Rev 0 to Procedure GOP-OLC-001.00, Operator License Candidate:Abnormal Operating Procedures,Serious Control Room Fire AB-1203.26
ML20141N176
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/31/1986
From: Gavioli M
TOLEDO EDISON CO.
To:
Shared Package
ML20141N145 List:
References
GOP-OLC-001.00, GOP-OLC-1.00, TAC-61015, NUDOCS 8603040446
Download: ML20141N176 (17)


Text

S;rirl No. 1242 Attichment 7 LESSON PLAN REVISION / REVIEW HISTORY EO 7351 LESSON PL AN TITLti LESSON PLAN NUMBER

$fd4ss faultol hs- Ed6 AdNC$ 24 Ga/2 -dtd -et/. 00 AFxAmsf24 RE I5t N DATE oY SIG N ATU RE 9ER 2

.0 - 1% M dw .' /. nMS r- ( W '

'r N 1

m-_

l i ,

I i

I i

I i I ,

l ,

l  !

l I

I f

I .

i ,  !

l

i i

f 1

i

~

Se8AUSSIN!A6 V

I

GOP-OLC-001.00 Attachment ?.6  :

Program

Title:

OPERATOR LICENSE CAWDIDATE Course

Title:

PROCEDURES NORMAL, ABNORMAL, AND EMERGENCY Lesson

Title:

ABNORMAL OPERATING PROCEDURES Approximate TLee: Hours Revision No.: 00 Date: 8510 Resource Materials for the Instructor:

Job Aidst Applicable Abnormal Procedure Audio / Visual Equipment Needed: Overhead Projector List of Transparencies:

Equipment / Tools: None Safety Requirements: None Instructional Setting: Classroom Student Materials: Pen or Pencil, Paper, Handout Special Considerations: None Instructor

References:

AD 1828.10, AD 1805.00, Ai 1203, Reg Guide 1, 33 10 CER 50, Technical Specifications Student

Reference:

AB 1203 Applicable AD 1828.10, AD 1805.00, AB 1203, Reg Guide 1, 33 10 CER 50, Technical Specifications 1 of 16

4 SERIOUS CONTROL ROOM FIRE AB-1203.26 GOP-OLC-001.00 1

Attachment 26 OBJECTIVES OBJECTIVE. OBJECTIVE TEXT...............................................

NUMBER 0 UPON SUCCESSFUL COMPLETION OF START-UP TRAINING, TE REACTOR OPERATORS AND SENIOR REACTOR OPERATORS WILL BE ABLE TO PROPERLY APPLY THE ABNORMAL PROCEDURES NECESSARY '

FOR PROPER TASK PERF0F3ANCE.

00 THE FOLLOWTNG ENABLING OBJECTIVES ASSOCIATED WITH THIS LESSON PLAN ARE DESIGNED TO SUPPORT THE " KNOWLEDGE" REQUIREMENTS FOR TE ABOVE TERMINAL OBJECTIVE.

000 THE TRAINEE, WITHOUT REFERENCES (UNLESS OTHERWISE SPECI-l FIED), ACCORDING TO APPROVED PROCEDURES, WILL BE ABLE TO:

01 GIVEN SPECIFIC SYMPTOMS, CORRECTLY RECOGNIZE THE APPLICA-BLE ABNORMAL PROCEDURE.

02 LIST / STATE THE FINAL PLANT CONDITION THAT THE ABNORMAL PROCEDURE DIRECTS THE PLANT TO BE PLACED IN.

03 RECALL / IDENTIFY THE PLANT EQUIPMENT / SYSTEMS AVAILABLE TO THE OPERATOR DURING THE PERFORMANCE OF THE ABNORMAL i PROCEDURE.

04 LIST / STATE THE FINAL CONDITION OF SELECTED PLANT SYSTEM, WHEN TE ABNORMAL PROCEDURE IS COMPLETE.

05 WHEN PROVIDED WITH A SPECIFIC NOTE AND/OR CAUTION, CORRECTLY LIST / STATE TE REASON FOR THE NOTE AND/OR CAUTION.

> 06 LIST / STATE THE EMERGENCY ACTION LEVEL TE STATION / SITE IS

IN WHEN TE ABNORMAL PROCEDURE IS
ENTERED, IN PROGRESS, 2

COMPLETED (SRO ONLY).

