ML20195G318

From kanterella
Revision as of 11:53, 9 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Submits Third Periodic Rept of Status of Followup & Closeout of Cprrg Recommendations.Reltaed Info Encl
ML20195G318
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/03/1988
From: Warnick R
NRC OFFICE OF SPECIAL PROJECTS
To: Charemagne Grimes
NRC OFFICE OF SPECIAL PROJECTS
Shared Package
ML20195G199 List:
References
FOIA-88-322 NUDOCS 8811230340
Download: ML20195G318 (8)


Text

-

lO

  • / m . '

,'o,, UNITED ST ATES NUCLEAR REGULATORY COMMISSION

!" g WASHINGTON. D. C. 20555 7 l

% ,,,,/ WR - 31988 MEMORANDUM FOR: C. I. Grimes, Director Comanche Peak Project Djvision Office of Special Projects FROM:

R. F. Warnick, Assistant Director for Inspection Program Comanche Peak Project Division Office of Special Projects

SUBJECT:

STATUS OF FOLLOW UP AND CLOSE OUT OF CPRRG RECOMMENDATIONS This is the third periodic report of the status of our follow up and close out of CPRRG recommendations. Enclosure 1 contains the status of recommendations duc, based on the original estimated completion date. Enclosure 2 lists the CPRRG recommendations not yet duc.

Twenty-one are closed. Six have been started but are not yet complete. Fourtoon have not been started.

Let me know if there are any questions.

8 Y lN &

R. F. Warnick, Assistant Director for Inspection Programs Comancho Peak Project Division Office of Special Projects

Enclosures:

1. Status of CPRRG recommendations that are due.
2. CPRRG recortinendations not yet due, cc W/enclosurcs:

PMcKee CWilliams NRC site staff

/

oan2aoa4o conoo / (s PDR FOIA PDR CONDITOO-322

Enclosure 1 ,

i CPRRG RECOMMENDATIONS THAT ARE DUE r

Estimated i Co'~ m p15 tion  ;

Lead i IDI Inspector Action ._,

Date Status _

FIRE PROTECTION ISSUES 45 Singh/ Verify adequacy of new November Closed in IR Kelley Bisco seal installation. 1987 50-445/87-22 See IR 50-445/85-16, 50-446/85-13, item 12.

50 Singh/ Reinspect Bisco fire seals November Closed in IR  ;

Kelley and certification docu- 1987 50-445/87-22 See IR 50-montation.

445/85-16, 50-446/87-13, item 12 & page 3-46.

CONSTRUCTION OA ISSUES 23 Williams verify that an adequace December This item is  !

quality control procedure 1987 being ins- l exists for QA inspectors to pected as witness the transfer of part of our l

, marking for material that onsite re-would otherwiso lose its view of all open ASME traceability when cut into smaller sections. issues. Com-pletion of this item is ['

expected in March 1988.  ;

'h December Closed in IR 24 Hale Review NEO procedures for adequacy of records system. 1987 50-445/87-32 50-446/87-24 paragraph 2.b 25 Hale Review NEO procedures for December Closed in IR adequacy of ANSI N45.2.9 1987 50-445/88-10; f i requirements. 50-446/88-08. t i

26 Halo Review NEO proceduros for December Closed in IR i adequacy of records ship- 1987 50-445/88-01 monts to contractors. 50-446/88-01 '

paragraph 3.b '

I

___ J

2 Enclosure 1 Estimated Completion Lead Status Inspector Action Date IDI CONSTRUCTION OA ISSUES (continued) 27 Hale Review NEO procedures for December Closed in IR adequacy of records ship- 1987 50-445/88-01 ping containers. 50-446/88-01 paragraph 3.b 28 Hale Review NEO procedures for December Closed in IR adequacy of backup records. 1987 50-445/88-01; 50-446/88-01 paragraph 3.b 29 Hale Review NEO procedures for December Closed in IR adequacy of records ship- 1987 50-445/88-01; ments accounting. 50-446/88-01 paragraph 3.b 30 Hale Review NEO procedures for December Closed in IR adequacy of records ship- 50-445/88-01; monts to contractors. 1987 50-446/88-01 paragraph 2.b above.

