Issue date | Title | Topic | |
---|---|---|---|
L-21-078, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G | 6 July 2021 | Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G | |
ML18158A133 | 6 June 2018 | Extent of Condition Review in Response to Findings Associated with Inspection 95003: Evaluation of NRC Assessment and Inspection Processes at Pilgrim Nuclear Power Station | Hot Short Safe Shutdown Unanalyzed Condition Enforcement Discretion Missed surveillance Tornado Missile Protection Pressure Boundary Leakage Offsite Circuit |
ML19056A193 | 17 August 2017 | Attachment 2 Design Input Record | |
ML17212A571 | 28 July 2017 | Recovery Plan | Functionality Assessment Condition Adverse to Quality Maintenance Rule Program Grace period |
ML16153A372 | 20 June 2016 | Final ASP Analysis Pilgrim (LER 293-15-001) | |
ML15043A754 | 24 March 2015 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 1 of Order EA-13-109 (Severe Accident Capable Hardened Vents) | Ultimate heat sink Tornado Missile Safe Shutdown Earthquake FLEX Fukushima Dai-Ichi Seismically rugged Design basis earthquake Battery sizing Earthquake Hardened vent Scaffolding |
ML15075A082 | 12 March 2015 | Entergy'S Required Response of the Near-Term Task Force Recommendation 2.1: Flooding-Hazard Reevaluation Report | High winds Safe Shutdown Earthquake Internal Flooding Hydrostatic Operating Basis Earthquake Fukushima Dai-Ichi Frazil ice Earthquake |
ML14294A591 | 4 November 2014 | Final ASP Analysis - Pilgrim Nuclear Power Station (LER 293-13-009) | Fitness for Duty Significance Determination Process |
ML14171A200 | 26 June 2014 | Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (MF0264) | Unanalyzed Condition Operator Manual Action Fukushima Dai-Ichi Earthquake |
ML14176A961 | 24 June 2014 | Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 | Fire Barrier Coatings Foreign Material Exclusion |
ML14324A040 | 17 April 2014 | HI-2104715, Seismic Analysis of the Loaded HI-TRAC in the SFP and SFP Slab Qualification. | Safe Shutdown Earthquake Hydrostatic Earthquake |
ML14092A023 | 31 March 2014 | Entergy'S Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima... | Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Fukushima Dai-Ichi Earthquake |
ML13338A667 | 9 December 2013 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Pilgrim Nuclear Power Station, TAC No.: MF0777 | Safe Shutdown High winds Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Post Accident Monitoring Internal Flooding Emergency Lighting FLEX Fukushima Dai-Ichi Seismically rugged Frazil ice Battery sizing B.5.b Mitigating Strategies Earthquake |
ML13232A132 | 17 June 2013 | PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C85 of C413 Through Page C173 of C413 | |
ML13232A134 | 17 June 2013 | PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C174 of C413 Through Page C250 of C413 | Scaffolding |
ML13232A135 | 17 June 2013 | PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C251 of C413 Through Page C331 of C413 | Post Accident Monitoring |
ML13232A137 | 17 June 2013 | PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C332 of C413 Through Page C413 of C413 | |
ML13232A138 | 17 June 2013 | PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment D, Page D1 of D127 Through Page D73 of D127 | Scaffolding |
ML13232A140 | 17 June 2013 | PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment D, Page D74 of D127 Through Attachment H, Page H12 of H12 | Safe Shutdown Fukushima Dai-Ichi Scaffolding |
ML13232A141 | 17 June 2013 | PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment I, Page I1 of I9 Through Attachment J, Page J77 of J134 | Scaffolding |
ML13232A131 | 17 June 2013 | PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C1 of C413 Through Page C84 of C413 | Scaffolding |
ML13232A130 | 17 June 2013 | PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment a Through Attachment B | Post Accident Monitoring |
ML13232A129 | 17 June 2013 | PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment J, Page J78 of J134 Through End | Scaffolding |
ML13232A128 | 17 June 2013 | PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page 37 of 37 | Safe Shutdown Unanalyzed Condition Safe Shutdown Earthquake Post Accident Monitoring Fukushima Dai-Ichi Seismically rugged License Renewal Earthquake GOTHIC Power Uprate Seismic Walkdown Report |
ML12342A386 | 6 December 2012 | Fifth Ten-Year Inservice Testing Program and Request for Approval of IST Relief Requests, PR-03 and PR-05 | Safe Shutdown High Radiation Area Stroke time Squib Scram Discharge Volume Cold shutdown justification Power-Operated Valves Scaffolding Grace period Power change |
