Alicia Williamson - Fwd: Entergy.Nuclear Cultural Resources Protection Plan Page.1 j From: Jennifer Davis To: Alicia Williamson Date: 11/06/2006 7:50:19 AM

Subject:

Fwd: Entergy Nuclear Cultural Resources Protection Plan See attached email for procedure.

c:.\temp\ywvuuufl. I MH Page 1 i Mail Envelope Properties (454F2F84.7DF: 6: 44096)

Subject:

Fwd: Entergy Nuclear Cultural Resources Protection Plan Creation Date 11/06/2006 7:50:12 AM From: Jennifer Davis Created By: JXD1O@nrc.gov Recipients nrc.gov TWGWPO04.HQGWDOO1 ARWI (Alicia Williamson)

Post Office Route TWGWPO04.HQGWDO01 nrc.gov Files Size Date & Time MESSAGE 340 11/06/2006 7:50:12 AM Mail Options Expiration Date: None Priority: Standard ReplyRequested: No Return Notification: None Concealed

Subject:

No Security: Standard Junk Mail Handling Evaluation Results Message is not eligible for Junk Mail handling Message is from an internal sender Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled

SAlicia Williamson - EN-EV-121,_Cultural Resources_.pdf dPage

Title:

Cultural Resources Protection Plan Procedure Owner: Rick N. Buckley / Corporate Environmental Chairman (Print Name /_Title)

Approved: I'J. " ,11/01/06 1 (Procedure Owner Signature) (Date)

EN Common 11/03/06 ANO 01/01/07 PNPS ENN Effective ECH VY Effective ENS Date [ G9 VY Date Exception IPEC W3 JAF WPO Procedure Contains NMM REFLIB Forms: YES [ NO'-

Basis Statement This procedure provides a mechanism for protecting historical and archaeological areas located on Entergy's nuclear site properties.

Site and NMM Procedures Cancelled or Superseded ByThis Revision ANO Procedure 1000.167, ANO Historical and Archaeological Preservation Prograim will be cancelled.

Process Apolicahility Exclusion (ENN-LI-100Q) / Programmatic Exclusion (ENS-LI- 101i All Sites: Z Specific Sites: ANO El GGNS El IPECQI JAF [I PNPSE] RBS E-vY [I W3 El

Alicia Williamson - EN-EV-121 Cultural Resources_.pdt Page21 NUCLEAR NON-QUALITY RELATED EN-EV-121 REV. 0 E,nfero MANAGEMENT MANUAL INFORMATIONAL WSE PAGE 2 OF 12 Cultural Resources Protection Plan TABLE OF CONTENTS Section Title PaQe 1.0 PURPOSE ......................................................................... 3

2.0 REFERENCES

................................................................ 3 3.0 DEFINITIONS .................................................................... 4 4.0 RESPONSIBILITIES ......................................................... 5 5.0 DETAILS ......................................................................... 5 5.1 Precautions and Umitations ..................................... 5 5.2 Land Disturbance of Undisturbed Areas ................... 5 5.3 Modificatiorn/Rem odeling of Cultural Resource Structures ............................................................ 6 5.4 Routine Surveillances .......................... 7 5.5 Special Protection Measures .................................. 8 5.6 R ecords .............................................................. 8 6.0 INTERFACES ................................................................... 9 7.0 RECORDS ...................................................................... 9 8.0 OBLIGATION AND REGULATORY COMMITMENT CROSS-REFERENCES ........................................................ 9 9.0 ATTACHMENTS .............................................................. 9 ATTACHMENT 9.1 LAND DISTURBANCE ENVIRONMENTAL REvIEw FORM (TYPICAL) ............................................................ . 10 ATTACHMENT 9.2 CULTURAL RESOURCE STRUCTURE MODIFICATION/

REMODELING REvIEw FORM (TYPICAL) ......................... 12

Alicia Williamson - EN-EV-1 21 -Cultural Resources-.pdf Page 3 ýj EN --E --2 -- -eorepfPg Alicia Williamson~~~~~- u-----a~~~~

1.0 PURPOSE

[1] Provides a mechanism to protect either existing or potentially existing cultural resources located at the Entergy Nuclear sites.

