L-19-003, (PNPS) - Transmittal of Revision to 10 CFR 50.54(q) Review for EP-PP-01, PNPS Emergency Plan Revision 51

From kanterella
Jump to navigation Jump to search
(PNPS) - Transmittal of Revision to 10 CFR 50.54(q) Review for EP-PP-01, PNPS Emergency Plan Revision 51
ML19295E559
Person / Time
Site: Pilgrim
Issue date: 10/16/2019
From: Brian Sullivan
Holtec Decommissioning International
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML19295E615 List:
References
HDI-PIL-19-003
Download: ML19295E559 (1)


Text

HOLTEC**

DECOMMISSIONING INTERNATIONAL Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 September 16, 2019 ATTN: Document Control Desk U.S. Nuclear Regulatory'Commission Washington, DC 20555-0001

Subject:

Revision to 10 CFR 50.54(q) Review for EP-PP-01, PNPS Emergency Plan Revision 51 Pilgrim Nuclear Power Station (PNPS)

Docket No. 50-293 Renewed Facility Operating License No. DPR-35 In accordance with Title 10 Code of Federal Regulations (CFR) 50.4, Holtec International is providing a revision to the 10 CFR 50.54(q) review for EP-:PP-01, PNPS Emergency Plan, revision 51.

The PNPS Emergency Plan continues to meet the planning standards outlined in 10 CFR 50.47, the effectiveness of the Emergency Plan is not reduced, and the changes did not require prior U.S. Nuclear Regulatory Commission approval. The need for this revision was identified during a self-assessment.

There are no regulatory commitments contained in this letter.

If you have any questions or require additional information, please contact Mr. Peter Miner at (508) 830-7127.

Sincerely, Brian R. Sullivan Pilgrim Site Vice President Holtec Decommissioning International, LLC cc: Andrea L. Sterdis, HDI VP Regulatory and Environmental Affairs NRC Project Manager - Pilgrim NRC Regional Administrator Region I

Enclosures:

Revision of 10 CFR 50.54(q) Review for EP-PP-01, PNPS Emergency Plan, Revision 51 (88 pages)

HDI-PIL-19-003 Page 1 of 2