IR 05000425/1987013
| ML20209F110 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 04/17/1987 |
| From: | Julian C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | James O'Reilly GEORGIA POWER CO. |
| Shared Package | |
| ML17198A315 | List: |
| References | |
| NUDOCS 8704300201 | |
| Download: ML20209F110 (3) | |
Text
~'- - ,
n
_
4 ()- cQ April 17, 1987 Docket No. 50-425 License Nos..CPPR-109 Georgia Power Company
! ATTN: Mr. James P. O'Reilly
-Senior Vice President-
- Nuclear Operations P. O. Box 4545 Atlanta, GA 30302 Gentlemen
SUBJECT: NRC INSPECTION REPORT N0. 50-425/87-13
,
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by R. W. Wright on March 9-13, 1987. The inspection included a review of activities authorized for your Vogtle facilit At the conclusion of the
- inspection, the findings were discussed with those members of your staff identified in the enclosed inspection report.
i Areas examined during .the inspection are identified in the report. Within
- these areas, the inspection consisted of selective examinations of procedures and ~ representative records, interviews with personnel, and observation of activities in progress.
- Within the scope of the inspection, no violations or deviations were
,
identified.
! In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure j will be placed in the NRC Public Document Roo Should you have any questions concerning this letter, please contact us.
.
Sincerely,
'
(Original signed by C. Julian)
Caudle A. Julian, Chief Operations Branch
Division of Reactor Safety Enclosure:
NRC Inspection Report cc w/ encl: (See page 2)
8704300201 870417 5 PDR ADOCK 0500 a
il l . zha
.. . . _ _ - - _. . __ . - . _ . _ _ _ _ _ _ _ _
.
Georgia Power Company 2 April 17, 1987 cp w/ encl:
V R. E. Conway, Senior Vice President &
Project Director d Whitney, General Manager Project d. Support D. Rice, Vice President, Project Engineering d H. Pinson, Vice President, Project d. Construction W. Hayes, Vogtle Quality JssuranceManager 541. B. Bockhold, General Manager, ,
Nuclear Operations vf. Gucwa, Manager, Nuclear Safety and Licensing 4. A. Bailey, Project Licensing d. Manager W. Churchill, Esq., Shaw, Pittman, Potts and Trowbridge
&tT. E. Joiner, Troutman, Sanders, VI.LockermanandAshmore G. Ledbetter, Commissioner, d.DepartmentofHumanResources H. Badger, Office of Planning nd Budget
. Kirkland, III, Counsel, Office of the Consumer's Utility ouncil
. Feig, Georgians Against uclear Energy
. B. Margulies, Esq., Chairman, Atomic Safety and Licensing Board H. Paris, Administrative Judge Atcmic Safety and Licensing Board d. Panel A. Linenberger, Jr., Administrative Judge Atomic Safety and Licensing Board Panel bec w/ encl: (See page 3)
)
.
..
Georgia Power Company 3 April 17, 1987
'
w/ encl:
Reis, 0GC M. Hill, IE
, Miller NRR W. Brach, EDO M. Sinkule, RII E. Christnot, RII v1GC Resident Inspector Document Control Desk State of Georgia
,
RII RII RII RII
&fhlv 3g LMoor}e(jj v GBeiisle iJL,0V RWright:tj MSinkule 4/! /87 0 4/g/87 4//v/87 4/g/87
_
.- . . - - - . . - - _ . _ - ._...- -. . , . . . . . - .. >