MONTHYEARML22335A2802022-11-0404 November 2022 11-4-2022 Email Transmitting Draft Questions Pertaining to Pilgrim ISFSI Exemption Request ML22270A0422022-09-26026 September 2022 Acknowledgement Email for Holtec'S Request for Reporting Exemption with Regards to the Pilgrim ISFSI Annual Radioactive Effluent Release Report (Docket No. 05000293) ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22007A2602021-12-0606 December 2021 E-mail from P. O'Brien, Holtec, to A. Snyder, NRC, on Pilgrim Effluent Discharge ML21287A6192021-10-14014 October 2021 E-mail from S. Phillips, MEMA, to A. Snyder, NRC, Pilgrim Nuclear Power Station, Commonwealth of Massachusetts Consultation Response to Amendment Review for Emergency Preparedness ML21266A2512021-09-23023 September 2021 Consultation with Commonwealth of Massachusetts Regarding Proposed Amendment Application for Emergency Plan and Emergency Action Levels ML21266A2772021-09-23023 September 2021 HDI Clarification of Exemption Requested from 10 CFR 20, Appendix G, Section Iii.E ML21267A0012021-09-23023 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance Review ML21257A3832021-09-15015 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Follow-on Request Re Request for Additional Information 2 Pilgrim - License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Pl ML21211A5912021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21211A5162021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Physical Security Plan ML21200A2352021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21200A1522021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim Isfi Only Physical Security Plan ML21176A1842021-06-25025 June 2021 Email from HDI Regarding Pilgrim Nuclear Power Station Training ML21180A0582021-06-17017 June 2021 Email from Region I Regarding Pilgrim Nuclear Power Station Inspection - EA-13-132 ML21097A0402021-04-0606 April 2021 E-Mail Consult with Commonwealth of Mass Re - Amendment Application - Physical Security Plan for the Pilgrim Nuclear Power Station L-20-092, Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B,2020-12-10010 December 2020 Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, L-20-096, Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 20102020-12-10010 December 2020 Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 2010 ML20328A2982020-11-16016 November 2020 Response from Commonwealth of Massachusetts on No Significant Hazard for Pilgrim ISFSI Amendment to Address ISFSI II Dated November 16, 2020 ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML20163A6802020-06-11011 June 2020 Confirmation of the Scope of the Requested Regulatory Relief for Pilgrim Security Qualifications ML20280A1912020-04-17017 April 2020 Request for Additional Information- Clarifying Information for Pilgrim ISFSI Physical Security Amendment Application ML20269A3542020-03-0505 March 2020 CFR 26.717 Reports 2019 Transmittal Email ML19336A0302019-11-27027 November 2019 OEDO-15-00479 - Re 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding ML19336A0332019-11-26026 November 2019 OEDO-15-00479 - E-mail to Petitioner - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding (CAC No. MF6460; EPID L-2015-CRS-0002)- Issuance of Final Director'S Decision ML19331A1952019-11-21021 November 2019 NRR E-mail Capture - (External_Sender) Pilgrim Nuclear Power Station - Commonwealth Consultation Response - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1732019-11-12012 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Cyber Security Plan ML19331A1642019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1792019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Emergency Planning Exemption CY-19-007, LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station2019-11-0404 November 2019 LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station ML19275H1962019-09-24024 September 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Consult with Commonwealth - Amendment Regarding Permanently Defueled Technical Specifications (PDTS) ML19239A0372019-08-26026 August 2019 E-mail from Entergy Dated August 26, 2019, Notification of Pilgrim License Transfer ML19239A0262019-08-23023 August 2019 LTR-19-0330 Janet Azarovitz, E-mail a Plea for More Time and Reasonable Discussion Including the Citizens of the Commonwealth in the Sale of the Pilgrim Nuclear Power Station ML19234A2072019-08-20020 August 2019 LTR-19-0328 Lawrence Delafield, President, Six Ponds Improv Assoc., Plymouth, Ma, Ltr Requests NRC to Postpone Consideration of Transferring the Licenses for the Pilgrim Nuclear Power Until the NRC Has Answered Concerns by Pilgrim Watch, Se ML19232A4032019-08-20020 August 2019 LTR-19-0322 Diane Turco, Director, Cape Downwinders, Massachusetts, Letter/E-mail Requests Suspension of