IR 05000425/1987013

From kanterella
Revision as of 08:09, 5 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-425/87-13 on 870309-13.No Violations or Deviations Noted
ML20209F110
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 04/17/1987
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James O'Reilly
GEORGIA POWER CO.
Shared Package
ML17198A315 List:
References
NUDOCS 8704300201
Download: ML20209F110 (3)


Text

~'- - ,

n

_

4 ()- cQ April 17, 1987 Docket No. 50-425 License Nos..CPPR-109 Georgia Power Company

! ATTN: Mr. James P. O'Reilly

-Senior Vice President-

Nuclear Operations P. O. Box 4545 Atlanta, GA 30302 Gentlemen

SUBJECT: NRC INSPECTION REPORT N0. 50-425/87-13

,

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by R. W. Wright on March 9-13, 1987. The inspection included a review of activities authorized for your Vogtle facilit At the conclusion of the

inspection, the findings were discussed with those members of your staff identified in the enclosed inspection report.

i Areas examined during .the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures and ~ representative records, interviews with personnel, and observation of activities in progress.
Within the scope of the inspection, no violations or deviations were

,

identified.

! In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure j will be placed in the NRC Public Document Roo Should you have any questions concerning this letter, please contact us.

.

Sincerely,

'

(Original signed by C. Julian)

Caudle A. Julian, Chief Operations Branch

Division of Reactor Safety Enclosure:

NRC Inspection Report cc w/ encl: (See page 2)

8704300201 870417 5 PDR ADOCK 0500 a

il l . zha

.. . . _ _ - - _. . __ . - . _ . _ _ _ _ _ _ _ _

.

Georgia Power Company 2 April 17, 1987 cp w/ encl:

V R. E. Conway, Senior Vice President &

Project Director d Whitney, General Manager Project d. Support D. Rice, Vice President, Project Engineering d H. Pinson, Vice President, Project d. Construction W. Hayes, Vogtle Quality JssuranceManager 541. B. Bockhold, General Manager, ,

Nuclear Operations vf. Gucwa, Manager, Nuclear Safety and Licensing 4. A. Bailey, Project Licensing d. Manager W. Churchill, Esq., Shaw, Pittman, Potts and Trowbridge

&tT. E. Joiner, Troutman, Sanders, VI.LockermanandAshmore G. Ledbetter, Commissioner, d.DepartmentofHumanResources H. Badger, Office of Planning nd Budget

. Kirkland, III, Counsel, Office of the Consumer's Utility ouncil

. Feig, Georgians Against uclear Energy

. B. Margulies, Esq., Chairman, Atomic Safety and Licensing Board H. Paris, Administrative Judge Atcmic Safety and Licensing Board d. Panel A. Linenberger, Jr., Administrative Judge Atomic Safety and Licensing Board Panel bec w/ encl: (See page 3)

)

.

..

Georgia Power Company 3 April 17, 1987

'

w/ encl:

Reis, 0GC M. Hill, IE

, Miller NRR W. Brach, EDO M. Sinkule, RII E. Christnot, RII v1GC Resident Inspector Document Control Desk State of Georgia

,

RII RII RII RII

&fhlv 3g LMoor}e(jj v GBeiisle iJL,0V RWright:tj MSinkule 4/! /87 0 4/g/87 4//v/87 4/g/87

_

.- . . - - - . . - - _ . _ - ._...- -. . , . . . . . - .. >