31 Hale Review NEO procedures for December Closed in IR adequacy of backup records. 1987 50-445/88-01; 50-446/88-01 paragraph 2.b 32 Hale Review NEO proceduros for December Closed in IR adequacy of records ship- 1987 50-445/88-01; mont accounting. 50-446/88-01 paragraph 2.b l 33 Hale Review NEO procedures for December Closed in IR

! adequacy of records 1987 50-445/88-10; storage. 50-446/88-08 34 Halo Review NEO procedures for December Closed in IR adequacy of records filing. 1987 50-445/88-10; 50-446/88-08 l

Closed in IR l 47 Hale Monitor applicants' re- December

! sponse to staff concerns 1987 50-445/87-32 raised in SSER 11 regard- 50-446/87-24 l ing their audit program, paragraph 2.a r

i particularly with respect l to RPV surveillance.

t

3 Enclosure 1 Estimated I, cad Completion Inspector ACTION Date Status ID1 CONSTRUCTION OA ISSUES (continued) t 59 phillips Review Operations Traveler December Inspection l criteria, control and 1987 started.

effectiveness. Scheduled for comple-tion in March 63 Williams verify adequate material December This item is identification and trace- 1987 being in-ability program for earlier spected as work or review procurement part of our and control program for the onsite re-bulk piping stock at CpSES. view of all open ASME issues. Com-pletion is expected in March 1988.

j 66 Wiebe Determine if the Regula- December Scheduled tory Gilide 1.97 QA commit- 1987 for March '

monts have been properly inspection.

implemented at CPSES.

67 Wiebe Review the adequacy of December Scheduled the licensee's program to 1987 for March ,

update permanent installa- inspection. l tion documentation when i components are changed or .

replaced.

69 McKee Emphasize safety signifi- December closed.

cance in all portinent 1987 l aspects of the licensee's  ;

QA Program.

CONCRETE RECORDS 48 Lyons/ Review statistical data December Closed in IR regarding uniformity of 1987 50-445/88-15; Runyan concrete and review larger 50-446/88-11 .

l sample of concrete compres-sion tests. l r

I i

1

4 Enclosure 1 Estimated Lead Completion IDt Inspector ACTION Date Status CDR AND-50.55(e) REPORTING 4 35 Phillips Audit the CDR program to January Closed in IR verify its adequacy. 1988 50-445/87-36 (Applicant should revise 50-446/87-27 Procedure NEO CS-1.) para.2.a.

36 Phillips Resolve conflicting TUEC January Closed in IR procedures for 50.55e re- 1988 50-445/87-36 porting. 50-446/87-27 para. 2.a.

37 Phillips Evaluate retrievable con- January Closed in IR dition of TUEC 50.55e files. 1988 50-445/87-36 50-446/87-27 para.2.b.

38 Phillips Evaluate TUEC for report- January Closed in IR ing 50.55e corrective 1988 50-445/87-36 actions. 50-446/87-27 para.2.c.

39 Phillips Evaluate auditable condi- January Closed in IR tion of TUEC 50.55e files. 1988 50-445/87-36 50-446/87-27 NAMCO SWITHCES (IEB 79-28) f 49 Phillips Notify TUEC of recommended February Inspection l actions and monitor resolu- 1988 started.

, tion in EQ CAP. Scheduled for completion in I March.

i 4

i

Enclosure 2 CPRRG RECCMMENDATIONS NOT YET DUE Estimated Lead Completion ID1 Inspector Action Date Status FPOOL PIECE COMPONENTS

, 51 Williams If CVCS spool piece March was not marked at the time 1988 of inspection, then addi-tional review would be warranted. Resolve uncer-tainty associated with when the spool piece was marked.

62 Williams Inspect other field- March fabricated spool pieces. 1988 4

COMPLETION OF CONSTRUCTION INSPECTION 52 Livermore Inspections included in May 1988 tne 1986 inspection pro-gram, but not completed at Unit 1, should be reviewed, and those determined to be necessary to confirm plant

. quality, should be accomp-lished.

