L-21-078, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G
From kanterella
Letter Sequence Request | |
---|---|
EPID:L-2021-LLE-0052, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G (Open) | |
Administration Questions
| |
MONTHYEARL-21-078, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2021-07-0606 July 2021
[Table View]Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G Project stage: Request ML21323A0702021-11-19019 November 2021 Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Project stage: Request ML21323A1082021-11-19019 November 2021 LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G Project stage: Request ML21355A2112021-12-21021 December 2021 Investigation Report of LLRW Shipment Pursuant to 10 CFR 20, Appendix G Project stage: Request ML22013A7062022-01-13013 January 2022 Investigation Report of LLRW Shipment Pursuant to 10 CFR 20, Appendix G Project stage: Request ML21356B4972022-02-14014 February 2022 Enclosure - Indian Point Exemption Request 10 CFR Part 20 Appendix G Project stage: Other ML21356B4952022-02-14014 February 2022 Exemption Request 10 CFR Part 20 Appendix G Project stage: Request ML21356B4962022-02-14014 February 2022 Letter - Indian Point Exemption Request 10 CFR Part 20 Appendix G Project stage: Other ML21356B4982022-02-14014 February 2022 FRN - Indian Point Exemption Request 10 CFR Part 20 Appendix G Project stage: Other 2021-07-06 |
ML21187A200 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 07/06/2021 |
From: | Sterdis A Holtec Decommissioning International |
To: | David Lew Document Control Desk, Office of Nuclear Material Safety and Safeguards, NRC Region 1 |
References | |
HDI-PIL-21-078 | |
Download: ML21187A200 (7) | |
Similar Documents at Pilgrim | |
---|---|
Category:Letter type:L
MONTHYEARL-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024
[Table view]HDI Annual Occupational Radiation Exposure Data Reports - 2023 L-24-010, Request for Preapplication Readiness Assessment of the Draft License Termination Plan2024-04-22022 April 2024 Request for Preapplication Readiness Assessment of the Draft License Termination Plan L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) L-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point L-23-011, 10 CFR 72.48 Biennial Change Summary Report2023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report L-23-008, Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI)2023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI) L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension L-22-036, Decommissioning Trust Fund Agreement2022-11-0808 November 2022 Decommissioning Trust Fund Agreement L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. L-21-134, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations2021-12-17017 December 2021 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations L-21-130, Registration of Casks to Store Spent Fuel and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2021-12-14014 December 2021 Registration of Casks to Store Spent Fuel and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool L-21-125, Registration of Casks to Store Spent Fuel2021-12-0101 December 2021 Registration of Casks to Store Spent Fuel L-21-118, Changes to Signature Authority & Addressee for Holtec Decommissioning International, LLC Correspondence Re to Oyster Creek Nuclear Generating Station, Pilgrim Nuclear Power Station, Indian Point Nuclear Generating Units 1, 2, 3, & Palisades2021-11-0909 November 2021 Changes to Signature Authority & Addressee for Holtec Decommissioning International, LLC Correspondence Re to Oyster Creek Nuclear Generating Station, Pilgrim Nuclear Power Station, Indian Point Nuclear Generating Units 1, 2, 3, & Palisades L-21-114, Registration of Casks to Store Spent Fuel2021-11-0404 November 2021 Registration of Casks to Store Spent Fuel L-21-107, Registration of Casks to Store Spent Fuel2021-10-0404 October 2021 Registration of Casks to Store Spent Fuel L-21-098, Response to Request for Additional Information (RAI) - License Amendment Request to Approve the Pilgrim Nuclear Power Station Independent Fuel Storage Installation Only Emergency Plan2021-09-0707 September 2021 Response to Request for Additional Information (RAI) - License Amendment Request to Approve the Pilgrim Nuclear Power Station Independent Fuel Storage Installation Only Emergency Plan L-21-055, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E2021-08-30030 August 2021 Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E L-21-088, Registration of Casks to Store Spent Fuel2021-08-0404 August 2021 Registration of Casks to Store Spent Fuel L-21-073, Decommissioning International - Fuel Storage Cask Certificate Number: 1014 - Registration