2.0 REFERENCES

[1] Regulatory References (a) National Historic Preservation Act (and amendments)

[2] Company References (a) NMM Procedure EN-EV-115. Environmental Reviews and Evaluations (b) NMM Procedure EN-IS-112, Trenching, Excavation and Ground Penetrating Activities

[3] ANO References (a) FTN Letter No. 6045-061, "Cultural Resources Issues,.ANO (b) Commitment 1CAN090005, Reference P-17051, "Develop an administrative level enviironmental procedure to provide additional control over future land disturbances atANO site"

[4] JAF References (a) Letter from Nancy Herter, New York State Office of Parks, Recreation and Historic Preservation, to T. A. Sullivan, James A, Fitzpatrick, dated April 27, 2006 (refer to Attachment C of License Renewal Environmental Report)

[5] PNPS References (a) Letter from Eric S. Johnson, Massachusetts Historical Commission, to Stephen Bethay, Pilgrim Nuclear Power Station, dated March 14, 2005 (refer to Attachment C of License Renewal Environmental Report)

[6] VYN PS References (a) 30 V.S.A. § 248, New Gas and Electric Purchases, Investments and Facilities; Certificate of Public Good

Alca Williamson - EN-EV-121 _Cultural Resources_.pdf Page4p NUCLEAR NON-QUALITY RELATED EN-EV-121 REV. 0 SEntergy MANAGEMENT MANUAL INFORMATIONALUSE PAGE 4 OF 12 Cultural Resources Protection Plan 2.0 cont (b) Letter from Jane Lendway, Vermont Division for Historic Preservation, to Gary Tucker, FTN Associates, LTD., dated October 17, 2005 (refer to Attachment C of License Renewal Environmental Report)

[7] W3 References (a) W3 Cultural Resources Protection Plan 3.0 DEFINITIONS

[1] Disturbed Land Areas - Surface and/or subsurface land areas that were significantly disturbed during the construction phase of the site (i.e., plant's protected area).

[21 Cultural Resources - Resources that include but are not limited to:

(a) Cemeteries, burial sites, funeral monuments, or other sites with human remains (b) Historic buildings, structures, or building remains (c) Ancient sites containing cultural artifacts such as pottery, tools, weaponry, and other implements (d) Ritual artifacts (e) Discarded materials (i.e. Indian mounds with shells and animal bones)

(f) Sites of historical significance to the community, state, or nation, such as battlegrounds, encampments, villages, etc.

(g) Traditional cultural properties.

[3] Land-Disturbing Activities- Activities that involve grading, construction of buildings, excavations, reforestation, landscaping, placement of any fill or spoil or other terrestrial impact.

[4] Undisturbed Land Areas - Surface and/or subsurface land areas that have not been disturbed either during the construction phase of the site orduring current operations, or if there is uncertainty atthe site about the degree ofdisturbance.

ý Alicia Williamson - EN-,EV-121 -Cultural Resources-pcif Page 5 11 LAlicia Williamson - EN-EV-121 _Cultural Resources_.pdf Page 5~

4.0 RESPONSIBILITIES

[1] Enterov Nuclear Environmental Focus Group - is responsible for maintaining, reviewing and interpreting this procedure.

[2] Site Environmental Representatives -are responsible for:

(a) Conducting environmental reviews of land disturbance activities in accordance with this procedure to ensure either existing or potentially existing cultural resources are protected to the maximum extent practicable.

(b) Ensuring that the State Historic Preservation Office (SHPO) is notified for activities that may affect existing or potentially existing cultural resources, if required by specific state laws, SH PO, operating license conditions or site reporting procedures.;

[3] Site Departments - are responsible for complying with Sections 5.1 through 5.3 of this procedure.

[4] Contract Managers and Contractors -are responsible for complying with Sections 5.1 through 5.3 of this procedure.

5.0 DETAILS 5.1 PRECAUTIONS AND LIMITATIONS

[1] Land disturbing activities must be stopped immediately in the event that there is evidence of a historical or archaeologica I artifact and the SH PO notified for guidance prior to re-commencing land disturbing activities.

5.2 LAND DISTURBANCE OF UNDISTURBED AREAS NOTE Ifthe land disturbance activity is occurring within the Protected Area Fence that encloses the power block area, then no further actions are required regarding this procedure.

[1] Site Departments, Contract Managers and Contractors, for activities involving land disturbance in undisturbed areas are to:

I'Alicia Williamson - EN-EV-121 _Cultural Resources_.pdf Page 6 il 5.2 cont (a) Complete Section A of Attachment 9.1 to this procedure (Land Disturbance Environmental Review Form) and forward to the Site Environmental Representative for review.

