L-2018-064, Submittal of Joint Composite Adversary Force

From kanterella
Jump to navigation Jump to search
Submittal of Joint Composite Adversary Force
ML18072A107
Person / Time
Site: Palisades, Indian Point, Grand Gulf, Pilgrim, Arkansas Nuclear, River Bend, Waterford  Entergy icon.png
Issue date: 03/08/2018
From: Halter M
Entergy Nuclear Operations, Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CNR0-2018-00009, L-2018-064
Download: ML18072A107 (2)


Text

Entergy Nuclear Operations, Inc.

Entergy Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213 601-368-5000 Mandy Halter Director, Nuclear Licensing '

CNR0-2018-00009 March 8, 2018 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

NextEra Energy-Entergy Joint Composite Adversary Force Arkansas Nuclear One Units 1 & 2 Pilgrim Nuclear Power Station Docket Nos. 50-313 & 50-368 Docket No. 50-293 Grand Gulf Nuclear Station River Bend Station Docket No. 50-416 Docket No. 50-458 Indian Point Nuclear Generating Waterford 3 Steam Electric Station Units 2 & 3 Docket No. 50-382 Docket Nos. 50-247 & 50-286 Palisades Nuclear Power Plant Docket No. 50-255

REFERENCE:

NextEra Energy letter L-2018-064, dated March 8, 2018

Dear Sir or Madam:

Entergy Operations, Inc., the licensee for the Arkansas Nuclear One Units 1 & 2, Grand Gulf Nuclear Station, River Bend Station, and Waterford 3 Steam Electric Station, and Entergy Nuclear Operations, Inc., the licensee for Indian Point Nuclear Generating Units 2 & 3, Palisades Nuclear Power Plant, and Pilgrim Nuclear Power Station (collectively referred to as Entergy) plans to implement a Joint Composite Adversary Force (JCAF) with NextEra Energy for the purpose of replicating adversary characteristics during Triennial Force On Force exercises. The enclosure to this letter outlines our mutual plans for implementing the JCAF. The enclosure contains Security-Related Information.

This letter contains no new regulatory commitments.

Should you have any questions, please contact Jonathan LaPlante, Director of Security, at (601) 368-5216.

Sincerely, lnf~G MH/gpn

CNR0-2018-00009 I Page 2 of 2

Enclosure:

SECURITY RELATED INFORMATION -

WITHHOLD FROM PUBLIC DISCLOSURE IAW 10CFR 2.390 NextEra/Entergy joint Composite Adversary Force cc: USNRC Director, Office of Nuclear Security and Incident Response USNRC Reg.ional Administrator, Region I USNRC Regional Administrator, Region Ill i USNRC Regional Administrator, Region IV USNRC Project Manager, ANO 1/2 USNRC Proje~t Manager, Grand Gulf USNRC Project Manager, Indian Point 2/3 USNRC Project Manager, Palisades USNRC Project Manager, Pilgrim USNRC Project Manager, River Bend USNRC Project Manager, Waterford 3 USNRC Senior Resident Inspector, ANO 1/2 USNRC Senior Resident Inspector, Grand Gulf USNRC Senior Resident Inspector, Indian Point 2/3 USNRC Senior Resident Inspector, Palisades USNRC Senior Resident Inspector, Pilgrim USNRC Senior Resident Inspector, River Bend USNRC Senior Resident Inspector, Waterford 3 Mr. A. Bakken Ill (ECH)

Mr. J. Ventosa (ECH)

Mr. C. Costanzo (ECH)

Mr. L. Coyle (ECH)

Mr. R. Anderson (ANO)

Mr. E. Larson (GGNS)

Mr. A. Vitale (IPEC)

Mr. C. Arnone (PAL)

Mr. B. Sullivan (PNPS)

Mr. W. Maguire (RBS)

Mr. J. Dinelli (WF3)

Mr. K. Jury (ECH)

Mr. R. Gaston (ECH)

Ms. M. Halter (ECH)