73 Livermore Review the inspection pro- May 1988 gram for gaps caused by non-performance. Take appropriate action to close those gaps where there remains a clear i

benefit to plant quality.

i

~

2 Enclosure 2 Estimated Lead Completion ID# Inspector Action _

Date Status DISPOSITION OF NRC BULLETINS 40 Lyons Provide applicant with~ June 1988 i

~

clear and concise written evaluation of actions taken 1 to date and cpecify addi-tional actions required to close IEB 79-14.

41 Phillips Evaluate TUEC program for June 1988 Insp. started NRC Bulletin handling. in IR  !

50-445/87-36 .

50-446/87-27  ;

para.2.d. ,

42 Phillips Evaluate TUEC procedures June 1988 and process for NRC Billle- p tins.

43 Phillips Evaluate TUEC tracking- June 1988 Insp. started and assignment for NRC in IR Bulletins. 50-445/87-36 '

50-446/87-27 para.2.d.

44 Lyons Evaluate TUEC resolution June 1988 ,

of IEB 79-14.

72 Lyons Inspect TUEC resolution June 1988 ,

of IEB 79-14.  !

UNIT 2 RPV INSTALLATION  :

20 Lyons Perform a detailed review January I of Westinghouse's engin- 1989 j eering evaluation regarding translation of design cri-teria into installation specifications, procedures, i and drawings and failure to j control deviations regarding r Unit 2. I f

I

[

', I

J 3

  • Enclosure 2 Estimated Lead Completion Inspector Action Date Status ID1 ,

UNIT 2 RPV INSTALLATION (continuedl 21 Wiebe/ Perform a visual inspec- January williams tion of the accessible 1989 reactor vessel surroundings during or after hot func-tional test.

22 Lyons Perform a detailed review Januhry I

of Westinghouse's engin- 1989 cering evaluation of the failure to maintain tolerance for RV support brackets and shoes.

46 Livermore Evaluate traveler and NCR January procedures with respect 1989 to the Unit 2 RV support brackets and shoes.

60 Livermore Verify the adequacy of January Level I QC inspection 1989 of RPV installation. ,

61 Livermore Review the completeness of January i QC coverage and tech- 1989 (

nical acceptability of the ,

actual inspection criteria j for the installation of all the major NSSS components. [

l i

i j  !

i i I 1  !

1 i

I 4

b

, '/  %, UNITED STATES

! o NUCLEAR REGULATORY COMMISSION

'f .l W A SHING T O N, D. C. 20666

%,,,,./ W - 31988 MEMORANDUM FOR: C. I. Grimes, Director Comanche Peak Project Division Office of Special Projects FROM: R. F. Warnick, Assistant Director for Inspection Program Comanche Peak Project Division Office of Special Projects

SUBJECT:

STATUS OF FOLLOW UP AND CLOSE OUT OF CPRRG RECOMMENDATIONS This is the third periodic report of the status of our follow up and close out of CPRRG recommendations. Enclosure 1 contains the status of recommendations due, based on the original estimated completion date. Enclosure 2 lists the CPRRG recommendations not yet due.

Twenty-one are closed. Six have been started but are not yet complete. tce-f^H" sT een . have not been started.

Let me know if there are any questions.

8Fb R. F. Warnick, Assistant Director for Inspection Programs Comanche Peak Project Division Office of Special Projects

Enclosures:

1. Status of CPRRG recommendations that are due.
2. CPRRG recommendations not yet due, cc w/ enclosures:

PMcKee CWilliams NRC site staff

- / ,, ,

i

Enclosure 1 CPRRG RECOMMENDATIONS THAT ARE DUE Estimated Lead Completion IDD Inspector Action Date Status FIRE PROTECTION ISSUES 45 Singh/ Verify adequacy of new November Closed in IR Kelley Bisco seal installation. 1987 50-445/87-22 See IR 50-445/85-16, 50-446/85-13, item 12, 50 Singh/ Reinspect Bisco fire seals Ncvember Closed in IR Kelley and certification docu- 1937 50-445/87-22 montation. See IR 50-445/85-16, 50-446/87-13, item 12 & page 3-46.