of Changes to Previously Loaded Casks2021-08-0404 August 2021 Decommissioning International - Fuel Storage Cask Certificate Number: 1014 - Registration of Changes to Previously Loaded Casks L-21-090, Response to Request for Additional Information (Rai), License Amendment Request to Approve the Pilgrim Nuclear Power Station Independent Fuel Storage Installation Only Emergency Plan2021-07-29029 July 2021 Response to Request for Additional Information (Rai), License Amendment Request to Approve the Pilgrim Nuclear Power Station Independent Fuel Storage Installation Only Emergency Plan L-21-086, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2021-07-22022 July 2021 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G L-21-078, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2021-07-0606 July 2021 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G L-21-072, Supplemental Information to Support Proposed Independent Spent Fuel Storage Installation- Only Security, Training, and Qualification, Safeguards Contingency Plan2021-06-22022 June 2021 Supplemental Information to Support Proposed Independent Spent Fuel Storage Installation- Only Security, Training, and Qualification, Safeguards Contingency Plan L-21-057, Supplemental Information to Update - License Amendment Request to Approve the Pilgrim Nuclear Power Station Independent Fuel Storage Installation Only Emergency Plan2021-05-20020 May 2021 Supplemental Information to Update - License Amendment Request to Approve the Pilgrim Nuclear Power Station Independent Fuel Storage Installation Only Emergency Plan L-21-048, Annual Report of Individual Monitoring of Radiation Exposure for CY20202021-04-27027 April 2021 Annual Report of Individual Monitoring of Radiation Exposure for CY2020 L-21-038, Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2021-04-0101 April 2021 Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) L-21-037, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2021-03-31031 March 2021 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations L-21-036, Proposed Independent Spent Fuel Storage Installation-Only Security, Training and Qualification, Safeguards Contingency Plan2021-03-17017 March 2021 Proposed Independent Spent Fuel Storage Installation-Only Security, Training and Qualification, Safeguards Contingency Plan L-21-008, License Amendment Request to Approve Pilgrim Nuclear Power Station Independent Spent Fuel Storage Installation Only Emergency Plan2021-02-18018 February 2021 License Amendment Request to Approve Pilgrim Nuclear Power Station Independent Spent Fuel Storage Installation Only Emergency Plan L-20-098, and Oyster Creek Nuclear Generating Station, 10 CFR 140.15 Proof of Financial Protection2020-12-30030 December 2020 and Oyster Creek Nuclear Generating Station, 10 CFR 140.15 Proof of Financial Protection L-20-080, Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-20020 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic L-20-019, Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 02020-08-27027 August 2020 Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 L-20-057, Registration of Use of Cask to Store Spent Fuel2020-08-17017 August 2020 Registration of Use of Cask to Store Spent Fuel L-20-048, Physical Security, Training & Qualification and Safeguards Contingency Plan, Revision 192020-07-21021 July 2020 Physical Security, Training & Qualification and Safeguards Contingency Plan, Revision 19 L-20-029, Response to NRC Request for Clarifying Information2020-04-22022 April 2020 Response to NRC Request for Clarifying Information L-20-022, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2020-04-0101 April 2020 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) L-20-023, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2020-03-31031 March 2020 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations L-20-017, Annual Report of Individual Monitoring of Radiation Exposure for 20192020-02-27027 February 2020 Annual Report of Individual Monitoring of Radiation Exposure for 2019 L-19-021, Holtec Decommissioning International (Hdi) Response to Confirmatory Order EA-17-132/EA-17-1532019-12-31031 December 2019 Holtec Decommissioning International (Hdi) Response to Confirmatory Order EA-17-132/EA-17-153 L-19-020, Oyster Creek Nuclear Generating Station - 10 CFR 140.15 Proof of Financial Protection2019-12-27027 December 2019 Oyster Creek Nuclear Generating Station - 10 CFR 140.15 Proof of Financial Protection L-19-003, (PNPS) - Transmittal of Revision to 10 CFR 50.54(q) Review for EP-PP-01, PNPS Emergency Plan Revision 512019-10-16016 October 2019 (PNPS) - Transmittal of Revision to 10 CFR 50.54(q) Review for EP-PP-01, PNPS Emergency Plan Revision 51 L-2018-064, Submittal of Joint Composite Adversary Force2018-03-0808 March 2018 Submittal of Joint Composite Adversary Force L-06-002, Correction to Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power2008-07-24024 July 2008 Correction to Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power 2024-04-29 Category:Report MONTHYEARL-21-078, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2021-07-0606 July 2021