ML12333A321 | 27 November 2012 | Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10CFR50.54(f) the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | Internal Flooding Hydrostatic Fukushima Dai-Ichi |
ML12160A371 | 11 June 2012 | Review of 60-Day Response to Request for Information Regarding Recommendation 9.3, of the Near-Term Task Force Related to Fukushima Daiichi Nuclear Plant Accident | Earthquake |
ML13196A189 | 12 April 2012 | Email from B. Balsam, NRR to J. Crocker, NOAA Pilgrim: NRC Complete Responses to 4-9-12 NMFS Questions | Hydrostatic Biofouling |
ML13196A236 | 12 April 2012 | Email from M. Smith, OGC to S. Uttal OGC Et Al., on Additional Pilgrim Exhibits | Internal Flooding Probabilistic Risk Assessment Incorporated by reference License Renewal Earthquake Chernobyl Fuel cladding Stolen Affidavit |
ML12047A119 | 29 February 2012 | Request to Include Atlantic Sturgeon in Ongoing Informal Section 7 Consultation for Pilgrim Nuclear Power Station | License Renewal |
ML120440351 | 27 February 2012 | Acknowledgement of Withdrawal and Results of Acceptance Review Proposed License Amendment Request for Rod Withdrawal Minimizer Bypass Allowance to Allow Reactor Startup | |
ML11346A568 | 9 December 2011 | Report Entitled - Regulatory Meltdown: How Four Nuclear Regulatory Commissioners Conspired to Delay and Weaken Nuclear Reactor Safety in the Wake of Fukushima | Earthquake |
ML112700069 | 26 September 2011 | Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants | Shutdown Margin Anticipated operational occurrence Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Channel-control blade interference Scram Discharge Volume Earthquake |
ML14086A502 | 13 June 2011 | Enclosure 1 to PNPS Letter 2.14.027 - Entergy Nuclear Engineering Report No. PNPS-RPT-11-00001, Re-assessment of Pilgrim Seismic Core Damage Frequency | Mission time Safe Shutdown Earthquake Probabilistic Risk Assessment Earthquake Generic Issues Program |
ML110420306 | 31 January 2011 | GE Hitachi Nuclear Energy Report, NEDC-33532, Revision 2, Pilgrim Nuclear Power Station Safety Valve Setpoint Increase, Enclosure 4 to 2.11.007 | Reactor Vessel Water Level Stroke time Anticipated operational occurrence Feedwater Controller Failure MELLLA Fuel cladding Power change |
ML100770451 | 31 March 2010 | NEDO-33532, Rev 0, Pilgrim Nuclear Power Station Safety Valve Setpoint Increase. | Reactor Vessel Water Level Stroke time Anticipated operational occurrence Feedwater Controller Failure MELLLA Fuel cladding Power change |
ML101900414 | 12 March 2009 | Condition Report, CR-PNP-2009-00879 | |
ML082190013 | 7 August 2008 | Monthly Operating Reports Second Quarter 2008 | Reserve Station Service Transformer Power change |
ML071230016 | 2 May 2007 | FSEIS Reference - Nonradioactive Waste Information | |
ML071210252 | 21 April 2007 | Weld Filler and Welding Electrode Materials for Structural Weld Overlays within the Scope of Pilgrim Relief Request, PRR-15 | Weld Overlay |
ML071130384 | 10 April 2007 | GE-NE-0000-0066-0380-R1-NP, Pilgrim Nuclear Power Station, Torsion Arm Clamp Stress Evaluation Report. | |
ML071080222 | 10 April 2007 | Repair of the Core Shroud Stabilizer Assemblies - Torsion Arm Clamp Stress Evaluation Report | |
ML070870132 | 22 March 2007 | Request for Authorization Under the Provision of 10 CFR 50.55a(a)(3)(i) for Modification of the Core Shroud Stabilizer Assemblies | Finite Element Analysis Aging Management EVT-1 Flow Induced Vibration |
ML070870134 | 21 March 2007 | GE-NE-000-0064-9392-R2-NP, Pilgrim Unit 1, IGSCC Assessment of Shroud Repair X-750 Component Other than the Replacement Upper Support Assembly and Tie Rod Nut. | |
ML070930313 | 14 March 2007 | GE-NE-0000-0061-6306-R4-NP, Pilgrim Nuclear Power Station, Shroud Repair Replacement Upper Support Assembly-Stress Analysis Report. | Finite Element Analysis |
ENOC-07-00002, Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 2006 | 28 February 2007 | Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 2006 | Fitness for Duty |
ML062910432 | 17 November 2006 | Final Response to Task Interface Agreement 2006-01 Related to the Adequacy of Emergency Diesel Generator and Shutdown Transformer Load Testing at Pilgrim Nuclear Power Station | |
ML063480402 | 6 November 2006 | E-MAIL: (PD) Fwd: Entergy Nuclear Cultural Resources Protection Plan | |
ML070790120 | 6 October 2006 | CR-PNP-2006-03702, an Issue Was Raised During the Region I Inspection for License Renewal Regarding the Expected Service Life of a Protective Coating for Buried Piping | |
ML070790115 | 4 October 2006 | CR-PNP-2006-03677, Controls to Prevent and Monitor for Corrosion of the Drywell Shell Need to Be Assessed and Strengthened | Aging Management |