the Pilgrim License Transfer from Entergy to Holtec Until the Adjudicatory Hearing Is Held and Raised Contentions Are Resolved ML19308A9942019-08-19019 August 2019 Entergy Nuclear Operations, Inc. Confirmatory Order Rescission Supplemental Information ML19226A3912019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Decommissioning Trust Fund Exemption (Holtec) ML19226A3962019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Conforming Amendment in Support of Pilgrim License Transfer Application ML19226A1212019-08-13013 August 2019 OEDO-15-00479-2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Status (CAC No. MF6460; EPID L-2015-CRS-0002) ML19227A1032019-08-0707 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Draft Wording for Potential Condition of License Transfer Order ML19207B3662019-07-26026 July 2019 NRR E-mail Capture - Pilgrim - RAI Direct and Indirect Transfer of Lic.; Conforming Lic. Amend.; Req. for Exemption 10 CFR 50.82(A)(8)(I)(A) for Holtec Decom. International, Llc ML19176A3452019-06-25025 June 2019 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Information (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) ML19154A0652019-06-0303 June 2019 NRR E-mail Capture - Pilgrim - Permanent Cessation of Power Operations ML19154A5242019-06-0303 June 2019 NRR E-mail Capture - RAI - Pilgrim Post-Decommissioning Technical Specifications (PDTS) License Amendment Request (LAR) ML19161A2122019-05-20020 May 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of License Amendment Request to Remove Cyber Security Plan Requirements ML19123A0332019-05-0101 May 2019 NRR E-mail Capture - Logbook Entry: 05/01/2019 Endangered Species Report Regarding a Confirmed Sighting of North Atlantic Right Whale(S) (Balaena Glacialis) ML19122A4912019-04-29029 April 2019 NRR E-mail Capture - Logbook Entry: 04/29/2019 Regarding the Confirmed Sighting of Ten North Atlantic Right Whales (Balaena Glacialis) ML19108A2372019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 50.54(w)(1) - On-Site Property Damage Insurance ML19108A2362019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance 2022-09-26
[Table view] Category:Report
MONTHYEARL-21-078, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2021-07-0606 July 2021 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML18158A1332018-06-0606 June 2018 Extent of Condition Review in Response to Findings Associated with Inspection 95003: Evaluation of NRC Assessment and Inspection Processes at Pilgrim Nuclear Power Station ML19056A1932017-08-17017 August 2017 Attachment 2 Design Input Record ML17212A5712017-07-28028 July 2017 Recovery Plan ML16153A3722016-06-20020 June 2016 Final ASP Analysis Pilgrim (LER 293-15-001) ML15043A7542015-03-24024 March 2015 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 1 of Order EA-13-109 (Severe Accident Capable Hardened Vents) ML15075A0822015-03-12012 March 2015 Entergy'S Required Response of the Near-Term Task Force Recommendation 2.1: Flooding-Hazard Reevaluation Report ML14294A5912014-11-0404 November 2014 Final ASP Analysis - Pilgrim Nuclear Power Station (LER 293-13-009) ML14171A2002014-06-26026 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (MF0264) ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML14324A0402014-04-17017 April 2014 HI-2104715, Seismic Analysis of the Loaded HI-TRAC in the SFP and SFP Slab Qualification. ML14092A0232014-03-31031 March 2014 Entergy'S Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima... ML13338A6672013-12-0909 December 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Pilgrim Nuclear Power Station, TAC No.: MF0777 ML13232A1322013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C85 of C413 Through Page C173 of C413 ML13232A1342013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C174 of C413 Through Page C250 of C413 ML13232A1352013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C251 of C413 Through Page C331 of C413 ML13232A1372013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C332 of C413 Through Page C413 of C413 ML13232A1382013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment D, Page D1 of D127 Through Page D73 of D127 ML13232A1402013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment D, Page D74 of D127 Through Attachment H, Page H12 of H12 ML13232A1412013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment I, Page I1 of I9 Through Attachment J, Page J77 of J134 ML13232A1312013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C1 of C413 Through Page C84 of C413 ML13232A1302013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment a Through Attachment B ML13232A1292013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment J, Page J78 of J134 Through End ML13232A1282013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page 