07 BRIEFLY DESCRIBE TE ACTION (S) THAT EACH INDIVIDUAL IS DIEECTED TO PERFORM, IN ACCORDANCE WITH THE ABNORMAL PROCEDURE (SRO ONLY - ALL INDIVIDUALS ACTIONS).

/ ,

l 2 of 16 i ,

- _, , . , . _,. +-_-___,__m_y

SERIOUS CONTROL ROOM FIRE AB-1203.26 GOP-OLC-001.00 Attachment 26

1.0 INTRODUCTION

The intent of this lesson is to introduce / review the Serious Control Room Fire Abnormal Procedure. The material (s) that you are responsible for is/are stated in the objective for this lesson.

2.0 PRESENTATION A. Symptom (s) that indicate entrance into this abnormal procedure:

1. Extremely serious fire in the Control Room or Obi #1 Cable Spread Room requiring a prolonged evacuation of the Control Room.

NOTE: The fire is assumed to be intelligent and may have the capacity to place control circuits is the least desirable position.

B. Operator Actions The instructor has the option of go-NOTE: Operator actions are performed simul- ing to 2.C.4 and.

taneously. This lesson will cover each reviewing final individuals actions. plant conditions prior to covering individual action.

CAUTION: The required operator actions to mitigate Obj #5 this event involve disabling many plant safety systems to prevent inadvertent operation caused by the fire. The procedure assumes the opera-tor actions will place the plant in the safest possible condition and then isolate the compo-nent in that position by removing its power or failing its operating device. The operator actions in some cases are in violation of various technical specifications, however, these actions are necessary to mitigate the event to stabilize the plant in Hot Standby.

1. Reactor Operators Obi #3 and #7
a. Trip the reactor and turbine.
b. Isolate letdown shut MU2B.

3 of 16

I t

, i SERIOUS CONTROL ROOM FIRE AB-1203.26 GOP-OLC-001.00 '

Attachment 26

c. Close RC11, PORV Block.
d. Open RC239A, pressurizer steam sample. '
e. Start the second makeup pump and shift suction to the BWST - NU3971. l
f. Trip SFRCS on low steam generator level. ,
g. Trip all source breakers to "A" and "B" buses.
h. Start both LPI and HPI pumps.

i '. Obtain keys in the Emergency Key Locker and report to the Fire Emergency Cabinet outside

  • Control Room.

1 NOTE: In the event that all personnel required to carry out the actions mentioned in this procedure are not in the Control Room at the time the accident occurs, indications such as station blackout, lifting of steam safeties, and operation of equipment not normally functional during power

operations would serve to alert the operators to contact or assemble in
or around the Control Room area.

Shift Supervisor, Assistant Shift Supervisor, Reactor Operators and Equipment Operators are now assembled at the Fire Emergency Cabinet.

2. Shif t Supervisor
a. Obtain flashlight and radio and proceed to the Auxiliary Shutdown Panel. l I
b. Take local control of the components at the Auxiliary Shutdown Panel.
c. Control OTSG 1evels with the auxiliary feedwater pumps.

d

d. Monitor OTSG pressure to ensure code safeties

]

valves are maintaining 1050 psig - when Reactor Operator 2 establishes manual control of the atmospheric vent valves; maintain OTSG pressure {

at 1000 psig, i l

3 4 of 16 i 1

I

SERICUS CONTROL ROOM FIRE AB-1203.26 GOP-OLC-001.00 Attachment 26

e. Mocitor pressurizer level - control at greater than 100 inches. EO-1 throttles MU-211 to maintain level. If makeup pumps are not available use Piggyback Mode to control RCS invento ry.
f. Control RCS pressure as necessary by having the ASS nonitor the gauge at RC-54.

NOTE: Auxiliary Shutdown Panel pressure indications may not be functioning if the SFAS cabinets have de-energized.

Perform couparison checks to verify the indicators; if they are correct use the indicators periodically verify the indicators,

g. Control RCS tenperature by maintaining OTSG pressure. Obtain TK and TC readings from the I&C mechanic.

NOTE: Auxiliary Shutdown Panel temperature indications may not be functioning if the RPS cabinets have de-energized.

