Issue date | Title | Topic | |
---|---|---|---|
L-21-078, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G | 6 July 2021 | Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G | |
ML18158A133 | 6 June 2018 | Extent of Condition Review in Response to Findings Associated with Inspection 95003: Evaluation of NRC Assessment and Inspection Processes at Pilgrim Nuclear Power Station | Hot Short Safe Shutdown Unanalyzed Condition Enforcement Discretion Missed surveillance Tornado Missile Protection Pressure Boundary Leakage Offsite Circuit |
ML17212A571 | 28 July 2017 | Recovery Plan | Functionality Assessment Condition Adverse to Quality Maintenance Rule Program Grace period |
ML16153A372 | 20 June 2016 | Final ASP Analysis Pilgrim (LER 293-15-001) | |
ML15043A754 | 24 March 2015 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 1 of Order EA-13-109 (Severe Accident Capable Hardened Vents) | Ultimate heat sink Tornado Missile Safe Shutdown Earthquake FLEX Fukushima Dai-Ichi Seismically rugged Design basis earthquake Battery sizing Earthquake Hardened vent Scaffolding |
ML15075A082 | 12 March 2015 | Entergy'S Required Response of the Near-Term Task Force Recommendation 2.1: Flooding-Hazard Reevaluation Report | High winds Safe Shutdown Earthquake Internal Flooding Hydrostatic Operating Basis Earthquake Fukushima Dai-Ichi Frazil ice Earthquake |
ML14171A200 | 26 June 2014 | Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (MF0264) | Unanalyzed Condition Operator Manual Action Fukushima Dai-Ichi Earthquake |
ML12342A386 | 6 December 2012 | Fifth Ten-Year Inservice Testing Program and Request for Approval of IST Relief Requests, PR-03 and PR-05 | Safe Shutdown High Radiation Area Stroke time Squib Scram Discharge Volume Cold shutdown justification Power-Operated Valves Scaffolding Grace period Power change |
ML12333A321 | 27 November 2012 | Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10CFR50.54(f) the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | Internal Flooding Hydrostatic Fukushima Dai-Ichi |
ML12160A371 | 11 June 2012 | Review of 60-Day Response to Request for Information Regarding Recommendation 9.3, of the Near-Term Task Force Related to Fukushima Daiichi Nuclear Plant Accident | Earthquake |
ML13196A189 | 12 April 2012 | Email from B. Balsam, NRR to J. Crocker, NOAA Pilgrim: NRC Complete Responses to 4-9-12 NMFS Questions | Hydrostatic Biofouling |
ML11346A568 | 9 December 2011 | Report Entitled - Regulatory Meltdown: How Four Nuclear Regulatory Commissioners Conspired to Delay and Weaken Nuclear Reactor Safety in the Wake of Fukushima | Earthquake |
ML112700069 | 26 September 2011 | Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants | Shutdown Margin Anticipated operational occurrence Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Channel-control blade interference Scram Discharge Volume Earthquake |
ML101900414 | 12 March 2009 | Condition Report, CR-PNP-2009-00879 | |
ML071230016 | 2 May 2007 | FSEIS Reference - Nonradioactive Waste Information | |
ML071210252 | 21 April 2007 | Weld Filler and Welding Electrode Materials for Structural Weld Overlays within the Scope of Pilgrim Relief Request, PRR-15 | Weld Overlay |
ENOC-07-00002, Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 2006 | 28 February 2007 | Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 2006 | Fitness for Duty |
ML062910432 | 17 November 2006 | Final Response to Task Interface Agreement 2006-01 Related to the Adequacy of Emergency Diesel Generator and Shutdown Transformer Load Testing at Pilgrim Nuclear Power Station | |
ML070790120 | 6 October 2006 | CR-PNP-2006-03702, an Issue Was Raised During the Region I Inspection for License Renewal Regarding the Expected Service Life of a Protective Coating for Buried Piping | |
ML070790115 | 4 October 2006 | CR-PNP-2006-03677, Controls to Prevent and Monitor for Corrosion of the Drywell Shell Need to Be Assessed and Strengthened | Aging Management |
ENOC-06-00018, Stations - Fitness-for-Duty Program Performance Report for the Period January 2006 - June 2006 | 29 August 2006 | Stations - Fitness-for-Duty Program Performance Report for the Period January 2006 - June 2006 | Fitness for Duty |
ML062280602 | 31 July 2006 | Groundwater Protection - Data Collection Questionnaire | |