37 of 37 ML12342A3862012-12-0606 December 2012 Fifth Ten-Year Inservice Testing Program and Request for Approval of IST Relief Requests, PR-03 and PR-05 ML12333A3212012-11-27027 November 2012 Flooding Walkdown Report - Entergy'S Response to NRC Request for Information Pursuant to 10CFR50.54(f) the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML12160A3712012-06-11011 June 2012 Review of 60-Day Response to Request for Information Regarding Recommendation 9.3, of the Near-Term Task Force Related to Fukushima Daiichi Nuclear Plant Accident ML13196A1892012-04-12012 April 2012 Email from B. Balsam, NRR to J. Crocker, NOAA Pilgrim: NRC Complete Responses to 4-9-12 NMFS Questions ML13196A2362012-04-12012 April 2012 Email from M. Smith, OGC to S. Uttal OGC Et Al., on Additional Pilgrim Exhibits ML12047A1192012-02-29029 February 2012 Request to Include Atlantic Sturgeon in Ongoing Informal Section 7 Consultation for Pilgrim Nuclear Power Station ML1204403512012-02-27027 February 2012 Acknowledgement of Withdrawal and Results of Acceptance Review Proposed License Amendment Request for Rod Withdrawal Minimizer Bypass Allowance to Allow Reactor Startup ML11346A5682011-12-0909 December 2011 Report Entitled - Regulatory Meltdown: How Four Nuclear Regulatory Commissioners Conspired to Delay and Weaken Nuclear Reactor Safety in the Wake of Fukushima ML1127000692011-09-26026 September 2011 Enclosure 2, Mfn 10-245 R4, Description of the Evaluation and Surveillance Recommendations for BWR/2-5 Plants ML14086A5022011-06-13013 June 2011 Enclosure 1 to PNPS Letter 2.14.027 - Entergy Nuclear Engineering Report No. PNPS-RPT-11-00001, Re-assessment of Pilgrim Seismic Core Damage Frequency ML1104203062011-01-31031 January 2011 GE Hitachi Nuclear Energy Report, NEDC-33532, Revision 2, Pilgrim Nuclear Power Station Safety Valve Setpoint Increase, Enclosure 4 to 2.11.007 ML1007704512010-03-31031 March 2010 NEDO-33532, Rev 0, Pilgrim Nuclear Power Station Safety Valve Setpoint Increase. ML1019004142009-03-12012 March 2009 Condition Report, CR-PNP-2009-00879 ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 ML0712300162007-05-0202 May 2007 FSEIS Reference - Nonradioactive Waste Information ML0712102522007-04-21021 April 2007 Weld Filler and Welding Electrode Materials for Structural Weld Overlays within the Scope of Pilgrim Relief Request, PRR-15 ML0711303842007-04-10010 April 2007 GE-NE-0000-0066-0380-R1-NP, Pilgrim Nuclear Power Station, Torsion Arm Clamp Stress Evaluation Report. ML0710802222007-04-10010 April 2007 Repair of the Core Shroud Stabilizer Assemblies - Torsion Arm Clamp Stress Evaluation Report ML0708701322007-03-22022 March 2007 Request for Authorization Under the Provision of 10 CFR 50.55a(a)(3)(i) for Modification of the Core Shroud Stabilizer Assemblies ML0708701342007-03-21021 March 2007 GE-NE-000-0064-9392-R2-NP, Pilgrim Unit 1, IGSCC Assessment of Shroud Repair X-750 Component Other than the Replacement Upper Support Assembly and Tie Rod Nut. ML0709303132007-03-14014 March 2007 GE-NE-0000-0061-6306-R4-NP, Pilgrim Nuclear Power Station, Shroud Repair Replacement Upper Support Assembly-Stress Analysis Report. ENOC-07-00002, Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 20062007-02-28028 February 2007 Units 1, 2 & 3; Pilgrim and Vermont - Fitness-for-Duty Program Performance Report for the Period July 2006 - December 2006 ML0629104322006-11-17017 November 2006 Final Response to Task Interface Agreement 2006-01 Related to the Adequacy of Emergency Diesel Generator and Shutdown Transformer Load Testing at Pilgrim Nuclear Power Station ML0634804022006-11-0606 November 2006 E-MAIL: (PD) Fwd: Entergy Nuclear Cultural Resources Protection Plan ML0707901202006-10-0606 October 2006 CR-PNP-2006-03702, an Issue Was Raised During the Region I Inspection for License Renewal Regarding the Expected Service Life of a Protective Coating for Buried Piping ML0707901152006-10-0404 October 2006 CR-PNP-2006-03677, Controls to Prevent and Monitor for Corrosion of the Drywell Shell Need to Be Assessed and Strengthened 2021-07-06
[Table view] Category:Technical