Perform comparison checks to verify the indicators; if they are correct use the indicators - periodically verify the indicators.

h. When the plant has stabilized in Hot Standby; lineup for a RCS sample for boron.
3. Assistant Shift Supervisor (ASS)
a. Obtain flashlight, radio and tool kit from Removes power from the cabinet and proceed to the locations valves and pumps.

Which ATT 2 directs. Isolates the Con-trol Room inputs to the D.C.'s.

b. The ASS and the plant electrician (ELECT) Monitors RCS Pres-will proceed to EDG1-1 Room and perform sure.

the actions directed by Attachment 13 - basi-cally isolate all inccaing signals to the diesel generator.

c. The ASS and the ELECT will then proceed to EDG1-2 Room and perform the same actions as accomplished in Room 1-1.

5 of 16

SERIOUS CONTROL ROOM FIRE AB-1203.26 GOP-OLC-001.00 Attachment 26

d. Trips or opens the breakers on the following motor operated valves:

(1) AF 3870 (2) AF 360 (3) MS 106 (4) SW 1382 (5) SW 1368 (6) CC 5095

)

(7) CC 5097 (8) FW 790 (9) AF 388 (10) AF 3371 (11) RC 200 i

(12) SW 1367 (13) SW 1366 (14) FW 601 (15) CC 2649 (16) CC 2645 '

(17) FW 786 (18) NU 3971 (19) SW 1383 (20) DH 9A

e. Racks out the containment spray pump breakers and trip /open BA pump breakers.
f. Places the following emergency control trans-fer switches in "EMERG".

1 6 of 16

. .- - . - . ~ .

i, SERIOUS CONTROL ROOM FIRE AB-1203.26 GOP-CLC-001.00 Attachment 26 l

~

(1) All El Bus.

(2) All F1 Bus.  ;

g. Places ALL emergency control transfer switches to " LOCAL" on the following:  !

i (1) CD E12 4-1 (2) CD E12 A-2 (3) CD F12 A-1 ,

(4) CD F12 A-2 .

i (5) CD Fil D (6) CD E11 D (7) CD Fil C 1

h. Isolates Control Roon power to makeup pumps: AC j

& DC oil pumps and auxiliary gear oil pumps.

i. Verify open/open the following:

i (1) HV 5305A (2) HV 5305B  !

(3) AF 599 (4) RC 54 Verify closed /close the following:

j.

(1) SW - 1383 (2) SW - 327 '

k. Isolate air and bleed off the regulators on the ,

following valves:

(1) SW 1356 (2) SW 1357 7 of 16

SERIOUS CONTROL ROOM FIRE AB-1203.26 GOP-OLC-001.00 Attachment 26 s

i. (3) SW 1358 1

7

4. Reactor Operator 1 -
a. Obtain flashlight, radio and tool kit from the cabinet and proceed to the locations which ATT 3 directs.
b. At the Diesel Generator Rooms (1) Fails open the component cooling water outlet valves. CC1474 & 1471.

(2) Turn isochronous droop switch to isochronous.

(3) Turn voltage regulator droop switch to 4

off.

J (4) Adjust frequency to 60 Hz.

(5) Adjust voltage to 4300 VAC.

(6) Place all emergency control transfer  !

switches to " LOCAL" at the following: ,

(a) CD F12B (b) CD E128  :

f

, (7) Trip the breakers for the following MOV's:

(a) AF 3872 [

(b) MS 106A i c. At the High Voltage Switchgear Roops:

(1) Verify tripped / trip the source breakers to r A & B buses and remove Control Power.

(2) Remove control power from A & B buses load breakers.

1 (3) Place all emergency control transfer switched in " LOCAL" for the following:

i b ,

8 of 16

SERIOUS CONTROL ROOM FIRE AB-1203.26 GOP-OLC-001.00 l Attachment 26 [

}

(a) C1 Bus (b) D1 Bus (4) Trip bus tie transformer source breakers to C2 and D2 buses. (AA CC2 - AB DD2)

(5) Remove control power from C2 and D2 brehkers.

(6) Verify that a makeup is available then trip & remove the close fuses from the HPI pump breaker.

a d. Auxiliary Feedpump Rooms

? -

(1) Verify open/open AF 388 & 360.

J (2) Verify open/open AF 3872 & 3870.

(3) Verify open/open FW 790 & 786.

(4) Verify AFP's are running.