[Table view]Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML18158A1332018-06-0606 June 2018 Extent of Condition Review in Response to Findings Associated with Inspection 95003: Evaluation of NRC Assessment and Inspection Processes at Pilgrim Nuclear Power Station ML19056A1932017-08-17017 August 2017 Attachment 2 Design Input Record ML17212A5712017-07-28028 July 2017 Recovery Plan ML16153A3722016-06-20020 June 2016 Final ASP Analysis Pilgrim (LER 293-15-001) ML15043A7542015-03-24024 March 2015 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 1 of Order EA-13-109 (Severe Accident Capable Hardened Vents) ML15075A0822015-03-12012 March 2015 Entergy'S Required Response of the Near-Term Task Force Recommendation 2.1: Flooding-Hazard Reevaluation Report ML14294A5912014-11-0404 November 2014 Final ASP Analysis - Pilgrim Nuclear Power Station (LER 293-13-009) ML14171A2002014-06-26026 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (MF0264) ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML14324A0402014-04-17017 April 2014 HI-2104715, Seismic Analysis of the Loaded HI-TRAC in the SFP and SFP Slab Qualification. ML14092A0232014-03-31031 March 2014 Entergy'S Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima... ML13338A6672013-12-0909 December 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Pilgrim Nuclear Power Station, TAC No.: MF0777 ML13232A1322013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C85 of C413 Through Page C173 of C413 ML13232A1342013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C174 of C413 Through Page C250 of C413 ML13232A1352013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C251 of C413 Through Page C331 of C413 ML13232A1372013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C332 of C413 Through Page C413 of C413 ML13232A1382013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment D, Page D1 of D127 Through Page D73 of D127 ML13232A1402013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment D, Page D74 of D127 Through Attachment H, Page H12 of H12 ML13232A1412013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment I, Page I1 of I9 Through Attachment J, Page J77 of J134 ML13232A1312013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C1 of C413 Through Page C84 of C413 ML13232A1302013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment a Through Attachment B ML13232A1292013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment J, Page J78 of J134 Through End ML13232A1282013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page 37 of 37 ML12342A3862012-12-0606 December 2012 Fifth Ten-Year Inservice Testing Program and Request for Approval of IST Relief Requests, PR-03 and PR-05 ML12333A3212012-11-27027 November 2012 Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10CFR50.54(f) the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML12160A3712012-06-11011 June 2012 Review of 60-Day Response to Request for Information Regarding Recommendation 9.3, of the Near-Term Task Force Related to Fukushima Daiichi Nuclear Plant Accident ML13196A1892012-04-12012 April 2012 Email from B. Balsam, NRR to J. Crocker, NOAA Pilgrim: NRC Complete Responses to 4-9-12 NMFS Questions ML13196A2362012-04-12012 April 2012 Email from M. Smith, OGC to S. Uttal OGC Et Al., on Additional Pilgrim Exhibits ML12047A1192012-02-29029 February 2012 Request to Include Atlantic Sturgeon in Ongoing Informal Section 7 Consultation for Pilgrim Nuclear Power Station ML1204403512012-02-27027 February 2012 Acknowledgement of Withdrawal and Results of Acceptance Review Proposed License Amendment Request for Rod Withdrawal Minimizer Bypass Allowance to Allow Reactor Startup ML11346A5682011-12-0909 December 2011 Report Entitled - Regulatory Meltdown: How Four Nuclear Regulatory Commissioners Conspired to Delay and Weaken Nuclear Reactor Safety in the Wake of Fukushima ML1127000692011-09-26026 September 2011 Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants ML14086A5022011-06-13013 June 2011 Enclosure 1 to PNPS Letter 2.14.027 - Entergy Nuclear Engineering Report No. PNPS-RPT-11-00001, Re-assessment of Pilgrim Seismic Core Damage Frequency ML1104203062011-01-31031 January 2011 GE Hitachi Nuclear Energy Report, NEDC-33532, Revision 2, Pilgrim Nuclear Power Station Safety Valve Setpoint Increase, Enclosure 4 