 Issue dateTitleTopic
L-21-078, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G6 July 2021Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G
ML18158A1336 June 2018Extent of Condition Review in Response to Findings Associated with Inspection 95003: Evaluation of NRC Assessment and Inspection Processes at Pilgrim Nuclear Power StationHot Short
Safe Shutdown
Unanalyzed Condition
Enforcement Discretion
Missed surveillance
Tornado Missile Protection
Pressure Boundary Leakage
Offsite Circuit
ML17212A57128 July 2017Recovery PlanFunctionality Assessment
Condition Adverse to Quality
Maintenance Rule Program
Grace period
ML16153A37220 June 2016Final ASP Analysis Pilgrim (LER 293-15-001)
ML15043A75424 March 2015Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 1 of Order EA-13-109 (Severe Accident Capable Hardened Vents)Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
FLEX
Fukushima Dai-Ichi
Seismically rugged
Design basis earthquake
Battery sizing
Earthquake
Hardened vent
Scaffolding
ML15075A08212 March 2015Entergy'S Required Response of the Near-Term Task Force Recommendation 2.1: Flooding-Hazard Reevaluation ReportHigh winds
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Operating Basis Earthquake
Fukushima Dai-Ichi
Frazil ice
Earthquake
ML14171A20026 June 2014Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (MF0264)Unanalyzed Condition
Operator Manual Action
Fukushima Dai-Ichi
Earthquake
ML12342A3866 December 2012Fifth Ten-Year Inservice Testing Program and Request for Approval of IST Relief Requests, PR-03 and PR-05Safe Shutdown
High Radiation Area
Stroke time
Squib
Scram Discharge Volume
Cold shutdown justification
Power-Operated Valves
Scaffolding
Grace period
Power change
ML12333A32127 November 2012Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10CFR50.54(f) the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentInternal Flooding
Hydrostatic
Fukushima Dai-Ichi
ML12160A37111 June 2012Review of 60-Day Response to Request for Information Regarding Recommendation 9.3, of the Near-Term Task Force Related to Fukushima Daiichi Nuclear Plant AccidentEarthquake
ML13196A18912 April 2012Email from B. Balsam, NRR to J. Crocker, NOAA Pilgrim: NRC Complete Responses to 4-9-12 NMFS QuestionsHydrostatic
Biofouling
ML11346A5689 December 2011Report Entitled - Regulatory Meltdown: How Four Nuclear Regulatory Commissioners Conspired to Delay and Weaken Nuclear Reactor Safety in the Wake of FukushimaEarthquake
ML11270006926 September 2011Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 PlantsShutdown Margin
Anticipated operational occurrence
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Channel-control blade interference
Scram Discharge Volume
Earthquake
ML10190041412 March 2009Condition Report, CR-PNP-2009-00879
ML0712300162 May 2007FSEIS Reference - Nonradioactive Waste Information
ML07121025221 April 2007Weld Filler and Welding Electrode Materials for Structural Weld Overlays within the Scope of Pilgrim Relief Request, PRR-15Weld Overlay
ENOC-07-00002, Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 200628 February 2007Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 2006Fitness for Duty
ML06291043217 November 2006Final Response to Task Interface Agreement 2006-01 Related to the Adequacy of Emergency Diesel Generator and Shutdown Transformer Load Testing at Pilgrim Nuclear Power Station
ML0707901206 October 2006CR-PNP-2006-03702, an Issue Was Raised During the Region I Inspection for License Renewal Regarding the Expected Service Life of a Protective Coating for Buried Piping
ML0707901154 October 2006CR-PNP-2006-03677, Controls to Prevent and Monitor for Corrosion of the Drywell Shell Need to Be Assessed and StrengthenedAging Management
ENOC-06-00018, Stations - Fitness-for-Duty Program Performance Report for the Period January 2006 - June 200629 August 2006Stations - Fitness-for-Duty Program Performance Report for the Period January 2006 - June 2006Fitness for Duty
ML06228060231 July 2006Groundwater Protection - Data Collection Questionnaire
