.m, REFUELIttG OPERATIONS
)
l 3/4.9.6 f4ANIPULATOR CRANE L IMITING-CON 0FHOtt FOR OPERATION
~
p -Q:
d 3 or buildin a
3.9.6 dnv&rodr-nr--fue! memb!ies and shall be OPERABLE with:The manipulato
'f vn) ahem blits W c:entro/ fcf y a.
Ine manipulator crane used for movement of fuel assemblies having:
4 1)
A minimum capacity of 3250 pounds, and 2)
An overload cutoff limit less than or equal to 900 ounds
- p db.
-The A 5
- dd I
- IT &C"" # l euxiliary hoist used for latching,an$ unla ing r h rods 1
having:
OD $C-1)
A minimum capacity of ounds, and y f'"f '
, r, O rc 7 2)
A load indicator which shall be used to prevent lifting leads e.
P in excess of 600 poundson the-core, pridroals.
APPLICABILITY:
During movement o(f-4 riveted; cr-faci assenhlies-within the reactor vessel.
puel agegmb/[eg opd cedrol rods ACTION:
(
g With the requirements for crane and/or hoist OPERABILITY not satisfied, suspend use of any inoperable manipulator crane and/or auxiliary hoist from operations involving the movement of dr4vc reds and fu;l e33ed,14es-within the reactor vessel.
M wMlimad QMrd m
SURVEILLANCE REOUIREMENTS i
k i
4.9.6.1 Each manipulator crane used for movement of fuel assemblies within the reactor vessel shall be demonstrated OPERABLE within 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> prior to the start of such operations by performing a load test of at least 3250 pounds and demonstrating an automatic load cutoff when the crane load exceeds 9
9 ""d'-
CA y c coM rA dca3 %d % %}-1cf 4.9,6.2 Each tauxiliary hoist and associated load indicator used for movement of3r4ve-rodstwithin the reactor vessel shall be demonstrated OPERABLE wit
~
100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> prior to the start of such operations by performing a load test of at least-61& pounds.
C i
5-I ticGUIRE - UNIT 1 3/4 9-7 Amendment. f40.
9607020078 960621 PDR ADOCK 05000369 P
REFUELING-OPERATIONS
.3/4.9:6 MANIPULATOR CRANE
)
LINITING CONDITION FOR OPERATION
~
0%etor buiMin}
om The manipulator crane and+ auxiliary hoist shall be used for movem 3.9.6 Y~dowe r.odr.--an h1
'e~4'4-and shall be OPERABLE with:
%e) appemblitS W Co&ol fods, The manipulator. crane used for movement of fuel assemblies having:
a.
1)
A minimum capacity of 3250 pounds, and 2)
An overload cutoff limit less than or equal to 900 9
- d d'*01 Y' *oundsS P'"
'"I A
j b.
-The,cuxiliary hoist used for latching 3-an4-unlatching having:
r4ve rods 1)
A minimum capacity of 1070unds, and yk"J*
2)
A load indicator which shall be used tohrevent lifting lea 8 l
in excess of 600 poundson the-cpra i l
a rdals.
l APPLICABILITY:
During movement of,dria/c-reds or=fucl assembHee within the reactor vessel.
(_pue) appbgeg and u2M rol Pod 6 ACTION:
k With the requirements for crane and/or hoist OPERABILITY not satisfied
}
suspend use of any inoperable manipulator crane and/or auxiliar operations involving the movement ot-dr4ve-reds-end fu;l essem'y hoist from reactor vessel.
ul4es-within the
(_ g 94 og gg g4 l
SURVEILLANCE REQUIREMENTS 4.9.6.1 the reactor vessel shall be demonstrated OPERABLE w the start of such operations by performing a load test of at least 3250 p o
and demonstrating an aJtomatic load cutoff when the crane load exceeds ns E ""
I or covdrd rodc1rog IcM hsf[vt 4.9,6.2 Each auxiliary hoist and associated load indicato of_2r-w' e rods within the reactor vessel shall be demonstr used for movement 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> prior to the start >f such operations by performing a load test of at least pounds.
@O McGUIRE - UNIT 2 3/4 9-7 m
Amendmcnt No.
166
p REFUELING OPERATIONS
~
3/4.9.6 -MINIPULATORCRANE (I
LIMITING CONDITION FOR OPERATION cVt f
3.9.6 The reactor building manipulator crane and auxiliary hoist shall be used for movement of dri.e.vs ur fuel =ursembMes and shall be OPERA 8LE with:
gMl 49ernblies> of contre >l rod 9 The manipulator crane used for movement of fuel assemblies having:
a.
1)
A minimum capacity of 3250 pounds, and 2)
An overload cutoff lim.it less than or equal to 2900 pounds, cud dm}
b.
