ML19365A177
Person / Time
Site: Pilgrim
Issue date: 12/31/2019
From: Sterdis A
Holtec Decommissioning International
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EA-17-132, EA-17-153, HDI-PIL-19-021
Download: ML19365A177 (4)


Text

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 EA-17-132/153 December 31, 2019 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Pilgrim Nuclear Power Station Renewed Facility Operating License No. DPR-35 NRC Docket No. 50-293

Subject:

Holtec Decommissioning International (HDI) Response to Confirmatory Order EA-17-132/EA-17-153

References:

[1] Entergy Operations, Inc./Entergy Nuclear Operations Inc. (Entergy) letter to U. S. Nuclear Regulatory Commission (NRC), Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K - 2019 Summary, dated December 30, 2019

[2] Entergy Operations, Inc./Entergy Nuclear Operations Inc. (Entergy) letter to U. S. Nuclear Regulatory Commission (NRC), Entergy Response to Confirmatory Order EA-17-132/EA-17-153, dated March 21, 2019 (ADAMS Accession No. ML19081A270)

In a letter dated December 30, 2019 (Reference 1), Entergy Operations, Inc./Entergy Nuclear Operations Inc. (Entergy) provided the 2019 Summary of actions taken to address Confirmatory Order EA-17-132/EA-17-153. Holtec Decommissioning International, LLC (HDI) is providing additional information for the Pilgrim Nuclear Power Station (PNPS).

A review identified that the scheduled completion dates for the two actions stated in Reference 2 needed to be changed. HDI became aware of a gap in addressing the communication action on December 5, 2019. A revision of commitments is provided in Enclosure 1 to this letter. The revision provides 90 days from the date of notification for the communication to be documented.

A time frame comparable to Entergys response in Reference 2 was selected for the survey of integrity messaging. HDI understands the importance of addressing acts of willful misconduct and the need for integrity among the workforce. HDI will continue to coordinate with Entergy to ensure the future actions outlined in the Order are met.

HDI-PIL-19-021 Page 1 of 2

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 Should you have any questions or require further information, please contact me at (856) 797-0900, x3813.

Respectfully, Andrea Sterdis HDI VP Regulatory and Environmental Affairs Holtec Decommissioning International, LLC : List of Regulatory Commitments cc: NRC Region I Regional Administrator NRC NRR Project Manager (Pilgrim Nuclear Power Station)

NRC NMSS Project Manager (Pilgrim Nuclear Power Station)

HDI-PIL-19-021 Page 2 of 2

Enclosure 1 List of Regulatory Commitments

LIST OF REGULATORY COMMITMENTS The following table identifies those actions committed to by HDI in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.

Commitment One-Time Scheduled Completion Action Date HDI will utilize the Entergy Tier 2 X March 4, 2020 Communication process to ensure that the one remaining semiannual integrity communication is delivered in a timely manner. HDI will record the receipt and acknowledgement of these communications for future traceability.

Element D of the Confirmatory Order requires X April 26, 2020 Entergy to identify specific criteria necessary to perform annual effectiveness reviews. HDI will conduct a survey to ensure the integrity message has been received and understood. HDI will modify its corrective actions, as needed, based on the results of the effectiveness reviews.