MONTHYEARML19056A1932017-08-17017 August 2017 Attachment 2 Design Input Record ML14294A5912014-11-0404 November 2014 Final ASP Analysis - Pilgrim Nuclear Power Station (LER 293-13-009) ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML14324A0402014-04-17017 April 2014 HI-2104715, Seismic Analysis of the Loaded HI-TRAC in the SFP and SFP Slab Qualification. ML14092A0232014-03-31031 March 2014 Entergy'S Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima... ML13338A6672013-12-0909 December 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Pilgrim Nuclear Power Station, TAC No.: MF0777 ML13232A1342013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C174 of C413 Through Page C250 of C413 ML13232A1282013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page 37 of 37 ML13232A1292013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment J, Page J78 of J134 Through End ML13232A1302013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment a Through Attachment B ML13232A1312013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C1 of C413 Through Page C84 of C413 ML13232A1322013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C85 of C413 Through Page C173 of C413 ML13232A1352013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C251 of C413 Through Page C331 of C413 ML13232A1372013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment C, Page C332 of C413 Through Page C413 of C413 ML13232A1382013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment D, Page D1 of D127 Through Page D73 of D127 ML13232A1402013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment D, Page D74 of D127 Through Attachment H, Page H12 of H12 ML13232A1412013-06-17017 June 2013 PNPS-CS-12-00001, Rev. 1, Pilgrim Station Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Attachment I, Page I1 of I9 Through Attachment J, Page J77 of J134 ML13196A2362012-04-12012 April 2012 Email from M. Smith, OGC to S. Uttal OGC Et Al., on Additional Pilgrim Exhibits ML12047A1192012-02-29029 February 2012 Request to Include Atlantic Sturgeon in Ongoing Informal Section 7 Consultation for Pilgrim Nuclear Power Station ML1204403512012-02-27027 February 2012 Acknowledgement of Withdrawal and Results of Acceptance Review Proposed License Amendment Request for Rod Withdrawal Minimizer Bypass Allowance to Allow Reactor Startup ML14086A5022011-06-13013 June 2011 Enclosure 1 to PNPS Letter 2.14.027 - Entergy Nuclear Engineering Report No. PNPS-RPT-11-00001, Re-assessment of Pilgrim Seismic Core Damage Frequency ML1104203062011-01-31031 January 2011 GE Hitachi Nuclear Energy Report, NEDC-33532, Revision 2, Pilgrim Nuclear Power Station Safety Valve Setpoint Increase, Enclosure 4 to 2.11.007 ML1007704512010-03-31031 March 2010 NEDO-33532, Rev 0, Pilgrim Nuclear Power Station Safety Valve Setpoint Increase. ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 ML0710802222007-04-10010 April 2007 Repair of the Core Shroud Stabilizer Assemblies - Torsion Arm Clamp Stress Evaluation Report ML0711303842007-04-10010 April 2007 GE-NE-0000-0066-0380-R1-NP, Pilgrim Nuclear Power Station, Torsion Arm Clamp Stress Evaluation Report. ML0708701322007-03-22022 March 2007 Request for Authorization Under the Provision of 10 CFR 50.55a(a)(3)(i) for Modification of the Core Shroud Stabilizer Assemblies ML0708701342007-03-21021 March 2007 GE-NE-000-0064-9392-R2-NP, Pilgrim Unit 1, IGSCC Assessment of Shroud Repair X-750 Component Other than the Replacement Upper Support Assembly and Tie Rod Nut. ML0709303132007-03-14014 March 2007 GE-NE-0000-0061-6306-R4-NP, Pilgrim Nuclear Power Station, Shroud Repair Replacement Upper Support Assembly-Stress Analysis Report. ML0634804022006-11-0606 November 2006 E-MAIL: (PD) Fwd: Entergy Nuclear Cultural Resources Protection Plan ML0707901742006-07-26026 July 2006 CR-PNP-2006-02799, Fair Amount of Water in Torus Room Floor ML0612206302006-04-26026 April 2006 License Renewal Audit and Review Plan for Plant Aging Management Review and Programs for the Pilgrim Nuclear Power Plant, Docket Number 50-293 ML0603000282006-01-25025 January 2006 2006/01/25-Pilgrim Nuclear Power Station License Renewal Application ML0707906472005-11-0101 November 2005 Procedure No. 2.1.8.7. Rev. 4, ASME Code Visual Examination of Primary Containment (Rtype H6.02) BVY 04-088, Fitness-for-Duty Program Performance Report for the Period January - June 20042004-08-30030 August 2004 Fitness-for-Duty Program Performance Report for the Period January - June 2004 ML0411704722004-03-0909 March 2004 Engineering Report No. PNPS-RPT-04-00001, Rev. 0, Risk Impact Assessment of Extending Containment Type a Test Interval. ML0802902312004-02-12012 February 2004 Westinghouse Technical Bulletin: Information Regarding Recent Crossflow Ultrasonic Flow Measurement System Performance Observations, TB-04-4 ML0305202692003-02-15015 February 2003 Follow-up Report, Reference Event #39516 ML0212302992002-03-25025 March 2002 Transmittal of Written Summary of Recent Reactor Water Level Indication Issues at Pilgrim Nuclear Power Station NRC Generic Letter 1979-451979-09-25025 September 1979 NRC Generic Letter 1979-045: Transmittal of Reports Regarding Foreign Reactor Operation Experiences 2017-08-17
[Table view] |
Text
Alicia Williamson - Fwd: Entergy.Nuclear Cultural Resources Protection Plan Page.1 j From: Jennifer Davis To: Alicia Williamson Date: 11/06/2006 7:50:19 AM
Subject:
Fwd: Entergy Nuclear Cultural Resources Protection Plan See attached email for procedure.