to 2.11.007 ML1007704512010-03-31031 March 2010 NEDO-33532, Rev 0, Pilgrim Nuclear Power Station Safety Valve Setpoint Increase. ML1019004142009-03-12012 March 2009 Condition Report, CR-PNP-2009-00879 ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 ML0712300162007-05-0202 May 2007 FSEIS Reference - Nonradioactive Waste Information ML0712102522007-04-21021 April 2007 Weld Filler and Welding Electrode Materials for Structural Weld Overlays within the Scope of Pilgrim Relief Request, PRR-15 ML0711303842007-04-10010 April 2007 GE-NE-0000-0066-0380-R1-NP, Pilgrim Nuclear Power Station, Torsion Arm Clamp Stress Evaluation Report. ML0710802222007-04-10010 April 2007 Repair of the Core Shroud Stabilizer Assemblies - Torsion Arm Clamp Stress Evaluation Report ML0708701322007-03-22022 March 2007 Request for Authorization Under the Provision of 10 CFR 50.55a(a)(3)(i) for Modification of the Core Shroud Stabilizer Assemblies ML0708701342007-03-21021 March 2007 GE-NE-000-0064-9392-R2-NP, Pilgrim Unit 1, IGSCC Assessment of Shroud Repair X-750 Component Other than the Replacement Upper Support Assembly and Tie Rod Nut. ML0709303132007-03-14014 March 2007 GE-NE-0000-0061-6306-R4-NP, Pilgrim Nuclear Power Station, Shroud Repair Replacement Upper Support Assembly-Stress Analysis Report. ENOC-07-00002, Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 20062007-02-28028 February 2007 Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 2006 ML0629104322006-11-17017 November 2006 Final Response to Task Interface Agreement 2006-01 Related to the Adequacy of Emergency Diesel Generator and Shutdown Transformer Load Testing at Pilgrim Nuclear Power Station ML0634804022006-11-0606 November 2006 E-MAIL: (PD) Fwd: Entergy Nuclear Cultural Resources Protection Plan ML0707901202006-10-0606 October 2006 CR-PNP-2006-03702, an Issue Was Raised During the Region I Inspection for License Renewal Regarding the Expected Service Life of a Protective Coating for Buried Piping ML0707901152006-10-0404 October 2006 CR-PNP-2006-03677, Controls to Prevent and Monitor for Corrosion of the Drywell Shell Need to Be Assessed and Strengthened 2021-07-06 Category:Miscellaneous MONTHYEARL-21-078, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2021-07-0606 July 2021
[Table view]Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML18158A1332018-06-0606 June 2018 Extent of Condition Review in Response to Findings Associated with Inspection 95003: Evaluation of NRC Assessment and Inspection Processes at Pilgrim Nuclear Power Station ML17212A5712017-07-28028 July 2017 Recovery Plan ML16153A3722016-06-20020 June 2016 Final ASP Analysis Pilgrim (LER 293-15-001) ML15043A7542015-03-24024 March 2015 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 1 of Order EA-13-109 (Severe Accident Capable Hardened Vents) ML15075A0822015-03-12012 March 2015 Entergy'S Required Response of the Near-Term Task Force Recommendation 2.1: Flooding-Hazard Reevaluation Report ML14171A2002014-06-26026 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (MF0264) ML12342A3862012-12-0606 December 2012 Fifth Ten-Year Inservice Testing Program and Request for Approval of IST Relief Requests, PR-03 and PR-05 ML12333A3212012-11-27027 November 2012 Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10CFR50.54(f) the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML12160A3712012-06-11011 June 2012 Review of 60-Day Response to Request for Information Regarding Recommendation 9.3, of the Near-Term Task Force Related to Fukushima Daiichi Nuclear Plant Accident ML13196A1892012-04-12012 April 2012 Email from B. Balsam, NRR to J. Crocker, NOAA Pilgrim: NRC Complete Responses to 4-9-12 NMFS Questions ML11346A5682011-12-0909 December 2011 Report Entitled - Regulatory Meltdown: How Four Nuclear Regulatory Commissioners Conspired to Delay and Weaken Nuclear Reactor Safety in the Wake of Fukushima ML1127000692011-09-26026 September 2011 Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants ML1019004142009-03-12012 March 2009 Condition Report, CR-PNP-2009-00879 ML0712300162007-05-0202 May 2007 FSEIS Reference - Nonradioactive Waste Information ML0712102522007-04-21021 April 2007 Weld Filler and Welding Electrode Materials for Structural Weld Overlays within the Scope of Pilgrim Relief Request, PRR-15 ENOC-07-00002, Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 20062007-02-28028 February 2007 Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 2006 ML0629104322006-11-17017 November 2006 Final Response to Task Interface Agreement 2006-01 Related to the Adequacy of Emergency Diesel Generator and Shutdown Transformer Load Testing at Pilgrim Nuclear Power Station ML0707901202006-10-0606 October 2006 CR-PNP-2006-03702, an Issue Was