ML20210D321

From kanterella
Revision as of 11:33, 4 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603
ML20210D321
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/21/1999
From: Terry C, Walker R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AL-99-02, TXX-99181, NUDOCS 9907270194
Download: ML20210D321 (2)


Text

1 l

.j .*

==

I ~; Log # TXX-99181

=

=-

File # 10121 Ref. # AL 99-02 1UELECTRIC i

c.Immee nrry i senior we, emu,as July 21,1999

& PrincipalNuclear Officer U. S. Nuclear Regulatory Commission Attn: Document Control Desk ,

Washington, DC 20555 l

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) '

DOCKET NOS. 50-445 AND 50-446 OPERATING REACTOR LICENSING ACTION ESTIMATE REF: NRC Administrative Letter 99-02: Operating Reactor Licensing Action Estimates from David B. Matthews to all power reactor licensees dated June 3,1999 Gentlemen:

In accordance with the request in the referenced letter, the following estimate of licensing actions is provided:

Six licensing actions are estimated for FY 2000:

Elimination of response time testing for SSPS, Process Instrumentation and auxiliary relays

. Increase surveillance testing interval for the SSPS slave relays

. Altemate repair criteria for Steam Generator tubes (Laser Welded Sleeves)

. Relaxation of RPS/ESF Completion Times based on WCAP 14333

. Package of approved industry generic travelers not yet incorporated in CPSES ITS

. Generic Letter 99-02 requested change to Surveillarice Requirements on ESF Charcoal Samples I

\

p\ 1)  :

9907270194 990721 I PDR ADOCK 05000445 1 i P PDR .

)

l f

i j COMANCllE PEAK SILAM ELECT RIC STATION P.O. Box 1002 Glen Rose, Texas 76043-1002 l

g.-

. at a

TXX-98181' Page 2 oi2 This communication contains no new licensing basis commitments regarding CPSES Units 1 and 2.

Sincerely, k h.

C. L. Terry By: ke4A+

  • Roger'D. Walker Regulatory Affairs Manager DEB /db c- E. W. Merschoff, Region IV J. l. Tapia, Region IV D. H. Jaffe, NRR Resident inspectors, CPSES Michael L. Boyle, NRR, Mail Stop O-13E4 4

i i

I