety Sys,Unnecessary Thermal Transient & Increases Actuation Cycles ML20132F0631996-12-12012 December 1996 Proposed Tech Specs,Section 3/4.3.3.1,for Units 1 & 2 Clarifying Info Re Operation of Radiation Monitors for Plant Operations ML20134H3281996-11-0404 November 1996 Proposed Tech Specs to Licenses NPF-35 & NPF-52,eliminating During Shutdown Restriction for 18 Month Standby Shutdown Sys DG Insp TS Surveillance 4.7.13.1.c ML20113G4431996-09-21021 September 1996 Proposed Tech Specs 8.3 Re Onsite Power Systems ML20117K1011996-08-29029 August 1996 Proposed Tech Specs,Replacing 960516 Response to Concerns Re Proposed Changes for Diesel Starting Air Sys Surveillance Testing ML20116K4601996-08-0808 August 1996 Proposed Tech Specs 6.9.1.9 Re Listings of Core Operating Limit Methodologies ML20113C7201996-06-21021 June 1996 Proposed Tech Specs 3.9.6,revising Term Lifting Loads to Lifting Force Used in Manipulator Crane TS 3.9.6b.2 & Redefining Auxiliary Hoist Min Capacities ML20112G9961996-06-0606 June 1996 Proposed Tech Specs,Reflecting Separate Volumes ML20112F6311996-06-0505 June 1996 Proposed Tech Specs 3/4.6 Re Containment Systems & 3/4.6.1 Re Primary Containment Integrity ML20112A7571996-05-16016 May 1996 Proposed Tech Specs 3/4.8 Re Surveillance Requirements ML20101M4741996-04-0303 April 1996 Proposed TS 3/4.6.4.3 & Bases Re Hydrogen Mitigation Sys ML20101H6101996-03-15015 March 1996 Proposed Tech Specs Re Replacement of SGs ML20100P0521996-03-0404 March 1996 Proposed Tech Specs Re Rev to 10CFR50,App J Which Provided for Reduced Test Frequency for Qualified Containment ML20096E8611996-01-19019 January 1996 Proposed Tech Specs,Providing Approved Revs to TS 6.9.1.9 to Incorporate Anticipated Revs to TRs DPC-NE-3000P-A & DPC-3002-A ML20096E5951996-01-12012 January 1996 Proposed Tech Specs Re Containment Leak Rate Testing Requirements of 10CFR50 App J,Option B 1999-09-16
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217F3481999-10-15015 October 1999 Marked-up & Reprinted TS Pages,Changing TS Requirements for Insp of RCP Flywheels ML20212E7851999-09-16016 September 1999 Proposed Tech Specs Pages,Modifying Surveillance Requirements 3.8.4.8,3.8.4.9 & 3.8.4.8 Bases to Allow Testing of DC Channel Batteries with Units on Line ML20211A9881999-08-18018 August 1999 Rev 5 to DPC Nuclear Security Training & Qualification Plan ML20210N3151999-08-0404 August 1999 Proposed Tech Specs Changing TSs 3.3.2, ESFAS Instrumentation, 3.3.3, Post Accident Monitoring Instrumentation, 3.4.14, RCS Loops - Test & 5.3, Unit Staff Qualifications ML20210N9641999-07-26026 July 1999 Revised Catawba Nuclear Station Selected Licensee Commitments Manual ML20211C3731999-07-26026 July 1999 Revs to Catawba Nuclear Station Selected Licensee Commitments Manual & List of Effective Pages ML20196H7551999-06-24024 June 1999 Proposed Tech Specs 2.0, Safety Limits, TS 3.3.1, Reactor Trip Sys Instrumentation & TS 3.4.1, RCS Pressure,Temp & Flow Departure from Nucleate Boiling (DNB) Limits ML20210A5911999-06-10010 June 1999 Revised Catawba Nuclear Station Selected Licensee Commitments Manual ML20216D4061999-06-10010 June 1999 Revised Catawba Nuclear Station Selected Licensee Commitment Manual, List of Effective Pages ML20211C3751999-05-19019 May 1999 5 to Catawba Nuclear Station Units 1 & 2 Pump & Valve Inservice Testing Program. Page 1 of 15 in Section 4.1 of Incoming Submittal Not Included ML20195B4181999-05-18018 May 1999 Revised Pages to Catawba Nuclear Station Selected Licensee Commitments Manual ML20206M9391999-05-0606 May 1999 Proposed Tech Specs,Revising List of Referenced Documents in TS 5.6.5b Re COLR Requirements ML20206T0571999-05-0505 May 1999 Revised Catawba