Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
L-21-078, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G6 July 2021Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G
ML18158A1336 June 2018Extent of Condition Review in Response to Findings Associated with Inspection 95003: Evaluation of NRC Assessment and Inspection Processes at Pilgrim Nuclear Power StationHot Short
Safe Shutdown
Unanalyzed Condition
Enforcement Discretion
Missed surveillance
Tornado Missile Protection
Pressure Boundary Leakage
Offsite Circuit
ML19056A19317 August 2017Attachment 2 Design Input Record
ML17212A57128 July 2017Recovery PlanFunctionality Assessment
Condition Adverse to Quality
Maintenance Rule Program
Grace period
ML16153A37220 June 2016Final ASP Analysis Pilgrim (LER 293-15-001)
ML15043A75424 March 2015Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 1 of Order EA-13-109 (Severe Accident Capable Hardened Vents)Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
FLEX
Fukushima Dai-Ichi
Seismically rugged
Design basis earthquake
Battery sizing
Earthquake
Hardened vent
Scaffolding
ML15075A08212 March 2015Entergy'S Required Response of the Near-Term Task Force Recommendation 2.1: Flooding-Hazard Reevaluation ReportHigh winds
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Operating Basis Earthquake
Fukushima Dai-Ichi
Frazil ice
Earthquake
ML14294A5914 November 2014Final ASP Analysis - Pilgrim Nuclear Power Station (LER 293-13-009)Fitness for Duty
Significance Determination Process
ML14171A20026 June 2014Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (MF0264)Unanalyzed Condition
Operator Manual Action
Fukushima Dai-Ichi
Earthquake
ML14176A96124 June 2014Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014Fire Barrier
Coatings
Foreign Material Exclusion
ML14324A04017 April 2014HI-2104715, Seismic Analysis of the Loaded HI-TRAC in the SFP and SFP Slab Qualification.Safe Shutdown Earthquake
Hydrostatic
Earthquake
ML14092A02331 March 2014Entergy'S Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima...Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Fukushima Dai-Ichi
Earthquake
ML13338A6679 December 2013Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Pilgrim Nuclear Power Station, TAC No.: MF0777Safe Shutdown
High winds
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Post Accident Monitoring
Internal Flooding
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Seismically rugged
Frazil ice
Battery sizing
B.5.b Mitigating Strategies
Earthquake
ML13232A13217 June 2013PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C85 of C413 Through Page C173 of C413
ML13232A13417 June 2013PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C174 of C413 Through Page C250 of C413Scaffolding
ML13232A13517 June 2013PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C251 of C413 Through Page C331 of C413Post Accident Monitoring
ML13232A13717 June 2013PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C332 of C413 Through Page C413 of C413
ML13232A13817 June 2013PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment D, Page D1 of D127 Through Page D73 of D127Scaffolding
ML13232A14017 June 2013PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment D, Page D74 of D127 Through Attachment H, Page H12 of H12Safe Shutdown
Fukushima Dai-Ichi
Scaffolding
ML13232A14117 June 2013PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment I, Page I1 of I9 Through Attachment J, Page J77 of J134Scaffolding
ML13232A13117 June 2013PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C1 of C413 Through Page C84 of C413Scaffolding
ML13232A13017 June 2013PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment a Through Attachment BPost Accident Monitoring
ML13232A12917 June 2013PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment J, Page J78 of J134 Through EndScaffolding
ML13232A12817 June 2013PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page 37 of 37Safe Shutdown
Unanalyzed Condition
Safe Shutdown Earthquake
Post Accident Monitoring
Fukushima Dai-Ichi
Seismically rugged
License Renewal
Earthquake
GOTHIC
Power Uprate
Seismic Walkdown Report
ML12342A3866 December 2012Fifth Ten-Year Inservice Testing Program and Request for Approval of IST Relief Requests, PR-03 and PR-05Safe Shutdown
High Radiation Area
Stroke time
Squib
Scram Discharge Volume
Cold shutdown justification
Power-Operated Valves
Scaffolding
Grace period
Power change