(b) Obtain approval from the Site Environmental Representative prior to the activity commencing.

(c) Adhere to the management requirements identified in Section C of Attachment 9.1 (Land Disturbance Environmental Review Form), as applicable to the land disturbance activity.

[2] Site Environmental Representative, upon receipt of Attachment 9.1 (Land Disturbance Environmental Review Form), is to:

(a) Contact SH PO for activities that may affect existing or potentially existing cultural resources.

(b) Complete Section B of the Form and if applicable Section C.

(c) If approved, return a copy of the completed Form to the requester.

(d) If not approved, notify the requestor of the reasons for denying the approval.

(e) Maintain copies of the required documents on file.

(f) Conduct periodic visual observations of the area to ensure that any management requirements identified in Section C of Attachment 9.1 (Land Disturbance Environmental Review Form) are followed.

(g) Ensure that mitigation measures are implemented as appropriate.

5,3 MODFICATION/REMO DELING OF CULTURAL RESOURCE STRUCTURES

[1] Site Departments, Contract Managers and Contractors, for activities involving modifications/re modeling to cultural resource structures are to:

(a) Complete Section A of Attachment 9.2 to this procedure (Cultural Resource Structure Modification/Rem odeling Review Form) and forward to the Site Environmental Representative for review.

ýAlicia Williamson - EN-EV-121 Cultural Resources_.pdf Page 7j']

L.A~cia Williamson EN-EV-i 21 _Cultural Resources_.pdf Page 7 I 5.3 cont (b) Obtain approval from the Site Environmental Representative prior to the activity commencing.

(c) If applicable, adhere to the management requirements identified in Section C of Attachment 9.2 (Cultural Resource Structure Modification/Rem odeling Review Form).

[2] Site Environmental Representative, upon receipt of Attachment 9.2 (Cultural Resource Structure Modification/Rem odeling Review Form) is to:

(a) Contact SH PO to inform them of the activity.

(b) Complete Section B of the Form and if applicable Section C.

(c) If approved, return a copy of the completed Form to the requester.

(d) If not approved, notify the requestor of the reasons for denying the approval.

(e) Maintain copies of the required documents on file.

(f) Conduct periodic visual observations of the area to ensure that any management requirements imposed by SH PO are followed.

(g) Ensure that mitigation measures are implemented as appropriate.

5.4 ROUTINE SURVEILLANCES

[1] The Site Environmental Representative should:

(a) Conduct periodic environmental rounds to ensure that no unauthorized activities occur that could damage existing or potentially existing culturally protected resources.

(b) Notify the SHPOand the NRC ifground disturbing activities are discovered within an existing or potentially existing culturally protected resource area, if required by operating license conditions, SH PO or site reporting requirements.

(c) Obtain a certified archaeologist to conduct a damage assessment of the affected area, if deemed necessary.

Alicia Williamson - EN-EV-1 21 -Cultural Resources-.pdf -Vaq-6411

[Alicia Williamson EN-EV-121 _Cultural Resources_.pdf Page 81 5.5 SPECIAL PROTECTION PROCEDURES

[1] Should the site find it necessary to conduct any activities within a culturally protected area and if required by operating license conditions, SHPOorsite procedures, the Environmental Site Representative should notify the SHPO and NRC in writing of the proposed activity. The notification should include, but not limited to:

, Adescription of the proposed activity.

° Description for the need for the activity.

, A map showing the location of the planned activity in relation the culturally protected areas.

, A demonstration for the need to perform the activity within the culturally protected area.

[2] The NRC, after consultation with the SHPO, will advise the site whether or not a mitigation plan is required.

5.6 RECORDS NOTE Ifthe cultural resources review is performed as a result of an EN-EV-115 review, then the forms generated via this procedure should be filed with the EN-EV-15 screening paperwork.

[1] Site Environmental Representative should maintain the following documents on file:

(a) Completed Land Disturbance Environmental Review Forms (Attachment 9.1 to this procedure).

(b) Completed Cultural Resource Structure Modification/Rem odeling Review Forms (Attachment 9.2 to this procedure).

(c) Conversation and correspondence records involving the State Historic Preservation Office and/or NRC.

(d) Records of modification/rem odeling activities associated with cultural resource structures.