-The-xiliary hoistr used for l'atching nlatching rods having:.
l A
/000 G
1)
A minimum capacity of % ounds, and 9pluj o_
2)
A load indicator which shall be used to prevent lifting in excess of 600 poundson-l-he. wrc inkrrp.b, APPLICABILITY:
During movement o[f drive red:=;r fac1 :::c-6::--withi
{
tha reactor vessel.
.J ACTION:
With the requireraents for crane and/or hoist OPERABILITY not satisfied, suspend,
use of any inoperable manipulator crane and/or auxiliary hoist from operations 16volving the movement of ddvc rods cr.d feel a::c=blics within the reactor
- j ussel.
k Q $ <F d/l[es Orld. GO qtrof rod.5 L.
SURVEILLANCE REQUIREMENTS 4.9.6.1 Each manipulator crane used for movement of. fuel assemblies within the reactor vessel shall be demonstrated OPERABLE within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> prior to tha start of such operations by performing a load test of at least 3250 pounds and demonstrating an automatic load cutoff when the crane load exceeds 2850 pounds.
gg g g y1 gg
.9 6.2 Each auxiliary hoist and associated load indicator used for movement wrods within the reactor vessel shall be demonstrated OPERABLE within o
72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> prior to the start of such operations by performing a load test of at leas -GN-pounds.
/@
(
l CATAWBA - UNITS 1 & 2 3/4 9-8 i
l A
i, t
Page 1 of 3 j
i Descrintion of Proposed Channes and Technical Justification -
l Part I:
The changes in Part I of this proposed amendment are an administrative clarification in that they more accurately align the TS wording with the actual procedures and practices utilized at both McGuire and Catawba Nuclear Stations, and as stated in the Bases.
Technical Specification 3.9.6.b.2 indicates the n niliary hoist used for latching and unlatching drive rods shall have a load indicator which shail be used to prevent " lifting loads" in excess of 600 pounds. The term " lifting loads" has created some confusion as to whether or not the lifting tool, drive rod, and control rod weights are included in the 600 pound value. This amendment proposes changing " lifting loads" to " lifting force".
The intent of this requirement, as stated in the Bases for T/S 3/4.9.6, is to ensure the core internals and reactor vessel are protected from excessive lifting forces in the event they are inadvertently engaged during lifting operations. The 600 pound value given in the Technical Specification originates from limits specified in Westinghouse General Equipment Specification 952260 Rev. 03.
In paragraph 3.2.11.10, a specific limit of 600 pounds is given for Guide Tube loads due to a jammed Rod Control Cluster (RCC) in both the upward and downward directions. Thus, the Technical Specification provides protection for the guide tube which is part of the reactor vessel upper internals structure. The 600 pound " lifting load" limit given in the Technical Specifications 3.9.6.b.2 (for both MNS and CNS) refers to the dynamic force that may be inadvertently applied to the guide tube only. It_does not include loads registered on the indicator by_the static weights of the latching tool, drive rod, or control rod. Therefore the actual limiting load reading on the indicator will be 600 pounds greater than the combined values of the static weight of the latching tool, drive
(
rod and control rod.
Further administrative word enhancements were added to T/S 3.9.6.b.2 for a more effective description of both the activities and the components of concern.
1
,m
.-re,---
v,,-
-r,,,
,e
i Page 2 of 3 l
I Part II:
T The changes in Part II (see MNS Unit 1 markup as a guide) of this proposed amendment are an administrative clarification in that they more accurately align the TS wording with the actual procedures and practices utilized at both McGuire and Catawba Nuclear Stations. This is evidenced in the items below:
Ila.
The change of the T/S references " drive rods or fuel assemblies" to " fuel assemblies and/or control rods" is actually two changes. The first changes the term " drive rods" to " control rods" to effect a more accurate description of refueling activities which the LCO is intended to address. The second changes the order of the items in the reference into their logical order with respect to the listing " manipulator crane and auxiliary hoist" as it is given in the line above in the LCO. This change of T/S references was effected in both the applicability and the action statements as well. These T/S references were changed in both the applicability and the action statements.
iib.
In line 3.9.6.b, the term "The auxiliary hoist" was changed to " Auxiliary hoists" to provide I
flexibility and protection to utilize other hoists in the future provided they meet the technical requirements of this specification.
In the same line, drag load testing was added into the activities under the control of these specifications, because the core internals and reactor vessel are at risk to the same forces during these tests as they are during refueling activities. This provides the same protective measures for these testing activities as are required during refueling activities. This same addition was also made in the associated surveillance 4.9.6.2.
IIc.