CNRO-2006-00034, Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont Yankee13 July 2006Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont YankeeMururoa
ML06306030211 July 2006Email: (PA-LR) FW: Pilgrim Document 83Zebra Mussel
Aging Management
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
License Renewal
Power Uprate
ML07044047918 May 2006CR-PNP-2006-01914 - Pilgrim
ML06347017629 March 2006Pilgrim: NRC Contact Report - Arrange Meeting with Town Officials During Site Audit (Intergovernmental)
BVY 06-016, Entergy Nuclear Northeast - Fitness-for-Duty Program Performance Report for the Period July 2005 - December 200527 February 2006Entergy Nuclear Northeast - Fitness-for-Duty Program Performance Report for the Period July 2005 - December 2005Fitness for Duty
BVY 05-089, Entergy Nuclear Northeast - Proof of Financial Protection28 September 2005Entergy Nuclear Northeast - Proof of Financial Protection
BVY 05-078, Fitness-for-Duty Program Performance Report for the Period January - June 200529 August 2005Fitness-for-Duty Program Performance Report for the Period January - June 2005Fitness for Duty
ML07079016116 May 2005CR-PNP-2005-02621, Rollup CR with Various Problems Inservice Inspection Related
BVY 05-018, Fitness-for-Duty Program Performance Report for the Period July - December 200428 February 2005Fitness-for-Duty Program Performance Report for the Period July - December 2004Fitness for Duty
BVY 03-069, Fitness-for-Duty Program Performance Report for Period January - June 200318 August 2003Fitness-for-Duty Program Performance Report for Period January - June 2003Fitness for Duty
Stolen
ML07079018312 August 2003CR-PNP-2003-02976, Pilgrim Construction Activity and Damage to Underground Utilities
ML07078065322 April 2003CR-PNP-2003-01471, Primary Containment Isolation Valve (PCIV) 262-F-013A Experienced Increased But Acceptable Local Leak Rate Test Results
ML07078062419 April 2003CR-PNP-2003-01413, Secondary Containment Leakrate Testing Was Aborted
ML07078063219 April 2003CR-PNP-2002-01414, the Concrete Shield Block for the Drywell Equipment Hatch Was Removed Prior to the Reactor Being Less than 212F
ML07078061517 April 2003CR-PNP-2002-01411, Secondary Containment Leakrate Testing Was Aborted
ML03084038217 March 2003Response to NRC Request for Additional Information Appendix K Measurement Uncertainty Recovery - Power Uprate RequestPower change
JPN-03-004, Fitness-for-Duty Program Performance Report for the Period July - December 200226 February 2003Fitness-for-Duty Program Performance Report for the Period July - December 2002Fitness for Duty
ML07078060313 December 2002CR-PNP-2002-12941, P-208D (D Salt Service Water Pump) Shaft Had PittingCoatings
JPN-02-024, Fitness-for-Duty Program Performance Report for the Period January - June 200215 August 2002Fitness-for-Duty Program Performance Report for the Period January - June 2002Fitness for Duty
Accidental discharge
Inattentive
ML07078056419 June 2002CR-PNP-2002-10639, Received Blackout Diesel Generator Alarm (C3L-A4) Several Times During Shift on 06/19/2005
ML07078054527 February 2002CR-PNP-2002-09283, Unable to Reassemble E-122B, B Tbccw Heat Exchanger Head
JPN-02-002, Entergy Nuclear Northeast'S Submittal of Fitness-for-Duty Program Performance Report for the Period July - December 200125 February 2002Entergy Nuclear Northeast'S Submittal of Fitness-for-Duty Program Performance Report for the Period July - December 2001Fitness for Duty
ML0707805088 November 2001CR-PNP-2001-04779, T- 112 Cation Regen Tank Found Second Leak
ML07079060310 October 2001Pr 01.4238, Tour Operator Reported That HCU 50-31 Leak Appears Worse - Closure
ML07078049127 September 2001CR-PNP-2001-04238, HCU 50-31 Leak
ML07079059625 September 2001Pr 01.4171, Tour Operator Found Alarm C190-D3 on D# SBO DG Fuel Tank Leakage in Alarm. Panel Indicates Probe #1 Wet Alert Water Detected Alarm
ML07078045320 September 2001CR-PNP-2001-04171, Alarm C190-D3 SBO DG Fuel Tank Leakage in Alarm
ML07079058317 September 2001Pr 01.4048, Received Sdo DG Fuel Tank Leakage Alarm Alert Wet Probes 1