ML20211B910
| ML20211B910 | |
| Person / Time | |
|---|---|
| Site: | Framatome ANP Richland |
| Issue date: | 08/19/1999 |
| From: | Ting P NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Femreite B SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER |
| Shared Package | |
| ML20211B918 | List: |
| References | |
| 70-1257-99-202, NUDOCS 9908250122 | |
| Download: ML20211B910 (2) | |
Text
'
~
Mr. B. N. Femreite Vice President of Manufacturing August 19, 1999 Siemens Power Corporation 2101 IIorn Rapids Road P.O. Box 130 Richland, WA 99352-0130
SUBJECT:
INSPECTION REPORT NO. 70-1257/99-202
Dear Mr. Femreite:
1 The Nuclear Regulatory Commission (NRC) conducted a routine, announced inspection of your facility's criticality safety program from August 2 - 5,1999. The enclosed report presents the results of that inspection. At the conclusion of the inspection, the findings were discussed with those members of your staffidentified in the report.
Within the areas examined, the inspection consisted of selective examinations of procedures and representative records, interviews with plant personnel, and observation of activities in progress.
Within the scope of this inspection, no violations were identified.
In accordance with the requirements of 10 CFR 2.790, a copy of this letter and its enclosure will be placed in the NRC Public Document Room. Should you have any questions concerning this inspection, please contact me at (301) 415-7156.
Sincerely, Original /s/
Philip Ting, Chief Operations Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket No. 70-1257 License No. SNM-1227 cc w/ enclosure: L. J. Maas, Manager Regulatory Compliance, Siemens gg John L. Erickson, Director gf Division of Radiation Protection Washington Department of Health pbOD j
DISTRIBUTION:
l NRC File Center CEmeigh, FLIB BSpitzberg, RIV Docket File 70-1257 NMSS r/f A. Norris, PMDA (w/o ene.)
PDR, LPDR FCSS r/f MMessier, T-9E10 (w/o ene.)
u 0082 FCOB r/f Plain, FLIB Case File aMSiemens disk) 99202C.WPD JC FCOB, b FCOB E
FCOB d
FLIB 6
FCOB FCOB E
DMoreyhM\\ SBurrodkk JSmithhlV WSchwink PTi g /
NAME PH[
mw DATE 7/lY/99
[/d/99
%/fh/99 7/h/989
,/
/99 f//f /99
/
/99 C = COVER E = COVER & ENCLOSURE N = NO COPY 9908250122 990819
~ ~IAL RECORD COPY PDR ADOCK 07C01257 C
PDR 1
~.
pa at0o9 y.
UNITED STATES 2
S NUCLEAR REGULATORY COMMISSION If WASHINGTON, D.C. 20555 4001
\\,**.,*/
August 19, 1999 Mr. B. N. Femreite Vice President of Manufacturing Siemens Power Corporation 2101 IIorn Rapids Road P.O. Box 130 Richland, WA 99352-0130
SUBJECT:
INSPECTION REPORT NO. 70-1257/99-202
Dear Mr. Femreite:
The Nuclear Regulatory Commission (NRC) conducted a routine, announced inspection of your facility's criticality safety program from August 2 - 5,1999. The enclosed report presents the results of that inspection. At the conclusion of the inspection, the findings were discussed with
- hose members of your staffidentified in the report.
Within the areas examined, the inspection consisted of selective examinations of procedures and representative records, interviews with plant personnel, and observation of activities in progress.
Within the scope of this inspection, no violations were identified.
In accordance with the requirements of 10 CFR 2.790, a copy of this letter and its enclosure will be placed in the NRC Public Document Room. Should you have any questions concerning this inspection, please contact me at (301) 415-7156.
Sincerel Philip 'ing, Chi)ef Operations Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket No. 70-1257 License No. SNM-1227 cc w/ enclosure: L. J. Maas Manager Regulatory Compliance, Siemens John L. Erickson, Director Division of Radiation Protection Washington Department ofIlealth