Alicia Williamson - EN-EV-1 21 -Cultural Resources-.pdf Page 9 11

[Alicia Williamson EN-EV-121 _Cultural Resources_.pdf Page 9~I L 6.0 INTERFACES

[1] NMM Procedure EN-IS-112, Trenching, Excavation and Ground Penetrating Activities

[21 NMM Procedure EN-EV-115, Environmental Reviews and Evaluations 7.0 RECORDS None 8.0 OBLIGATION AND REGULATORY COMMITMENT CROSS-REFERENCES 8.1 OBLIGATIONS AND COMMITMENTS IMPLEMENTED OVERALL None 8.2 SECTION SPECIFIC OBLIGATIONS AND COMMITMENTS None 8.3 SITE SPECIFIC COMMITMENTS I Stepelsite IDocument ICommitment Number or Reference

[1] ANO 1CAN090005 P-1 7051 9.0 ATTACHMENTS 9.1 Land Disturbance Environmental Review Form (Typical) 9.2 Cultural Resource Structure Modification/Rem odeling Review Form (Typical)

Alicia Williamson EN-EV-121

. _Cultural Resources_.pdf NUCLEAR NON-QUALITY RELATED EN-EV-121 REV. 0 ntergy MANAGEMENT MANUAL INFORMATIONAL USE PAGE 10 OF 12 Cultural Resources Protection Plan ATTACHMENT 9.1 LAND DISTURBANCE ENVIRONMENTAL REVIEW FORM (TYPICAL)

SHEET 1 of 2 A. Land Disturbance Activity

1. Brief Description of Activity:
2. Amount of Land Involved:

1 Acre 1 - 5 Acres

>5 Acres

3. Location of Affected Land Area (attach map also):

4.. Expected Duration of Activity:

B. Environmental Review

1. Consultation with the State Historic Preservation Office Required: El Yes [] No
2. SHPO Protection Measures Imposed: Li Yes E] No E] Not Applicable
3. Existing historical or archaeological sites: LI Yes -- No
4. Visual Walk-down of Land Area Required: LI Yes LI No
5. Date(s) of Visual Walk-down:
6. Potential historical or archaeological site(s) Identified during Walk-down:

E] Yes E] No [] Not Applicable

[Alicia Williamson - EN-EV-121 _Cultural Resources_.pdf oP.a~ge 11 '

ATTACHMENT 9.1 LAND DISTURBANCE ENVIRONMENTAL REVIEW FORM (TYPICAL)

SHEET 2 of 2 C. Required Management Practices Management Practice(s) Yes No NA Stop the activity if a potential historical or archaeologica I E -

site is discovered or if an existing site is damaged.

Notify the Site Environmental Representative LI LI [L immediately in the event that a potential historical or archaeological site is discovered during the land disturbance activity.

In the event that a potential historical or archaeologica I El E] El artifact is discovered, do not resume the land disturbance activity until the Site Environmental Representative has performed an evaluation.

Place a protective barrier around existing historic or El El El archaeological site(s).

Notify the Site Environmental Representative 1 El El]

immediately in the event that an existing historical or archaeological site is damaged during the land disturbance activity.

Measures:

0 11 D +

0 -Ja

+; 1 I.a avIa

14

+k LIa

+

a I,; + ; I IorJ s I.ca or 11 al 1.4 ar e 1  ; I  ;+

caULJ.II, s eII may ex2 SAL VVUUU 1A k e

L e presence of pottery, glass, arrowhead, bones, tools, weaponry, wooden or metal Protective structures, flakes. brick, mortar or olaster.

SHPO SHPO Protective Measures: __________________________

Approved By: I Signature Date

Alicia Williamson - EN-EV-1 21 -Cultural Resources-.pdt Page 12 :ý I..... ....

c a...................am.............

. . . .. ultura

.................. sou rce s_.p d.....

.. ..l...............Re

.............. f ... . .......... ................... P age.... ...

ATTACHMENT 9.2 C ULTURALRESOURCE STRUCTUREMODIFICATION/REMODELING REVIEW FORM (TYPICAL)

SHEET 1 of 1 A. Modification/Remodeling Activity

1. Description of Activity:
2. Expected Duration of Activity:

B. Environmental Review

1. SHPO Contacted: L] Yes [- No
2. Date SHPO Contacted:
3. SHPO Protective Measures Imposed: ED Yes LI No C. SHPO Protective Measures (if applicable)

Aporoved I I By:

J /

Signature Date