c:.\temp\ywvuuufl. I MH Page 1 i Mail Envelope Properties (454F2F84.7DF: 6: 44096)
Subject:
Fwd: Entergy Nuclear Cultural Resources Protection Plan Creation Date 11/06/2006 7:50:12 AM From: Jennifer Davis Created By: JXD1O@nrc.gov Recipients nrc.gov TWGWPO04.HQGWDOO1 ARWI (Alicia Williamson)
Post Office Route TWGWPO04.HQGWDO01 nrc.gov Files Size Date & Time MESSAGE 340 11/06/2006 7:50:12 AM Mail Options Expiration Date: None Priority: Standard ReplyRequested: No Return Notification: None Concealed
Subject:
No Security: Standard Junk Mail Handling Evaluation Results Message is not eligible for Junk Mail handling Message is from an internal sender Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled
SAlicia Williamson - EN-EV-121,_Cultural Resources_.pdf dPage
Title:
Cultural Resources Protection Plan Procedure Owner: Rick N. Buckley / Corporate Environmental Chairman (Print Name /_Title)
Approved: I'J. " ,11/01/06 1 (Procedure Owner Signature) (Date)
EN Common 11/03/06 ANO 01/01/07 PNPS ENN Effective ECH VY Effective ENS Date [ G9 VY Date Exception IPEC W3 JAF WPO Procedure Contains NMM REFLIB Forms: YES [ NO'-
Basis Statement This procedure provides a mechanism for protecting historical and archaeological areas located on Entergy's nuclear site properties.
Site and NMM Procedures Cancelled or Superseded ByThis Revision ANO Procedure 1000.167, ANO Historical and Archaeological Preservation Prograim will be cancelled.
Process Apolicahility Exclusion (ENN-LI-100Q) / Programmatic Exclusion (ENS-LI- 101i All Sites: Z Specific Sites: ANO El GGNS El IPECQI JAF [I PNPSE] RBS E-vY [I W3 El
Alicia Williamson - EN-EV-121 Cultural Resources_.pdt Page21 NUCLEAR NON-QUALITY RELATED EN-EV-121 REV. 0 E,nfero MANAGEMENT MANUAL INFORMATIONAL WSE PAGE 2 OF 12 Cultural Resources Protection Plan TABLE OF CONTENTS Section Title PaQe 1.0 PURPOSE ......................................................................... 3
2.0 REFERENCES
................................................................ 3 3.0 DEFINITIONS .................................................................... 4 4.0 RESPONSIBILITIES ......................................................... 5 5.0 DETAILS ......................................................................... 5 5.1 Precautions and Umitations ..................................... 5 5.2 Land Disturbance of Undisturbed Areas ................... 5 5.3 Modificatiorn/Rem odeling of Cultural Resource Structures ............................................................ 6 5.4 Routine Surveillances .......................... 7 5.5 Special Protection Measures .................................. 8 5.6 R ecords .............................................................. 8 6.0 INTERFACES ................................................................... 9 7.0 RECORDS ...................................................................... 9 8.0 OBLIGATION AND REGULATORY COMMITMENT CROSS-REFERENCES ........................................................ 9 9.0 ATTACHMENTS .............................................................. 9 ATTACHMENT 9.1 LAND DISTURBANCE ENVIRONMENTAL REvIEw FORM (TYPICAL) ............................................................ . 10 ATTACHMENT 9.2 CULTURAL RESOURCE STRUCTURE MODIFICATION/
REMODELING REvIEw FORM (TYPICAL) ......................... 12
Alicia Williamson - EN-EV-1 21 -Cultural Resources-.pdf Page 3 ýj EN --E --2 -- -eorepfPg Alicia Williamson~~~~~- u-----a~~~~
1.0 PURPOSE
[1] Provides a mechanism to protect either existing or potentially existing cultural resources located at the Entergy Nuclear sites.