Nuclear Station Selected Licensee Commitments Manual. with List of Effective Pages ML20206J4531999-04-22022 April 1999 Revs to Catawba Nuclear Station Selected Licensee Commitments Manual ML20206Q8741999-04-22022 April 1999 Revs to CNS Selected Licensee Commitments Manual,Including Page 5 of List of Effective Pages & Pages 1-11 to Chapter 16.9-13.With ML20206B1271999-04-15015 April 1999 CNS Selected Licensee Commitments Manual, List of Effective Pages ML20206C0391999-04-15015 April 1999 Revs to Catawba Nuclear Station Selected Licensee Commitments Manual ML20205C6901999-03-25025 March 1999 Proposed TS Facilitating Treatment of RTS Instrumentation, ESFAS Instrumentation,Lop DG Start Instrumentation,Cp & Exhaust Isolation Instrumentation & LTOP PORV TS Trip Setpoints as Nominal Values ML20204G2541999-03-16016 March 1999 Revised Pages to Catawba Nuclear Station Licensee Commitments Manual ML20204E5281999-03-15015 March 1999 Proposed Tech Specs Deleting TS for Cravs & Auxiliary Bldg Filtered Ventilation Exhaust Sys Actuation Instrumentation & Adding Note to TS for Cravs Re Chlorine Protection Function ML20204F6931999-03-11011 March 1999 Proposed Tech Specs 3.3.7 & 3.3.8 Re CR Area Ventilation Sys & Auxiliary Bldg Filtered Ventilation,Exhaust Sys Actuation Instrumentation ML20205B1341999-03-11011 March 1999 Revs to Catawba Nuclear Station Selected Licensee Commitments Manual ML20204E7271999-03-0808 March 1999 Chapter 16.5-2,page 1-3 to CNS Selected Licensee Commitments Manual. with List of Effective Pages ML20203A3331999-01-28028 January 1999 Proposed Tech Specs Modifying Flowrate Specified for SR 3.7.13.4 from Value Representative of One Filter Unit/Fan to Value Representative of Entire Fhves Train ML20199H4061999-01-16016 January 1999 Revised CNS Selected Licensee Commitments Manual ML20197G8991998-12-0707 December 1998 Proposed ITS 3.8.3,modifying Inventory Requirements for DG Lube Oil Sys ML20195D6481998-11-11011 November 1998 Proposed Tech Specs,Modifying Details of SRs 3.6.11.6 & 3.6.11.7 to Be Consistent with Design of Containment Pressure Control Sys at Plant ML20155B2111998-10-22022 October 1998 Proposed Revs to Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009 & DPC-NE-2009P ML20154L7191998-10-0505 October 1998 Rev 8 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20151Y1821998-09-15015 September 1998 Proposed Improved TSs Providing Changes Necessary to Resolve Items Identified by Util During Review ML20151T9491998-09-0808 September 1998 Proposed Tech Specs & Bases Re Relocation from Current TS & Scheduling of New More Restrictive Surveillance Requirements ML20237B6241998-08-14014 August 1998 Proposed Tech Specs 4.6.5.1.b.2 & 4.6.5.1b.3 Relating to Ice Condenser Ice Bed Changing Portion of Surveillances Pertaining to Lower Inlet Plenum Support Structures & Turning Vanes from 9-month Frequency to 18-month Frequency ML20237B5751998-08-12012 August 1998 Proposed Tech Specs 4.6.5.1b.2 Re Ice Condenser Sys Components W/Respect to Accumulation of Frost or Ice ML20237A6571998-08-0606 August 1998 TS Page 3/4 8-9 Re Notice of Enforcement Discretion Request from Enforcing TS Surveillance Requirement 4.8.1.1.2i.2 ML20237A9341998-08-0606 August 1998 Proposed Tech Specs,Deleting SR 4.8.1.1.2i.2 for Pressure Test of DG Fuel Oil Sys ML20237A0361998-08-0505 August 1998 Suppl 8 to Improved TS (Its),Combining Units ITS Pages to Facilitate Ease of Use & Significantly Reduce Vol of Paper That Must Be Processed & Controlled ML20236U1531998-07-22022 July 1998 Proposed Revised Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009P & DPC-NE-2009 ML20236P8671998-07-0606 July 1998 Updated Pages to Catawba Nuclear Station Selected