ML20024B758
| ML20024B758 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 07/10/1975 |
| From: | Zewe W METROPOLITAN EDISON CO. |
| To: | Collins P US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| TASK-01, TASK-04, TASK-1, TASK-4, TASK-GB GPU-2077, NUDOCS 8307110344 | |
| Download: ML20024B758 (4) | |
Text
-
GPM 2012 h
-s 4
F l
t I
I 1
l 8307110344 750710 PDR ADOCK 05000289 i
V HOL l
q
. Q 't
\\
' ' '1 j'
.4m.-
gg j
G
,; 5.~,. M.
METROPOLt. AN EDi50N COMPANY 's::s::.*.:.erenz:anu j
cT o.=Fics eox pso MiooLEToWN. PENNSYLVANIA 17057 TELEPHONE 717.* 'M July 10, 1975 f LOh Mr. Paul F. Collins Chief Operator Licensing Branch
. Directorate of Licensing Nuclear Regulatory Comission
- /
Washington, D.C.
20545
Dear Mr. Collins:
P1 ease consider this application for a Senior Reactor Operatop's. license examination.
In accordance with Section 55.10 of 10CFR55, the following infor::ation is submitted:.
1.
Name:
William H. Zewe Border Lane R.D.fi Hershey, Pa 17033 Ace:
29 - Citizen of the U.S.A. by birth Present Emslovment: Shift Forse:a$, Metropolitan Edison Corepany, Three Mile Island Nuclear Station Unit I.
2.
(A) 5ducation:
1." W. Hifflin, North - (1961-1954)
. Graduated - W. Miffl.in, Pa.
2.
Steel Valley Techndcal School - (1964-1965) - Graduated -
W'.. Hifflin, Pa.
~
3.
Electronics "A" School - Graduated - Great. Lakes, Ill. (36 weeks 4.
Basic Nuclear Power School - Graduated - Bainbridge, Md. (26 wee!
5.
Nuclear Power Prototype School "S-3G Prototype" ' Graduated -
West Milton, N.Y. (26 weeks) 2.
(Bi kn.arif.q'.a:
. t.
' t. ry..... c J.
.*.I. '.,/72 - 10/1/70' "a:re;::1 i:.1:. Hi:cn Co:::puy, Tnr e Mile Ishnd ::aclear Statton, Middieeown, Pa.
.. AS.
sn Auxilicrv Cm entero X m n WBAs-BiM D h 2n c="'* C -
.ir. Paul F. Collins
~
page g
$b July 10,1975
&7 t
' n'.-
i operations and menitoring of the TMI Unit I Balance of Plant Systems during hydro and hot functional tasting programs.
2.
Shift Foremen (IO/I/73 - present) Metropolitan Edison Company Three Mile Island Nuclear Station, Middletown, Pa.
As a Shift Foreman, I' participated in TMI Unit I Hot Function i
Testing, fuel handling evolutions, and core loading activitie. :
Additonally, I participated in the initial startup and power escalation program of 114I Unit I.
Sinca cocmercial operation in September,1974, I have operated Unit'I on a regular shift and participated in numerous reactivity manipulations and div, of experience operations as defined in Metropolitan Edison Cc:
Operator P.equalification Program.
Since comercial operatien '
have performed these manipulations and operations both at THI
~
Unit I and the Babcock and Wilcox simulator facility in Lynchi '
3.
Previous Operator's License - OP 3614, TMI Unit I, (expiratic'n date"-
August 8,1976).
4.
License is requested to ope' rate a pressurized water reactor:
Edison Company, Three Mile Island Nuclear Station Unit I*. ~ Metmp:
t
)
5.
See attached 1etter.
~
6.
See Enclosure I.
(Enclosure I includes only the training received si August 8..1975.
Training prior to this date was fc
.. s..
with my Reactor Operator's license app 1Teation dats.
May 20,1974 7.
Medical examination will be forwarded under separate cover.
Sincerely yours,
.Q' ! b:: 4rb/
$fWJ '
l i
Htlliam H. Zewe
- WH2: jam Enclosure g
(
l,,___-____.--.-
- - - ' - - ' ' - ' ' ' ~ ' * - ~ ~ ~ * ~
_ _ _ s
. ~
~.:.
\\
~
I.
Pr.rticipation'in t e i trepolitan Edison Cc=pany Oper tor Re.
.::i quciffication Program:
..n Tnis prograc c:nsisted of approxima,t 90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> of formal classroom lectures on such topics as abncr 7
occurrences,,6;erational quality' assuranca, e=argency procedur Topics A through L on the tiRC license examinations.
All liceradiation control-and' safety, major holders either participated in all 1s:turas or r.ade, up the ma presented with specific assign =ents.
2 Participation in a retraining program designed to cover balan plant areas and requirements not covered by the riqualificati.
program:
This program consisted of aoproximately 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> of formal classroom instruction in such areas.n.t first aid, pret ment, switchyard and substation, chemistry requirecents, etc.
3.
Participation in a one we'ek simulator requalifier. tion progra the Babcock and Wilcox simulator facility in Lynchburg, Vir The course consisted of 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> of classroom instruction. gir A
summary of the evolutions performed is attached.
4.
Participation in a classroem' training program designed to spet ifically cover and discuss areas fr:m sections A-L of the f1RC license examination.
hours of classroom instruction.The program consistad of appro Participation in a '15 hobr classroem training program desi r
5.
~
' cover, in, core depth, specif.fc areas listed in !4 above.
gned 6.
Partici ation'in nor=al operation of Unit Y including reactivi manipul tions and diversity of e.nerience.cserations as requir
,.,by the Metropolitan Edison, Company 0perator Requalifical:icn 'Pr 110T2:
Unless otherwise indicata!d the a;plicant has participated (
made up with specific assign =an s as in il) in the approxim number of hours shown for the course.
e l
l
..r.
8 e
O e
l l
t
. __