CONSTRUCTION QA ISSUES i 23 Williams Verify that an adequate December This item is quality control procedure 1987 being ins- i exists for QA inspectors to pected as

witness the transfer of part of our i marking for material that onsite re-would otherwise lose its view of all traceability when cut into open ASME smaller sections. issues. Com-pletion of
this item is i expected in March 1988.

24 Halo Review NEO procedures for December Closed in IR adequacy of records system. 1987 50-445/87-32 50-446/87-24 paragraph 2.b 25 Halo Review NEO procedures for December Closed in IR <

adequacy of ANSI N45.2.9 1987 50-445/88-10 requirements. 4,6/g0g 26 Hale Rovicw NEO procedures for December Closed in IR

, adequacy of records ship- 1987 50-445/88-01 ,

monts to contractors. 50-446/88-01 l paragraph 3.b ;

1

2 Enclosure 1 Estimeted

-Lead Completion ids Inspector Action Date Status CONSTRUCTION OA ISSUES (continued) 27 Hale Review NEO procedures for December Closed in IR adequacy of records ship- 1987 50-445/88-01 ping containers. 50-446/88-01 paragraph 3.b 28 Hale Review NEO proceduros for December Closed in IR adequacy of backup records. 1987 50-445/88-01; ,

50-446/88-01 paragraph 3.b 29 Halo Review NEO procedures for December Closed in IR adequacy of records ship- 1987 50-445/88-01; ments accounting. 50-446/88-01 paragraph 3.b 30 Hale Review NEO procedures for December Closed in IR adequacy of records ship- 50-445/88-01; ments to contractors. 1987 50-446/88-01 paragraph 2.b 6

31 Hale Review NEO procedures for December Closed in IR adequacy of backup records. 1987 50-445/88-01; 50-446/88-01 paragraph 2.b 32 Halo Review NEO procedures for December Closed in IR adequacy of records ship- 1987 50-445/88-01; mont accounting. 50-446/88-01 paragraph 2.b  !

33 Hale Review NEO procedures for December Closed in IR adequacy of records 1987 50-445/88-10; storage. 50-446/88-08 perngrapk s.g 34 Hale Review NEO procedures for December Closed in IR adequacy of records filing. 1987 50-445/88-10; 50-446/88 Tsrsengrat.

47 Halo Monitor applicants' re- December Closed in IR sponse to staf" concerns 1987 50-445/87-32 raised in SSTR 11 regard- 50-446/87-24 ing their audit program, paragraph 2.a particularly with respect to RPV surveillance. l

- _ - - __.-_ _, ... - _ _ - . - - 1

,t l

Enclosure 1 Estimated Lead Completion IDI Inspector ACTION Date Status CONSTRUCTION OA ISSUES (continued) 59 Phillips Review Operations Traveler December Inspection criteria, control and 1987 started.  ;

effectiveness. Scheduled ,

for comple-tion in March  !

63 Williams Verify adequate material December This item is identification and trace- 1987 being in-ability program for earlier spected as work or review procurement part of our and control program for the onsite re- ,

belk piping stock at CPSES. View of all open ASME issues. Com-pletion is expected in March 1988.

66 Wiebe Determine if the Regula- December Scheduled tory Guide 1.97 QA commit- 1987 for March ments have been properly inspection. ,

implemented at CFSES. t 67 Wiebe Review the adequacy of December Scheduled the licensee's program to 1987 for March update permanent installa- inspection.

tion documentation when components are changed or replaced.

69 McKee Emphasize safety signifi- December closed. Me4**

cance in all pertinent 1987 hvashicarn f.

aspects of the licensee's Gri.*4.r AQ g/pty QA Program.

CONCRETE RECORDS 48 Lyons/ Review statistical data December Closed in IR Runyan regarding uniformity of 1987 50-445/88-15; concrete and review larger 50-446/88-11 sample of concrete compres- parayrgab 3 sion tests.

it .

4 i

Enclosure 1 s

Estimated Lead completion Inspector ACTION Date Status ID1 CDR AND 50.55(e) REPORTING 35 Phillips Audit the CDR program to January Closed in IR verify its adequacy. 1988 50-445/87-36 (Applicant should revise 50-446/87-27 Procedure NEO CS-1.) para.2.a.