2.0 REFERENCES
[1] Regulatory References (a) National Historic Preservation Act (and amendments)
[2] Company References (a) NMM Procedure EN-EV-115. Environmental Reviews and Evaluations (b) NMM Procedure EN-IS-112, Trenching, Excavation and Ground Penetrating Activities
[3] ANO References (a) FTN Letter No. 6045-061, "Cultural Resources Issues,.ANO (b) Commitment 1CAN090005, Reference P-17051, "Develop an administrative level enviironmental procedure to provide additional control over future land disturbances atANO site"
[4] JAF References (a) Letter from Nancy Herter, New York State Office of Parks, Recreation and Historic Preservation, to T. A. Sullivan, James A, Fitzpatrick, dated April 27, 2006 (refer to Attachment C of License Renewal Environmental Report)
[5] PNPS References (a) Letter from Eric S. Johnson, Massachusetts Historical Commission, to Stephen Bethay, Pilgrim Nuclear Power Station, dated March 14, 2005 (refer to Attachment C of License Renewal Environmental Report)
[6] VYN PS References (a) 30 V.S.A. § 248, New Gas and Electric Purchases, Investments and Facilities; Certificate of Public Good
Alca Williamson - EN-EV-121 _Cultural Resources_.pdf Page4p NUCLEAR NON-QUALITY RELATED EN-EV-121 REV. 0 SEntergy MANAGEMENT MANUAL INFORMATIONALUSE PAGE 4 OF 12 Cultural Resources Protection Plan 2.0 cont (b) Letter from Jane Lendway, Vermont Division for Historic Preservation, to Gary Tucker, FTN Associates, LTD., dated October 17, 2005 (refer to Attachment C of License Renewal Environmental Report)
[7] W3 References (a) W3 Cultural Resources Protection Plan 3.0 DEFINITIONS
[1] Disturbed Land Areas - Surface and/or subsurface land areas that were significantly disturbed during the construction phase of the site (i.e., plant's protected area).
[21 Cultural Resources - Resources that include but are not limited to:
(a) Cemeteries, burial sites, funeral monuments, or other sites with human remains (b) Historic buildings, structures, or building remains (c) Ancient sites containing cultural artifacts such as pottery, tools, weaponry, and other implements (d) Ritual artifacts (e) Discarded materials (i.e. Indian mounds with shells and animal bones)
(f) Sites of historical significance to the community, state, or nation, such as battlegrounds, encampments, villages, etc.
(g) Traditional cultural properties.
[3] Land-Disturbing Activities- Activities that involve grading, construction of buildings, excavations, reforestation, landscaping, placement of any fill or spoil or other terrestrial impact.
[4] Undisturbed Land Areas - Surface and/or subsurface land areas that have not been disturbed either during the construction phase of the site orduring current operations, or if there is uncertainty atthe site about the degree ofdisturbance.
ý Alicia Williamson - EN-,EV-121 -Cultural Resources-pcif Page 5 11 LAlicia Williamson - EN-EV-121 _Cultural Resources_.pdf Page 5~
4.0 RESPONSIBILITIES
[1] Enterov Nuclear Environmental Focus Group - is responsible for maintaining, reviewing and interpreting this procedure.
[2] Site Environmental Representatives -are responsible for:
(a) Conducting environmental reviews of land disturbance activities in accordance with this procedure to ensure either existing or potentially existing cultural resources are protected to the maximum extent practicable.
(b) Ensuring that the State Historic Preservation Office (SHPO) is notified for activities that may affect existing or potentially existing cultural resources, if required by specific state laws, SH PO, operating license conditions or site reporting procedures.;
[3] Site Departments - are responsible for complying with Sections 5.1 through 5.3 of this procedure.
[4] Contract Managers and Contractors -are responsible for complying with Sections 5.1 through 5.3 of this procedure.
5.0 DETAILS 5.1 PRECAUTIONS AND LIMITATIONS
[1] Land disturbing activities must be stopped immediately in the event that there is evidence of a historical or archaeologica I artifact and the SH PO notified for guidance prior to re-commencing land disturbing activities.
5.2 LAND DISTURBANCE OF UNDISTURBED AREAS NOTE Ifthe land disturbance activity is occurring within the Protected Area Fence that encloses the power block area, then no further actions are required regarding this procedure.