In the LCO, 3.9.6.b.1, and the surveillance 4.9.6.2, the minimum capacity value is changed from 610 to 1000. This change more accurately reflects the actual minimum capacity i
required and retained by the hoists. Both McGuire and Catawba actually load test the hoists j
to k 1000 pounds.
Ild.
(Applies to MNS only) Adding " reactor building" into the first line is a descriptive administrative clarification that brings MNS's manipulator crane term in line with that of CNS.
Part II of the amendment more accurately defines auxiliary hoist minimum capacities and gives a more expansive description of the activities for which protective measures and surveillance testing are utilized.
t
f Page 3 of 3 Part II: (cont.)
Imnact To McGuire and Catawba FSARs i
The McGuire and Catawba FSARs were reviewed for technical impact with regard to this proposed amendment to Technical Specification 3/4.9.6. Chapter 3 (Design Criteria),
Chapter 4 (Reactor), Chapter 5 (Reactor Coolant System) and Chapter 9 (Auxiliary Systems) were reviewed and revealed no manipulator crane or auxiliary hoist load values i
or testing limits. Thus, the proposed amendment does not impact or require any changes to the FSARs.
l l
e t
l l
I
l l
l l
No Sienificant Hazards Consideration:
l j
Question: Will the change involve a significant increase in the probability or consequences of an accident previously evaluated?
No. The proposed change is administrative in nature and does not represent any changes to the refueling process in the field. It more accurately describes the l
components for which the LCO's protection is intended as well as giving a more accurate description of the auxiliary hoist's minimum capacity. It also broadens the domain of activities for which protective measures are taken, by including drag Irai testing into monitored activities. At both MNS and CNS, the auxiliary hoists d (ne manipulator cranes are rated at 2 3000 pounds and are surveillance tested i
to greater than 1000 pounds. This brackets the limit force lifting value change from 600 to 1000 pounds in the amendment proposal.
l l
Question: Will the change create the possibility of a new or different kind of j
accident from any accident previously evaluated?
l l
No. This proposed administrative change reflects no changes in the refueling processes, or any systems, structures or components connected with the refueling process.
j Question: Will the change involve a significant reduction in a margin of safety?
No. The proposed administrative change has no impact on refueling processes, systems, structures or components, and does not result in any significant reduction in a margin of safety. The subject change only clarifies the original intent of the specification and more accurately describes the involved components, component capacities and the domain of activities for which measures are taken to protect the I
reactor internals.
t EnvironmentalImpact Assessment This proposed Technical Specification Amendment represents no adverse impact t
regarding releases of activity, any form and/or content of radioactive material, occupational exposure or any other non-radiological concerns.
I
4 4
Umlated TS Paces:
See attached.
3 l
REFUELING OPERATIONS 3/4.9.6 MANIPULATOR CR/JE LIMITING CONDITION FOR OPERATION 3.9.6 The reactor building manipulator crane and an auxiliary hoist shall be used for movement of fuel assemblies or control rods and shall be OPERABLE with:
a.
The manipulator crane used for movement of fuel assemblies having:
1)
A minimum capacity of 3250 pounds, and 2)
An overload cutoff limit less than or equal to 2900 pounds.
b.
Auxiliary hoists used for latching, unlatching and drag load testing of control rods having:
1)
A minimum capacity of 1000 pounds, and 2)
A load indicator which shall be used to prevent applying a lifting force in excess of 600 pounds on the core internals.
APPLICABILITY:
During movement of fuel assemblies and control rods within the reactor vessel.
ACTION:
With the requirements for crane and/or hoist OPERABILITY not satisfied, suspend use of any inoperable manipulator crane and/or auxiliary hoist from operations involving the movement of fuel assemblies and control rods within the reactor vessel.
SURVEILLANCE REOUIREMENTS I
4.9.6.1 Each manipulator crane used for movement of fuel assemblies within the reactor vessel shall be demonstrated OPERABLE within 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> prior to i
the start of such operations by performing a load test of at least 3250 pounds i
and demonstrating an automatic load cutoff when the crane load exceeds i
2900 pounds.
4.9.6.2 Each auxiliary hoist and associated load indicator used for movement of control rods or control rod drag load testing within the reactor vessel l'
shall be demonstrated OPERABLE within 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> prior to the start of such operations by performing a load test of at least 1000 pounds.
McGUIRE - UNIT 1 3/49-7 Amendment No.
L
REFUELING OPERATIONS 3/4.9.6 MANIPULATOR CRANE j
LIMITING CONDITION FOR OPERATION 3.9.6 The reactor building manipulator crane and an auxiliary hoist shall be used for movenent of fuel assemblies or control rods and shall be OPERABLE with:
a.