Raised During the Region I Inspection for License Renewal Regarding the Expected Service Life of a Protective Coating for Buried Piping ML0707901152006-10-0404 October 2006 CR-PNP-2006-03677, Controls to Prevent and Monitor for Corrosion of the Drywell Shell Need to Be Assessed and Strengthened ENOC-06-00018, Stations - Fitness-for-Duty Program Performance Report for the Period January 2006 - June 20062006-08-29029 August 2006 Stations - Fitness-for-Duty Program Performance Report for the Period January 2006 - June 2006 ML0622806022006-07-31031 July 2006 Groundwater Protection - Data Collection Questionnaire CNRO-2006-00034, Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont Yankee2006-07-13013 July 2006 Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont Yankee ML0630603022006-07-11011 July 2006 Email: (PA-LR) FW: Pilgrim Document 83 ML0704404792006-05-18018 May 2006 CR-PNP-2006-01914 - Pilgrim ML0634701762006-03-29029 March 2006 Pilgrim: NRC Contact Report - Arrange Meeting with Town Officials During Site Audit (Intergovernmental) BVY 06-016, Entergy Nuclear Northeast - Fitness-for-Duty Program Performance Report for the Period July 2005 - December 20052006-02-27027 February 2006 Entergy Nuclear Northeast - Fitness-for-Duty Program Performance Report for the Period July 2005 - December 2005 BVY 05-089, Entergy Nuclear Northeast - Proof of Financial Protection2005-09-28028 September 2005 Entergy Nuclear Northeast - Proof of Financial Protection BVY 05-078, Fitness-for-Duty Program Performance Report for the Period January - June 20052005-08-29029 August 2005 Fitness-for-Duty Program Performance Report for the Period January - June 2005 ML0707901612005-05-16016 May 2005 CR-PNP-2005-02621, Rollup CR with Various Problems Inservice Inspection Related BVY 05-018, Fitness-for-Duty Program Performance Report for the Period July - December 20042005-02-28028 February 2005 Fitness-for-Duty Program Performance Report for the Period July - December 2004 BVY 03-069, Fitness-for-Duty Program Performance Report for Period January - June 20032003-08-18018 August 2003 Fitness-for-Duty Program Performance Report for Period January - June 2003 ML0707901832003-08-12012 August 2003 CR-PNP-2003-02976, Pilgrim Construction Activity and Damage to Underground Utilities ML0707806532003-04-22022 April 2003 CR-PNP-2003-01471, Primary Containment Isolation Valve (PCIV) 262-F-013A Experienced Increased But Acceptable Local Leak Rate Test Results ML0707806242003-04-19019 April 2003 CR-PNP-2003-01413, Secondary Containment Leakrate Testing Was Aborted ML0707806322003-04-19019 April 2003 CR-PNP-2002-01414, the Concrete Shield Block for the Drywell Equipment Hatch Was Removed Prior to the Reactor Being Less than 212F ML0707806152003-04-17017 April 2003 CR-PNP-2002-01411, Secondary Containment Leakrate Testing Was Aborted ML0308403822003-03-17017 March 2003 Response to NRC Request for Additional Information Appendix K Measurement Uncertainty Recovery - Power Uprate Request JPN-03-004, Fitness-for-Duty Program Performance Report for the Period July - December 20022003-02-26026 February 2003 Fitness-for-Duty Program Performance Report for the Period July - December 2002 ML0707806032002-12-13013 December 2002 CR-PNP-2002-12941, P-208D (D Salt Service Water Pump) Shaft Had Pitting JPN-02-024, Fitness-for-Duty Program Performance Report for the Period January - June 20022002-08-15015 August 2002 Fitness-for-Duty Program Performance Report for the Period January - June 2002 ML0707805642002-06-19019 June 2002 CR-PNP-2002-10639, Received Blackout Diesel Generator Alarm (C3L-A4) Several Times During Shift on 06/19/2005 ML0707805452002-02-27027 February 2002 CR-PNP-2002-09283, Unable to Reassemble E-122B, B Tbccw Heat Exchanger Head JPN-02-002, Entergy Nuclear Northeast'S Submittal of Fitness-for-Duty Program Performance Report for the Period July - December 20012002-02-25025 February 2002 Entergy Nuclear Northeast'S Submittal of Fitness-for-Duty Program Performance Report for the Period July - December 2001 ML0707805082001-11-0808 November 2001 CR-PNP-2001-04779, T- 112 Cation Regen Tank Found Second Leak ML0707906032001-10-10010 October 2001 Pr 01.4238, Tour Operator Reported That HCU 50-31 Leak Appears Worse - Closure ML0707804912001-09-27027 September 2001 CR-PNP-2001-04238, HCU 50-31 Leak ML0707905962001-09-25025 September 2001 Pr 01.4171, Tour Operator Found Alarm C190-D3 on D# SBO DG Fuel Tank Leakage in Alarm. Panel Indicates Probe #1 Wet Alert Water Detected Alarm ML0707804532001-09-20020 September 2001 CR-PNP-2001-04171, Alarm C190-D3 SBO DG Fuel Tank Leakage in Alarm ML0707905832001-09-17017 September 2001 Pr 01.4048, Received Sdo DG Fuel Tank Leakage Alarm Alert Wet Probes 1 2021-07-06 |