[1] Site Departments, Contract Managers and Contractors, for activities involving land disturbance in undisturbed areas are to:
I'Alicia Williamson - EN-EV-121 _Cultural Resources_.pdf Page 6 il 5.2 cont (a) Complete Section A of Attachment 9.1 to this procedure (Land Disturbance Environmental Review Form) and forward to the Site Environmental Representative for review.
(b) Obtain approval from the Site Environmental Representative prior to the activity commencing.
(c) Adhere to the management requirements identified in Section C of Attachment 9.1 (Land Disturbance Environmental Review Form), as applicable to the land disturbance activity.
[2] Site Environmental Representative, upon receipt of Attachment 9.1 (Land Disturbance Environmental Review Form), is to:
(a) Contact SH PO for activities that may affect existing or potentially existing cultural resources.
(b) Complete Section B of the Form and if applicable Section C.
(c) If approved, return a copy of the completed Form to the requester.
(d) If not approved, notify the requestor of the reasons for denying the approval.
(e) Maintain copies of the required documents on file.
(f) Conduct periodic visual observations of the area to ensure that any management requirements identified in Section C of Attachment 9.1 (Land Disturbance Environmental Review Form) are followed.
(g) Ensure that mitigation measures are implemented as appropriate.
5,3 MODFICATION/REMO DELING OF CULTURAL RESOURCE STRUCTURES
[1] Site Departments, Contract Managers and Contractors, for activities involving modifications/re modeling to cultural resource structures are to:
(a) Complete Section A of Attachment 9.2 to this procedure (Cultural Resource Structure Modification/Rem odeling Review Form) and forward to the Site Environmental Representative for review.
ýAlicia Williamson - EN-EV-121 Cultural Resources_.pdf Page 7j']
L.A~cia Williamson EN-EV-i 21 _Cultural Resources_.pdf Page 7 I 5.3 cont (b) Obtain approval from the Site Environmental Representative prior to the activity commencing.
(c) If applicable, adhere to the management requirements identified in Section C of Attachment 9.2 (Cultural Resource Structure Modification/Rem odeling Review Form).
[2] Site Environmental Representative, upon receipt of Attachment 9.2 (Cultural Resource Structure Modification/Rem odeling Review Form) is to:
(a) Contact SH PO to inform them of the activity.
(b) Complete Section B of the Form and if applicable Section C.
(c) If approved, return a copy of the completed Form to the requester.
(d) If not approved, notify the requestor of the reasons for denying the approval.
(e) Maintain copies of the required documents on file.
(f) Conduct periodic visual observations of the area to ensure that any management requirements imposed by SH PO are followed.
(g) Ensure that mitigation measures are implemented as appropriate.
5.4 ROUTINE SURVEILLANCES
[1] The Site Environmental Representative should:
(a) Conduct periodic environmental rounds to ensure that no unauthorized activities occur that could damage existing or potentially existing culturally protected resources.
(b) Notify the SHPOand the NRC ifground disturbing activities are discovered within an existing or potentially existing culturally protected resource area, if required by operating license conditions, SH PO or site reporting requirements.
(c) Obtain a certified archaeologist to conduct a damage assessment of the affected area, if deemed necessary.
Alicia Williamson - EN-EV-1 21 -Cultural Resources-.pdf -Vaq-6411
[Alicia Williamson EN-EV-121 _Cultural Resources_.pdf Page 81 5.5 SPECIAL PROTECTION PROCEDURES
[1] Should the site find it necessary to conduct any activities within a culturally protected area and if required by operating license conditions, SHPOorsite procedures, the Environmental Site Representative should notify the SHPO and NRC in writing of the proposed activity. The notification should include, but not limited to:
, Adescription of the proposed activity.
° Description for the need for the activity.
, A map showing the location of the planned activity in relation the culturally protected areas.
, A demonstration for the need to perform the activity within the culturally protected area.
[2] The NRC, after consultation with the SHPO, will advise the site whether or not a mitigation plan is required.
5.6 RECORDS NOTE Ifthe cultural resources review is performed as a result of an EN-EV-115 review, then the forms generated via this procedure should be filed with the EN-EV-15 screening paperwork.
[1] Site Environmental Representative should maintain the following documents on file:
(a) Completed Land Disturbance Environmental Review Forms (Attachment 9.1 to this procedure).
(b) Completed Cultural Resource Structure Modification/Rem odeling Review Forms (Attachment 9.2 to this procedure).
(c) Conversation and correspondence records involving the State Historic Preservation Office and/or NRC.
(d) Records of modification/rem odeling activities associated with cultural resource structures.
