Partially Withheld Application by J Herman for Operator License
ML20129H146
Person / Time
Site: Three Mile Island  Constellation icon.png
Issue date: 01/31/1979
From: Herman J
METROPOLITAN EDISON CO.
To: Collins P
Office of Nuclear Reactor Regulation
Shared Package
ML20125B444 List: ... further results
References
FOIA-96-207 NUDOCS 9610080023
Download: ML20129H146 (4)


Text

- - _ _ _ _ _ _ _ __ . - - _ - - . - _ _ - _ _ _ _ _ _ __ ___ _

g ImC79-05 f

.W ,

  • 2.dI ,:,,.;_f f

- .,n...,~.,..,.~,,,

j METROPOLITAN EDISON COMPANY _ . . . . . . . . _ _ _ . . .

T E L.E PHONE 717 944.404 f POST OFFICE BOX 480 MIDOLETOWN. PENNSYLV ANV. 17097 January 31, 1979 11r. Paul F. Collins U.S. f:uclear Regulatory Comission Office of fluclear Reactor Regulation liashington, D.C. 20555

Dear fir. Collins:

Please consider this application for a I!eactor Operator's License examination.

In accordance with Section 55.10 of 10CTR55, the following infomation is submitted:

1. flancq.__dqhn C. Heman. II -

i h

Age:

L. - Metropol tan Edison Company, ihree !!ile Island fluclear Present Employment:

Station Unit I.

2. a) Education:
1. R ;f land Senior Hi h School

- Etters, Pa.

j 3. Boile.- Tech "A" School ( 1970)

(9 wks) Graduated - Great Lakes, 111. Information in !Ns rSC0rd ,.c de'e'ed I

in codnce M e Freeh OIinformation 4 llater Testing (9/71) (1 uk) Act, exemptions Graduated - Boston, fiass.

F01A. 9L- 3CO'

5. Destroyer Schnol (1970) (5 uks)

Graduateel - flewport R. I .

! 6. Druq [ducation ',rAnn1 (l'17, (1 ut)

Graduated - flewourt. I . i .

-9' 1H9 i 7. Tire ilohtinq *,chool (1972) (.? uk)

Graduated - flewport . I!. l .

i

~

9610080023 960924 PDR FOIA DEKOK96-207 PDR

January 31,19/?

.llr. Paul F. Collins

,d ' .

. 8. P. ace P. elations School (3/73 ) (2 nts)

Graduated - flewport, R.I.

o b) Experience:

1. U.S. flavy (1970-1973) E-5 Boiler Technician
2. Auxiliary Bay Operator (1974-1975)

Crawford Station, fliddletown, Pa.

3. Policeman - (1974)

Hiddictown Police Department fliddletown, Pa.

4. Auxiliary Operator "C" (06/16/75-06/13/76) Metropolitan Edison Company. Three fille Island fluclear Station, Unit 1.

fly experience as an Auxiliary Operator "C" Nuclear included quall-fying in secondary systens, operating procedures and alarm responses.

I also operated the secondary systems and equipment for plant start-up and shutdowns and performed switching and tagging.

5. Auxiliary Operator "B" (6/14/76-6/12/77) Metropolitan Edison Company, Three title Island fluclear Station, Middletown Pa. Unit 1 11y experience as an Auxiliary Operator "B" Nuclear included qualifying in primary systems, nperating procedures and alarm responses. I also i

operated the primary systems and equipment for plant startups and shut-

' downs and perforwed switching and tagging.

6. Auxiliary Operator "A" Nuclear (6/13/77-5/28/78) !!ctropolitan Edison Company, Three fille Island fluclear Station, Middletown, Pa.

My experience as an Auxiliary Operator "A" fluclear included studying J

f systens and operating prncedures and alarm responses. I have also operated systems and equipment for plant startups and shutdowns and perforred switching and taqqinq.

7. Control Room Operator - flucicar (5/29/78 - present) fictropolitan Edison Company Three Mlle Island fluclear Station, Unit I, filddle-town, Pa.

Expertence as a Contrni Ronn Operator fluclear consists of studying plant systems, operating procedures and alarm responses, operating systems and equipment for plant startups and shutdowns, and directing the ef forts of others in this direction and performed switching ard tagging.

3. Previous Operator's License flumber - flone 4 Lici:nse is requested to operate a pre'surized water rnactor; flotropolit.in Edison Company, ihreo fille Island fluclear Station, Unit !.
5. See attached Ictter.

3- 3.00 {

1

o I

' i i .

Jrnuary 31, 1979 l lir. hul F. Collins l 4

j t

6. See Enclosure I.
7. I'.edical exaninstien will be forwrded under separate cover, i Sincerely yours, i y h',.s C $\ e.s .W. b 5

4

\. John C. tierman, !! l j I JCit/deg i

Cnclosure  :

} .

.i

e i

I. I.

s 4 .

k 4

t I

e 1

e 0

I.

i 4

I, 4

a .I 1  ?

)

l

- 9 1 0 1.

l l

- , \

. . j

,. l I

t EllCLOSURE I TRA!!alflG PROGP.A!i J RECE!VED BY:  ;

i John C. lierran The general ou'.line of Mr. Herman's trainin9 follows:

1. Auxiliary Occi ator "B" Traininq Progran (06/06/075 05/14/76) (512 hours0.00593 days <br />0.142 hours <br />8.465608e-4 weeks <br />1.94816e-4 months <br />)

A. fiechanical Fundar.entals B. Secondary Systens l C. Electrical Systens D. On the Job Training

2. Auxiliary Operator "C" Yearly Review (05/17/76-05/21/76) (40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />)
3. Auxiliary Operator "A" fluclear Training Program (06/14/76-06/12/77) (1040 hours0.012 days <br />0.289 hours <br />0.00172 weeks <br />3.9572e-4 months <br /> A. !bth (80 hrs)

D. Atomic Physics (20 hrs)

C. Iluclear Physics (60 hrs)

D. Reactor Operations and Kinetics (140 hrs)

E. Core Perfarnance (60 hrs)

F. Plant Chemistry (40 hrs) l G. !!uclear Instrumentation (20 hrs)

H. Radiatio.i Protection (80 hrs)

1. Plant Operation (40 hrs) l J. Studied reinary and secondary systens and operation thereof on an OJT l basis. (500 hrs) l
4. Category IV CR0 Program (5/29/78-present) (Mininum 800 hrs)

Guideline Attached

5. PWR Sinulator Traininq Pronran (02/12/79-02/23/79) (80 hrs)

I will have completed a two week course in operator training on the Babcock and Wilcox fluclear Power Plant Simulator at Lynchburg, Va. prior to my licensing exan. A copy of the Startup Certification letter and copies of the sinulator training evolutions perforned and classroom training will be ,

forwarded to you by Babcock and Ullcox.

I

-5) 1.ris:

4 t

ew mm@