36 Phillips Resolve conflicting TUEC January closed in IR procedures for 50.55e re- 1988 50-445/87-36 porting. 50-446/87-27 para. 2.a.

37 Phillips Evaluate retrievable con- January Closed in IR dition of TUEC 50.55e files. 1988 50-445/87-36 50-446/87-27 para.2.b.

38 Phillips Evaluate TUEC for report- January Closed in IR ing 50.55e corrective 1988 50-445/87-36 actions. 50-446/87-27 para.2.c.

39 Phillips Evaluate auditable condi- January Closed in IR tion of TUEC 50.55e files. 1988 50-445/87-36 50-446/87-27 para.2.c & e NAMCO SWITHCES (IEB 79-28)_

49 Phillips Notify TUEC of recommended February Inspection actions and monitor resolu- 1988 started.

tion in EQ CAP. Scheduled for coroplction in Mai*ch.

' O

- 4 9c ydr#

lfofiY

/ Enclosure 2 l

CPRRG RECOMMENDATIONS NOT /YET DUE Estimated Lead Completion IDI Inspector Action Date Status sf _,

[ SPOOL PIECE COMPONENTY

~~

l 51 Williams If CVCS spool piece March was not marked at the time 1988 of inspection, then addi- ,

tional review would be warranted. Resolve uncer-tainty associated with when the spool piece was marked. .

62 Williams Inspect other field- March fabricated spool pieces. 1988 COMPLETION OF CONSTRUCTION INSPECTION N t

52 Livermore Inspections included in May 1988

the 1986 inspection pro-1 gram, but not completed at i

Unit 1, should be reviewed, I and those determined to be

, necessary to confirm plant quality, should be accomp-j lished.

l 73 Livermore Review the inspection pro- May 1988 gram for gaps caused by non-  :

performance. Take appropriate action to close those gaps where there remainc a clear benefit to plant quality. ,

P

2 .

t Enclosure 2 Estimated Lead Ccmpletion gi Inspector Action Date Status DISPOSITION OF NRC BULLETINS 40 Lyons Provide applicant with June 1988 r

clear and concise written evaluation of acti*ns taken to date and specil, addi-tional actions required to close IEB 79-14. -

r 41 Phillips Evaluato TUEC program for June 1989 Insp. started NRC Bulletin handling. in IR 50-445/87-36 '

50-446/87-27 para.2.d. ,

42 Phillips Evaluate TUEC procedures June 1988 and process for NRC Bulle-tins. (

\'

43 Phillips Evaluate TUEC tracking June 1988 Insp. started  :

and assignment for NRC in IR Bulletins. 50-445/87-36 50-446/87-27 l

para.2.d.  :

t i 44 Lyons Evaluate TUEC resolution June 1988 i

, of IEB 79-14.

Inspect TUEC resolution June 1988 '

i 72 Lyor.s l of IEB 79-14.  !

UNIT 2 RPV INSTALLATION

~

i  !

l 20 Lyons Perform a detailed review January l of Westinghouse's engin- 1989 i j eering evaluation regardino translation of design cri-  ;

! teria into installation i specifications, procedures, (

l and drawings and failure to l control deviations regarding i

Unit 2.

l ,

I

',4 ,.

3 Enclosure 2 Estimated Lead Completion IDI Inspector Action Date Status ,

UNIT 2 RPV INSTALLATION continued) 21 Wiebe/ Pe r '. ( a a visual inspec- January Williams tior, the accessible 1989 reactc; vessel surroundings during or after hot func-tional test.

22 Lyons Perform a detailed revjew January of Westinghouse's engin- 1989 -

coring evaluation of the failure to maintain tolerance for RV su"port brackets and shoes.

46 Livermore Evaluate traveler and NCR January procedures with respect 1989 to the Unit 2 RV support ,

brackets and shoes. l 60 Livermore Verify the adequacy of January l Level I QC inspection 1989 ,

of RPV installation. ,

61 Livermore Review the completeness of January QC coverage and tech- 1989 nical acceptability of the -

cetual inspection criteria for the installation of all the major NSSS components.

1 i

p

- - - - - -.