Alicia Williamson - EN-EV-1 21 -Cultural Resources-.pdf Page 9 11
[Alicia Williamson EN-EV-121 _Cultural Resources_.pdf Page 9~I L 6.0 INTERFACES
[1] NMM Procedure EN-IS-112, Trenching, Excavation and Ground Penetrating Activities
[21 NMM Procedure EN-EV-115, Environmental Reviews and Evaluations 7.0 RECORDS None 8.0 OBLIGATION AND REGULATORY COMMITMENT CROSS-REFERENCES 8.1 OBLIGATIONS AND COMMITMENTS IMPLEMENTED OVERALL None 8.2 SECTION SPECIFIC OBLIGATIONS AND COMMITMENTS None 8.3 SITE SPECIFIC COMMITMENTS I Stepelsite IDocument ICommitment Number or Reference
[1] ANO 1CAN090005 P-1 7051 9.0 ATTACHMENTS 9.1 Land Disturbance Environmental Review Form (Typical) 9.2 Cultural Resource Structure Modification/Rem odeling Review Form (Typical)
Alicia Williamson EN-EV-121
. _Cultural Resources_.pdf NUCLEAR NON-QUALITY RELATED EN-EV-121 REV. 0 ntergy MANAGEMENT MANUAL INFORMATIONAL USE PAGE 10 OF 12 Cultural Resources Protection Plan ATTACHMENT 9.1 LAND DISTURBANCE ENVIRONMENTAL REVIEW FORM (TYPICAL)
SHEET 1 of 2 A. Land Disturbance Activity
- 1. Brief Description of Activity:
- 2. Amount of Land Involved:
1 Acre 1 - 5 Acres
>5 Acres
- 3. Location of Affected Land Area (attach map also):
4.. Expected Duration of Activity:
B. Environmental Review
- 1. Consultation with the State Historic Preservation Office Required: El Yes [] No
- 2. SHPO Protection Measures Imposed: Li Yes E] No E] Not Applicable
- 3. Existing historical or archaeological sites: LI Yes -- No
- 4. Visual Walk-down of Land Area Required: LI Yes LI No
- 5. Date(s) of Visual Walk-down:
- 6. Potential historical or archaeological site(s) Identified during Walk-down:
E] Yes E] No [] Not Applicable
[Alicia Williamson - EN-EV-121 _Cultural Resources_.pdf oP.a~ge 11 '
ATTACHMENT 9.1 LAND DISTURBANCE ENVIRONMENTAL REVIEW FORM (TYPICAL)
SHEET 2 of 2 C. Required Management Practices Management Practice(s) Yes No NA Stop the activity if a potential historical or archaeologica I E -
site is discovered or if an existing site is damaged.
Notify the Site Environmental Representative LI LI [L immediately in the event that a potential historical or archaeological site is discovered during the land disturbance activity.
In the event that a potential historical or archaeologica I El E] El artifact is discovered, do not resume the land disturbance activity until the Site Environmental Representative has performed an evaluation.
Place a protective barrier around existing historic or El El El archaeological site(s).
Notify the Site Environmental Representative 1 El El]
immediately in the event that an existing historical or archaeological site is damaged during the land disturbance activity.
Measures:
0 11 D +
0 -Ja
+; 1 I.a avIa
- 14
+k LIa
+
a I,; + ; I IorJ s I.ca or 11 al 1.4 ar e 1 ; I ;+
caULJ.II, s eII may ex2 SAL VVUUU 1A k e
L e presence of pottery, glass, arrowhead, bones, tools, weaponry, wooden or metal Protective structures, flakes. brick, mortar or olaster.
SHPO SHPO Protective Measures: __________________________
Approved By: I Signature Date
Alicia Williamson - EN-EV-1 21 -Cultural Resources-.pdt Page 12 :ý I..... ....
c a...................am.............
. . . .. ultura
.................. sou rce s_.p d.....
.. ..l...............Re
.............. f ... . .......... ................... P age.... ...
ATTACHMENT 9.2 C ULTURALRESOURCE STRUCTUREMODIFICATION/REMODELING REVIEW FORM (TYPICAL)
SHEET 1 of 1 A. Modification/Remodeling Activity
- 1. Description of Activity:
- 2. Expected Duration of Activity:
B. Environmental Review
- 1. SHPO Contacted: L] Yes [- No
- 2. Date SHPO Contacted:
- 3. SHPO Protective Measures Imposed: ED Yes LI No C. SHPO Protective Measures (if applicable)
Aporoved I I By:
J /
Signature Date