(5) Verify closed /eloae SW 1382.

e. Report to the Auxiliary Shutdown Panel.
5. Reactor Operator 2 i a. Obtain flashifght and radio from the cabinet and proceed to the locations which ATT 4 directs,
b. Trips er opens the breakers on the following motor operated valves.

(1) AF 599 (2) MS 107 (3) RC 239A Verify open/open valve (4) RC 240B (5) CC $096 9 of 16

SERIOUS CONTROL ROOM FIRE AB-1203.26 GOP-OLC-001.00 Attachment 26 (6) CC 5098 (7) MS 107A (8) DH 7A (9) CC 1407B (10) CC 1411B ,

(11) AF 3869 (12) AF 608 (13) RC 11 Verify Closed /Close Valve (14) MU 2B Verify Closed /Close Valve (15) RC 240A Verify Open/Open Valve (16) CC 1411A Verify Open/Open Valve (17) CC 1407A Verify Open/Open Valve (18) MU 2A Close Valve (19) FW 612 (20) SW 1366 (21) HP 31 Verify Open/Open Valve (22) HP 32 Verify Open/Open Valve (23) DH 7B (24) DH 9B

c. Place all emergency control transfer switches to " LOCAL" on the following: <

(1) CD YF2 (2) CD F11A-1 (3) CD F11A-2 j i

10 of 16

SERIOUS CONTROL ROON FIRE AB-1203.26 GOP-OLC-001.00 Attachment 26 (4) CD F11B (5) CD EllE (6) CD E16B (7) CD E11B1 (8) CD E11B2 (9) CD E11C (10) CD EllA (11) CD YE2

d. Open the following valves:

(1) CC 43 (2) CC 1467 (Isolate Air)

(3) CC 1469 (Isolate Air)

(4) Verify Open/Open MS 106 & 107

e. Close the following valves:

(1) DW 66 (2) PW 29 (3) SW 328 (4) DW 3

f. Take manual control of the AVV's and maintain SG pressure as directed by the Shif t Supervisor.
6. Equipment Operator 1 a, Obtain flashlight, radio and tool kit from the cabinet and proceed to the location which Att. 5 directs.
b. Isolates seal injection flow. Details of actions are given in the
c. Isolates seal return flow. A.B.

I 11 of 16 l . _ . _ _ - - - . - -. .

l

. SERIOUS CONTROL ROOM FIRE AB-1203.26 GOP-OLC-001.00 Attachment 26

~'

d. Aligns NU pumps to recire. to BWST.
e. Controls makeup throttling MU 211.
f. Verifies running / starts both MU pumps. '
7. Equipment Operator 2
a. Obtain flashlight, radio and tool kit from the '

4 cabinet and proceed to the locations which Att.

6 directs.

b. Isolates nitrogen to the MSIV's. Details of actions are given in the
c. Positions or verifies positions of SW A.B.

valves to ensure:

(1) Flow to the CCW Hx.

(2) SW returns to the forebay.

4

d. Opecs CC 1460 CCW to MU pumps.
e. Bleedhydrogenfrommainbenerator.

, f. Stops the E30P.

I

g. Proceed to the ASP.
8. I & C Mechanic

, a. Obtain flashlight, radio, DVOM and tool kit from the cabinet and proceed to the locations whien Art. 8 directs, t

b. Lift the leads going to the Control Room for two (2) TH and two (2) TC RTD's.
c. Using the DVON measure the RTD resistance and l convert to a temperature reading.
9. Electricias
a. Proceed with the ASS and assist with the actions of Att. 2 and 13.

f.'

12 of 16

  • i SERIOUS CONTROL ROOM FikE AB-1203.26 GOP-OLC-001.00 Attachment 26
10. Shift Technical Advisor
a. Call Emergency Preparedness Supervisor to Obi (6 declare a Site Emergency and have all support personnel assemble.
b. Take the following reference material to the ASP.

(1) Mechanical P & ID's.

(2) Electrical P & ID's.

(3) Valve Location Book.

(4) Load Distribution Book.

(5) PP and EP/AB Procedure Books.

C. Initial and Final Plant Conditions

1. The plant is in Mode I cr 2 at the start.
2. The plant is taken to Mode 3 when the procedure Obj #2 is followed. Guidance is provided for Cooldewn to ,

Cold Shutdown, i

3. RCS heat removal is via the steam generators, Obi d4 auxiliary feedwater is supplying the SG's the AVV's are naintaining SG pressure, (TSAT-RCS terp)

Natural circulation is in progress.

