ML20210R896

From kanterella
Revision as of 02:46, 3 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 70-1257/99-02 on 990712-16.No Violations Noted.Insp Consisted of Selective Exam of Procedures & Representatives Records,Interviews with Personnel & Observation of Activities in Progress
ML20210R896
Person / Time
Site: Framatome ANP Richland
Issue date: 08/12/1999
From: Chamberlain D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Femreite B
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
Shared Package
ML20210R902 List:
References
70-1257-99-02, NUDOCS 9908170251
Download: ML20210R896 (4)


Text

'

h.

p g"*%y UNITED STATES I g k NUCLEAR REGULATORY COMMISSION REGION IV

$ ,E h, [ 611 RYAN PLAZA DRIVE, sulTE 400 ARUNGToN, TEXAS 76011-8064 gj August 12, 1999 B. N. Femreite, Vice President Manufacturing Siemens Power Corporation 2101 Horn Rapids Road Richland, Washington 99352

SUBJECT:

NRC INSPECTION REPORT 70-1257/99-02

Dear Mr. Femreite:

On July 16,1999, the NRC completed a routine inspection at your Siemens Power Corporation facility in Richland, Washington. The purpose of the inspection was to determine whether activities authorized by your license were conducted safely and in acccrdance with NRC requirements.

Areas examined during the inspection were operational safety, waste management programs and environmental protection. Within these areas, the inspection consisted of a selective j examination of procedures and representative records, interviews with personnel, and {

observation of activities in progress. No violations were identified during the inspection.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its enclosure and your respcose will be placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, please contact D. Blair Spitzberg at (817) 860-8191 or Wayne Britz at (817) 860-8194.

Sincerely, -

Dwig t D. Chamberlain, Director Division of Nuclear Materials Safety ._

Docket Nos.: 70-1257 Ucense No.: SNM-1227

Enclosure:

NRC Inspection Report 70-1257/99-02 9900170251 990812 PDR ADOCK 0700 2 7 C

t /

g.

l Siemens Power Corporation cc w/ enclosure:

L. J. Maas, Manager Regulatory Compliance 1- Siemens Power Corporation 2101 Horn Rapids Road Richland, Washington 99352 Washington Radiation Control Program Director O

s.

, a f'

1 Siemens Power Corporation E-Mail report to Document Control Desk (DOCDESK) cbec w/ enclosure to DCD (IE07) ; f bec w/ enclosure distribution by RIV:

EWMerschoff DDChamberlain LLHowell DBSpitzberg EMcAlpine, Ril PLHiland, Rlli GFSanborn, RIV GMVasquez, RIV CWEmelgh, FCLB/NMSS (8D3)

PWLain, FCLB/NMSS (8D9)

PTing, FCOB/NMSS (8A13)

PHarich, FCOB/NMSS (8A33)

W L Britz MIS System FCDB RIV Materials Docket File i

l 4

i

\

DOCUMENT NAME: Draft: S:\dnms\fcdb\wlb\90125702.wpd Final:R:\ DNMS *= \

To receive copy of document, indicate in bar: "C" = Copy without enclosures *E" = Copy with enclosures 'N' = No copy \

RIV:DNMS:FCDB _

C:DNMS D:DNMS4Mf)

WL Britrems 77f5S- & DBSpitzberg MTI DDCharM6flain 8/7 /99 8/5~/99 849/99 OFFICIAL RECORD COPY ,

i l

l 170069

, 1 Siemens Power Corporation E-Mail report to Document Control Desk (DOCDESK) bec w/ enclosure to DCD (IE07) bec w/ enclosure distribution by RIV:

EWMerschoff DDChamberlain LLHowell DBSpitzberg EMcAlpine, Ril PLHiland, Rlli GFSanborn, RIV GMVasquez, RIV CWEmeigh, FCLB/NMSS (8D3)

PWLain, FCLB/NMSS (8D9)

PTing, FCOB/NMSS (8A13)

PHarich, FCOB/NMSS (8A33)

W L Britz MIS System ,

FCDB  !

RIV Materials Docket File {

DOCUMENT NAME: Draft: S:\dnms\fedb\wlb\90125702.wpd Final: R:\_DNMS To receive copy of document, Indicate in box: 'C' = Copy without enclosures *E* = Copy with enclosures *N' = No copy RIV:DNMS:FCDB _ l C:DNMS l D:DNMS/)CD WLBritz: cms 77f3S- & DBSpitzberg MTI DDCharM6flain 8/'I/99 8/f/99 849/99 OFFICIAL RECORD COPY .

a