License Commitments Manual ML20249B3961998-06-15015 June 1998 Proposed Tech Specs Affecting Requirements for low-temp Overpressure Protection ML20249B6221998-06-11011 June 1998 Revised Table of Contents for Chapter 16 of Selected License Commitments Manual ML20248B5741998-05-22022 May 1998 Proposed Tech Specs Modifying SR 4.4.3.3 for Pressurizer Heaters to Be Consistent W/Plant Design & W/Ts Requirement as Delineated in Improved Tech Specs ML20247Q9871998-05-11011 May 1998 Revised Chapter 16 to Selected License Commitment Manual ML20217E9521998-04-20020 April 1998 Proposed Tech Specs Revising Requirements for Automatic Actuation Logic & Actuation Relays Associated W/Cravs Operation Function,Which Is Part of ESFAS ML20217E9831998-04-20020 April 1998 Proposed Improved Tech Specs Sections 1.0,2.0,3.0 & 4.0 ML20217F2841998-04-20020 April 1998 Rev 7 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20216B9721998-04-0808 April 1998 Proposed Tech Specs 3/4.6.5 Re Ice Condenser Reduction of Required Ice Weight ML20217C7121998-03-20020 March 1998 Proposed Improved TS Section 3.6 Re Containment Sys ML20216B7691998-03-0909 March 1998 Proposed Tech Specs Pages Responding to 980116 RAI Re Improved TS Sections 3.1 & 3.2.Suppl Changes to Improved TS Also Included ML20217Q3741998-03-0303 March 1998 Proposed Tech Specs Re Catawba Safety Review Group ML20197G4391997-12-17017 December 1997 Proposed Tech Specs Referencing Updated or Recently Approved Methodologies Used to Calculate cycle-specific Limits Contained in COLR 1999-09-16
[Table view] |
Text
- - _ _ _ _ _ _ _ _ _
PLANT SYSTEMS l C AUXILIARY FEE 0 WATER SYSTEM, t
LIMITING CONDITION FOR OPERATION I
3.7.1.2 At least three independent steam generator auxiliary feedwater pumps and associated flow paths shall be OPERABLE with:
- a. Two motor-driven auxiliary feedwater pumps, each capable of being powered from separate emergency busses, and
- b. One steam tu'rbine-driven auxiliary feedwater pump capable of being powered from an OPERABLE steam supply system.
APPLICABILITY: MODES 1, 2, and 3.
ACTION:
- a. With one auxiliary feedwater pump inoperable, restore the required auxiliary .feedwater pumps to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STAN08Y within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the,following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. '
- b. With two auxiliary feedwater pumps inoperable, be in at least HOT
's STANOBY witin 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
- c. With three auxiliary .feedwater pumps inoperable, immediately initiata corrective ection to restore at least one auxiliary feedwater pump to OPERABLE status as soon as possible.
SURVEILLANCE REQUIREMENTS 4.7.1.2.1 Each auxiliary feedwater pump shall be demonstrated OPERABLE:
- a. At least once per 31 days on a STAGGERED TEST BASIS by:
- 1) Verifying that each motor-driven develops a total dynamic head of greater th or equal t than or equal t pm; yWo t at a flow of greater 3550
- 2) Verifying that the steam turbine-dr en de ops a total dynamic head of greater than or eq al to ett at a flow of greater than or equal t g m when the secondary steam supply pressure is greater than 600 psig and the auxiliary feedwater pump turbine is operating at }600 rpm. The provisions of Specification 4.0.4 are not applicable for entry into MODE 3; CATAWBA - UNIT 1 3/4 7-4 8408060104 840731 PDR ADOCK 05000413 P PDR r . . .. .-
PLANT SYSTEMS BASES '
3/4.7.1.2 AUXILIARY FEEuWATER SYSTEM The OPERABILITY of the Auxiliary Feedwater System ensures that the Reactor Coolant System can be cooled down to less than 350*F from normal operating conditions in the event of a total loss-of-offsite power.