ML12333A32127 November 2012Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10CFR50.54(f) the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentInternal Flooding
Hydrostatic
Fukushima Dai-Ichi
ML12160A37111 June 2012Review of 60-Day Response to Request for Information Regarding Recommendation 9.3, of the Near-Term Task Force Related to Fukushima Daiichi Nuclear Plant AccidentEarthquake
ML13196A18912 April 2012Email from B. Balsam, NRR to J. Crocker, NOAA Pilgrim: NRC Complete Responses to 4-9-12 NMFS QuestionsHydrostatic
Biofouling
ML13196A23612 April 2012Email from M. Smith, OGC to S. Uttal OGC Et Al., on Additional Pilgrim ExhibitsInternal Flooding
Probabilistic Risk Assessment
Incorporated by reference
License Renewal
Earthquake
Chernobyl
Fuel cladding
Stolen
Affidavit
ML12047A11929 February 2012Request to Include Atlantic Sturgeon in Ongoing Informal Section 7 Consultation for Pilgrim Nuclear Power StationLicense Renewal
ML12044035127 February 2012Acknowledgement of Withdrawal and Results of Acceptance Review Proposed License Amendment Request for Rod Withdrawal Minimizer Bypass Allowance to Allow Reactor Startup
ML11346A5689 December 2011Report Entitled - Regulatory Meltdown: How Four Nuclear Regulatory Commissioners Conspired to Delay and Weaken Nuclear Reactor Safety in the Wake of FukushimaEarthquake
ML11270006926 September 2011Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 PlantsShutdown Margin
Anticipated operational occurrence
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Channel-control blade interference
Scram Discharge Volume
Earthquake
ML14086A50213 June 2011Enclosure 1 to PNPS Letter 2.14.027 - Entergy Nuclear Engineering Report No. PNPS-RPT-11-00001, Re-assessment of Pilgrim Seismic Core Damage FrequencyMission time
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Earthquake
Generic Issues Program
ML11042030631 January 2011GE Hitachi Nuclear Energy Report, NEDC-33532, Revision 2, Pilgrim Nuclear Power Station Safety Valve Setpoint Increase, Enclosure 4 to 2.11.007Reactor Vessel Water Level
Stroke time
Anticipated operational occurrence
Feedwater Controller Failure
MELLLA
Fuel cladding
Power change
ML10077045131 March 2010NEDO-33532, Rev 0, Pilgrim Nuclear Power Station Safety Valve Setpoint Increase.Reactor Vessel Water Level
Stroke time
Anticipated operational occurrence
Feedwater Controller Failure
MELLLA
Fuel cladding
Power change
ML10190041412 March 2009Condition Report, CR-PNP-2009-00879
ML0821900137 August 2008Monthly Operating Reports Second Quarter 2008Reserve Station Service Transformer
Power change
ML0712300162 May 2007FSEIS Reference - Nonradioactive Waste Information
ML07121025221 April 2007Weld Filler and Welding Electrode Materials for Structural Weld Overlays within the Scope of Pilgrim Relief Request, PRR-15Weld Overlay
ML07113038410 April 2007GE-NE-0000-0066-0380-R1-NP, Pilgrim Nuclear Power Station, Torsion Arm Clamp Stress Evaluation Report.
ML07108022210 April 2007Repair of the Core Shroud Stabilizer Assemblies - Torsion Arm Clamp Stress Evaluation Report
ML07087013222 March 2007Request for Authorization Under the Provision of 10 CFR 50.55a(a)(3)(i) for Modification of the Core Shroud Stabilizer AssembliesFinite Element Analysis
Aging Management
EVT-1
Flow Induced Vibration
ML07087013421 March 2007GE-NE-000-0064-9392-R2-NP, Pilgrim Unit 1, IGSCC Assessment of Shroud Repair X-750 Component Other than the Replacement Upper Support Assembly and Tie Rod Nut.
ML07093031314 March 2007GE-NE-0000-0061-6306-R4-NP, Pilgrim Nuclear Power Station, Shroud Repair Replacement Upper Support Assembly-Stress Analysis Report.Finite Element Analysis
ENOC-07-00002, Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 200628 February 2007Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 2006Fitness for Duty
ML06291043217 November 2006Final Response to Task Interface Agreement 2006-01 Related to the Adequacy of Emergency Diesel Generator and Shutdown Transformer Load Testing at Pilgrim Nuclear Power Station
ML0634804026 November 2006E-MAIL: (PD) Fwd: Entergy Nuclear Cultural Resources Protection Plan
ML0707901206 October 2006CR-PNP-2006-03702, an Issue Was Raised During the Region I Inspection for License Renewal Regarding the Expected Service Life of a Protective Coating for Buried Piping
ML0707901154 October 2006CR-PNP-2006-03677, Controls to Prevent and Monitor for Corrosion of the Drywell Shell Need to Be Assessed and StrengthenedAging Management