ML21197A032

From kanterella
Revision as of 06:01, 17 January 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search

Review of the Fall 2020 Steam Generator Tube Inspection Report
ML21197A032
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/21/2021
From: Scott Wall
Plant Licensing Branch III
To:
Entergy Nuclear Operations
Wall S
References
EPID L-2021-LRO-0014
Download: ML21197A032 (4)


Text