Each electric motor-driven auxiliary feedwater pump 4: ::;e?: :f :: ':: -
!n; : t:t;? feed ;;:- ' b :f 50^ ; :t : pr :Sure af U10 p;f; to th;
~ eat-tre: Of th; st;;. ;::: ste-Q{J1e steam-driven auxiliary feedwater pump is capable of delivering a total feedwater flow +# InM ; et e precrur: f 1210 pef; te the ...i.....ee :f the +r- ;:rerrte e c:;;;fty f: sufff-cient to ensure that adequate feedwater flow is available to remove decay heat and reduce the Reactor Coolant System temperature to less than 350*F when the Resi. dual Heat Removal System may be placed into operation.
3/4.7.1.3 SPECIFIC ACTIVITY The Ifmitations on Secondary Coolant System specific activity ensure that the resultant offsite radiation dose will be limited to a small fraction of T 10 CFR Part 100 dose guideline values in the event of a steam line rupture.
This dose also includes the effects of a coincident 1 gpm reactor to secondary 'J tube leak in the steam generator of the affected steam line. These values are consistent with the assumptions used in the safety analyses.
3/4.7.1.4 MAIN STEAM LINE ISOLATION VALVES l The OPERABILITY of the main steam ~ine isolation valves ensures that no i more than one steam generator will blow down in the event of a steam ifne rupture. This restriction is required to: (1) minimize the positive reac-tivity effects of the Reactor Coolant System cooldown associated wi*,h the blowdown, and .(2) limit the pressure rise within containment in the event the steam line rupture occurs within containment. The OPERABILITY of the main steam isolation valves within the closure times of the Surveillance Require-ments are consistent with the assumptions used in the safety analyses.
3/4.7.2 STEAM GENERATOR PRESSURE / TEMPERATURE LIMITATION _ _ __ _,
l The limitation on steam generator pressure and temperature ensur?s that the pressure-induced stresses in the steam generators do not exceed the maximum allowable fracture toughness stress limits. The limitations of 70*F and 200 psig are based on a steam generator RT f 10*F and are sufficient to prevent brittle fracture. NOT l
I I
CATAWSA - UNIT 1 B 3/4 7-2
. l l
l JUSTIFICATION AND ANALYSIS OF SIGNIFICANT HAZARDS CONSIDERATION 1
The' proposed amendments would change the Surveillance Requirement acceptance criteria for the Auxiliary Feedwater pumps. These changes would make the Technical Specifications consistent with the values assumed in the accident analysis.
10 CFR 50.92 states that a proposed amendment involves no significant hazards I considerations if operation in accordance with the proposed amendment would not: I
- 1) Involve a significant increase in the probability or consequences of an accident previously evaluated; or
- 2) Create the possibility of a new of different kind of accident from any accident previously evaluated; or
- 3) Involve a significant reduction in a margin of safety.
The proposed amendment does not increase the probability or consequences of an accident previously evaluated and it does not create the possibility of a new or different kind of accident. Since the accident analysis associated with the Auxiliary Feedwater pumps was done using the proposed values, there
-is no increase in the associated consequences of previously evaluated accidents.
The proposed acceptance criteria do not involve a significant reduction in a margin of safety in that the proposed changes are those used in accident l i
analysis calculations,
.The Commission has previded guidance concerning the application of standards of no significant hazard determination by providing certain examples (48 FR
~
.14870). One of the examples of actions likely to involve no significant hazards considerations relates to a change which either may result in some increase to the probability or consequences of a previously-analyzed accident or may reduce in some way a safety margin, but where the results of the change are clearly within all acceptable critoria with respect to the system or com-ponent specified in the Standard Review Plan. Because the analysis described in the application for the proposed amendments shows that the results of the changes are clearly within the applicable accident analysis criteria, the example described above can be applied to this situation.
For the reasons described above, Duke Power Company concludes that the proposed amendments do not involve significant hazards considerations.
I
- - - - . .- _ . - . ,- c - - . , .