CNRO-2006-00034, Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont Yankee | 13 July 2006 | Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont Yankee | Mururoa |
ML063060302 | 11 July 2006 | Email: (PA-LR) FW: Pilgrim Document 83 | Zebra Mussel Aging Management Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report License Renewal Power Uprate |
ML070440479 | 18 May 2006 | CR-PNP-2006-01914 - Pilgrim | |
ML063470176 | 29 March 2006 | Pilgrim: NRC Contact Report - Arrange Meeting with Town Officials During Site Audit (Intergovernmental) | |
BVY 06-016, Entergy Nuclear Northeast - Fitness-for-Duty Program Performance Report for the Period July 2005 - December 2005 | 27 February 2006 | Entergy Nuclear Northeast - Fitness-for-Duty Program Performance Report for the Period July 2005 - December 2005 | Fitness for Duty |
BVY 05-089, Entergy Nuclear Northeast - Proof of Financial Protection | 28 September 2005 | Entergy Nuclear Northeast - Proof of Financial Protection | |
BVY 05-078, Fitness-for-Duty Program Performance Report for the Period January - June 2005 | 29 August 2005 | Fitness-for-Duty Program Performance Report for the Period January - June 2005 | Fitness for Duty |
ML070790161 | 16 May 2005 | CR-PNP-2005-02621, Rollup CR with Various Problems Inservice Inspection Related | |
BVY 05-018, Fitness-for-Duty Program Performance Report for the Period July - December 2004 | 28 February 2005 | Fitness-for-Duty Program Performance Report for the Period July - December 2004 | Fitness for Duty |
BVY 03-069, Fitness-for-Duty Program Performance Report for Period January - June 2003 | 18 August 2003 | Fitness-for-Duty Program Performance Report for Period January - June 2003 | Fitness for Duty Stolen |
ML070790183 | 12 August 2003 | CR-PNP-2003-02976, Pilgrim Construction Activity and Damage to Underground Utilities | |
ML070780653 | 22 April 2003 | CR-PNP-2003-01471, Primary Containment Isolation Valve (PCIV) 262-F-013A Experienced Increased But Acceptable Local Leak Rate Test Results | |
ML070780624 | 19 April 2003 | CR-PNP-2003-01413, Secondary Containment Leakrate Testing Was Aborted | |
ML070780632 | 19 April 2003 | CR-PNP-2002-01414, the Concrete Shield Block for the Drywell Equipment Hatch Was Removed Prior to the Reactor Being Less than 212F | |
ML070780615 | 17 April 2003 | CR-PNP-2002-01411, Secondary Containment Leakrate Testing Was Aborted | |
ML030840382 | 17 March 2003 | Response to NRC Request for Additional Information Appendix K Measurement Uncertainty Recovery - Power Uprate Request | Power change |
JPN-03-004, Fitness-for-Duty Program Performance Report for the Period July - December 2002 | 26 February 2003 | Fitness-for-Duty Program Performance Report for the Period July - December 2002 | Fitness for Duty |
ML070780603 | 13 December 2002 | CR-PNP-2002-12941, P-208D (D Salt Service Water Pump) Shaft Had Pitting | Coatings |
JPN-02-024, Fitness-for-Duty Program Performance Report for the Period January - June 2002 | 15 August 2002 | Fitness-for-Duty Program Performance Report for the Period January - June 2002 | Fitness for Duty Accidental discharge Inattentive |
ML070780564 | 19 June 2002 | CR-PNP-2002-10639, Received Blackout Diesel Generator Alarm (C3L-A4) Several Times During Shift on 06/19/2005 | |
ML070780545 | 27 February 2002 | CR-PNP-2002-09283, Unable to Reassemble E-122B, B Tbccw Heat Exchanger Head | |
JPN-02-002, Entergy Nuclear Northeast'S Submittal of Fitness-for-Duty Program Performance Report for the Period July - December 2001 | 25 February 2002 | Entergy Nuclear Northeast'S Submittal of Fitness-for-Duty Program Performance Report for the Period July - December 2001 | Fitness for Duty |
ML070780508 | 8 November 2001 | CR-PNP-2001-04779, T- 112 Cation Regen Tank Found Second Leak | |
ML070790603 | 10 October 2001 | Pr 01.4238, Tour Operator Reported That HCU 50-31 Leak Appears Worse - Closure | |
ML070780491 | 27 September 2001 | CR-PNP-2001-04238, HCU 50-31 Leak | |
ML070790596 | 25 September 2001 | Pr 01.4171, Tour Operator Found Alarm C190-D3 on D# SBO DG Fuel Tank Leakage in Alarm. Panel Indicates Probe #1 Wet Alert Water Detected Alarm | |
ML070780453 | 20 September 2001 | CR-PNP-2001-04171, Alarm C190-D3 SBO DG Fuel Tank Leakage in Alarm | |
ML070790583 | 17 September 2001 | Pr 01.4048, Received Sdo DG Fuel Tank Leakage Alarm Alert Wet Probes 1 |