4. Condition of selected plant systems,
s. Electrical Distribution '

(1) Non-essential 13.8 KV, 4.16 KV, and TP-2, TP-3 480 V buses have de-energized, The diesel generators are supplying the essential 4.16 KV and 480 V buses. The control power knife switches have been opened to A, B, C2 and D2 buses to prevent inadvertent operation of the breakers. All emergency control power transfer switches on C1, D1, El, and F1 have been placed in " LOCAL".

I 13 of 16

  • \

f g f I

e 1

., - SERIOUS CONTROL ROOM FIRE AB-1203.26 GOP-OLC-001.00 Attachment 26

b. Service Water (1) The Service Water System has been TP-4 aligned to supply the essential CCW, CTMT air coolers, and ECCS room coolers. The return line has been lined up to the
  • forebay. Service water has been isolated to AFP suctions, H2 dilution blowers, and TPCW heat exchangers. Power has been <,

removed from all necessary motor operated valves to prevent inadvertent operation.

c. Component Cooling Water f (1) The CCW System, is aligned with both TP-5 essential headers in service and side I also' supplying the non-essential lines.

The CCW to makeup pump is handjacked open.

The CTMT isolations have been de-energized open to provide RCP thermal barrier ani letdown coolers cooling, ,CCW to the DHR coolers is ensured by failing open CC-1407 and CC-1469 open. Power has been removed from all necessary motor operated valves to prevent inadvertent operation.

d.

?

Auxiliary Feedwater '

(1) The AFW System is in a normal SFRCS trip TP-6 lineup with each pump taking suction from the CST and feeding its own OTSG. Power has been removed from the isolation valves to prevent inadvertent operation. The pump speed is being controlled in manual from the Auxiliary Shutdown Panel. Care must be taken to transfer suction to service water when the CST is emptied.

e. Main Steam (1) The MSIV's have been closed by the SFRCS trip and are maintained closed by isolat-ing instrument air and nitrogen. The atmospheric vents will be used to control' OTSG pressure in manual control from their' handwheel.

14 of 16

\

\ _ __ __ ._. _ . _ _ . --

SERIOUS CONTROL ROOM FIRE AB-1203.26 GOP-OLC-001.00 Attachment 26

-f. Makeup / Letdown /RCS (1) The makeup pumps are aligned to take TP-7, TP-8, TP-9 suction from the BWST and discharge via the bypass to MU 32 into the RCS. The mini-recirc is realigned to the BWST to prevent filling the makeup tank. Seal injection has been isolated along with seal return. All demineralized water sources to the makeup system are isolated.

Power leads from the control room switches to the oil pumps have been cut to prevent loss of the oil pumps. RCS precsure is being monitored by a gage on the sample line from the pressurized. Letdown is isolated at MU 2B and MU 2A. The PORV has been isolated by closing the block valve.

Power has been removed from all necessary motor operated valves to prevent inadver-tent operation. These lineups will maintain the plant in a stable Hot Standby post trip condition until directed to cooldown when offsite support personnel arrive. The lineups assume no active failure of a component occurred prior to a preventive action being taken by the operator. If a failure has occurred, the operator must take appropriate corrective actions to restore the required lineup.

If the fire adversely affects the Makeup Pumps, such that RCS makeup via the Makeup System is not available. The LPI and HPI pumps may be "Piggvbacked" as outlined in Attachment 52 of AB 1203.02, " Serious Station Fire." Prior to starting the LPI pumps mini-recire, flow must be ensured by verifying CCW is available to the decay heat coolers.

5. The Emergency Action Level the plant is in at the: Obj #6
a. Start - Site Emergency
b. During - Site Emergency l

15 of 16 l

SERIOUS CONTROL ROOM FIRE AB-1203.26 GOP-OLC-001.00 Attachment 26

c. Completion - Site emergency or lower action level depending on plant conditions.

3.0

SUMMARY

A. Review Initial Conditions.

B. Review Operator Actions.

C. Review Final Plant Conditions.

, D. Review Emergency Action Levels.

4.0 EVALUATION A. Ask students to answer the objectives.

5.0 ASSIGNMENT A. None GOP-OLC-ATTACH. 26 16 of 16