The manipulator crane used for movement of fuel assemblies having:
1)
A minimum capacity of 3250 pounds, and 2)
An overload cutoff limit less than or equal to 2900 pounds.
b.
Auxiliary hoists used for latching, unlatching and drag load testing of control rods having:
1)
A minimum capacity of 1000 pounds, and 2)
A load indicator which shall be used to prevent applying a lifting force in excess of 600 pounds on the core internals.
APPLICABILITY:
During movement of fuel assemblies and control rods within the reactor vessel.
ACTION:
With the requirements for crane and/or hoist OPERABILITY not satisfied, suspend use of any inoperable manipulator crane and/or auxiliary hoist from operations involving the movement of fuel assemblies and control rods within the reactor vessel.
SURVEILLANCE RE0VIREMENTS 4.9.6.1 Each manipulator crane used for movement of fuel assemblies within the reactor vessel shall be demonstrated OPERABLE within 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> prior to the start of such operations by performing a load test of at least 3250 pounds and demonstrating an automatic load cutoff when the crane load exceeds 2900 pounds.
4.9.6.2 Each auxiliary hoist and associated load indicator used for movement of control rods or control rod drag load testing within the reactor vessel shall be demonstrated OPERABLE within 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> prior to the start of such operations by performing a load test of at least 1000 pounds.
McGUIRE - UNIT 2 3/4 9-7 Amendment No.
REFUELING OPERATIONS 3/4.9.6 MANIPULATOR CRANE LIMITING CONDITION FOR OPERATION 3.9.6 The reactor building manipulator crane and an auxiliary hoist shall be used for movement of fuel assemblies or control rods and shall be OPERABLE with:
a.
The manipulator crane used for movenent of fuel assemblies having:
1)
A minimum capacity of 3250 pounds, and 2)
An overload cutoff limit less than or equal to 2900 pounds.
b.
Auxiliary hoists used for latching, unlatching and drag load testing of control rods having:
1)
A minimum capacity of 1000 pounds, and 2)
A load indicator which shall be used to prevent applying a lifting force in excess of 600 pounds on the core internals.
APPLICABILITY:
During movement of fuel assemblies and control rods within the reactor vessel.
l l
ACTION:
With the requirements for crane and/or hoist OPERABILITY not satisfied, suspend use of any inoperable manipulator crane and/or auxiliary hoist from operations involving the movement of fuel assemblies and control rods within the reactor vessel.
i SURVEILLANCE RE0VIREMENTS 4.9.6.1 Each manipulator crane used for movenent of fuel assemblies within the reactor vessel shall be demonstrated OPERABLE within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> prior to the start of such operations by performing a load test of at least 3250 pounds and demonstrating an automatic load cutoff when the crane load exceeds 2850 pounds.
l 4.9.6.2 Each auxiliary hoist and associated load indicator used for movement of control rods or control rod drag load testing within the reactor vessel shall be demonstrated OPERABLE within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> prior to the start of such operations by performing a load test of at least 1000 pounds.
i CATAWCA - UNIT 1 3/49-9 Amendment No.
l L-
. REFUELING OPERATIONS 3/4.9.6 MANIPULATOR CRANE LIMITING CONDITION FOR OPERATION l
3.9.6 The reactor building manipulator crane and an auxiliary hoist shall be used for movement of fuel assemblies or control rods and shall be OPERABLE with:
a.
The manipulator crane used for movement of fuel assemblies having:
1)
A minimum capacity of 3250 pounds, and i
2)
An overload cutoff limit less than or equal to 2900 pounds.
i b.
Auxiliary hoists used for latching, unlatching and drag load testing of control rods having:
1)
A minimum capacity of 1000 pounds, and 2)
A load indicator which shall be used to prevent applying a lifting force in excess of 600 pounds on the core internals.
APPLICABILITY:
During movement of fuel assemblies and control rods within the reactor vessel.
ACTION:
With the requirements for crane and/or hoist OPERABILITY not satisfied, suspend use of any inoperable manipulator crane and/or auxiliary hoist from operations involving the movement of fuel assemblies and control rods within the reactor vessel.
SURVEILLANCE RE0VIREMENTS
)
4.9.6.1 Each manipulator crane used for movement of fuel assemblies within the reactor vessel shall be demonstrated OPERABLE within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> prior to the start of such operations by performing a load test of at least 3250 pounds and demonstrating an automatic load cutoff when the crane load exceeds 2850 pounds.
4.9.6.2 Each auxiliary hoist and associated load indicator used for movement of control rods or control rod drag load testing within the reactor vessel shall be demonstrated OPERABLE within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> prior to the start of such operations by performing a load test of at least 1000 pounds.
CATAWBA - UNIT 2 3/49-9 Amendment No.
L