|
---|
Category:Inspection Report
MONTHYEARIR 05000275/20240102024-11-0707 November 2024 Biennial Problem Identification and Resolution Inspection Report 05000275/2024010 and 05000323/2024010 IR 05000275/20244022024-11-0707 November 2024 Security Baseline Inspection Report 05000275/2024402 and 05000323/2024402 IR 07200026/20244012024-11-0606 November 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200026/2024401 IR 05000275/20240032024-10-30030 October 2024 Integrated Inspection Report 05000275/2024003 and 05000323/2024003 and Independent Spent Fuel Storage Installation Report 07200026/2024001 IR 05000275/20240132024-10-28028 October 2024 – License Renewal Report 05000275/2024013 and 05000323/2024013 IR 05000275/20244042024-10-23023 October 2024 Security Baseline Inspection Report 05000275/2024404 and 05000323/2024404 IR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 IR 05000275/20240052024-08-22022 August 2024 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2024005 and 05000323/2024005) IR 05000275/20240022024-08-0606 August 2024 Integrated Inspection Report 05000275/2024002 and 05000323/2024002 IR 05000275/20240122024-07-31031 July 2024 License Renewal Report 05000275/2024012 and 05000323/2024012 IR 05000275/20240142024-07-11011 July 2024 Age-Related Degradation Inspection Report 05000275/2024014 and 05000323/2024014 IR 05000275/20243012024-07-10010 July 2024 NRC Initial Operator Licensing Examination Approval 05000275/2024301; 05000323/2024301 IR 05000275/20244012024-07-0808 July 2024 Security Baseline Inspection Report 05000275/2024401 and 05000323/2024401 (Full Report) IR 05000323/20240112024-07-0303 July 2024 License Renewal Phase Report 05000323/2024011 IR 05000275/20240012024-04-23023 April 2024 Integrated Inspection Report 05000275/2024001 and 05000323/2024001 IR 05000275/20244032024-03-12012 March 2024 Cyber Security Inspection Report 05000275/2024403 and 05000323/2024403 (Cover Letter) IR 05000275/20230062024-02-28028 February 2024 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2023006 and 05000323/2023006) IR 05000275/20230042024-02-0909 February 2024 Integrated Inspection Report 05000275/2023004 and 05000323/2023004 IR 05000275/20230112024-01-12012 January 2024 NRC License Renewal Phase 1 Inspection Report 05000275/2023011 IR 05000275/20230032023-11-13013 November 2023 Integrated Inspection Report 05000275/2023003 and 05000323/2023003 IR 05000275/20240152023-10-10010 October 2023 – Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (050002752024015 and 050003232024015) IR 05000275/20234042023-10-0606 October 2023 NRC Security Inspection Report Report 05000275/2023404, 05000323/2023404 (Full Report) IR 05000275/20230052023-08-22022 August 2023 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2023005 and 05000323/2023005) - Mid Cycle Letter IR 05000275/20230022023-08-14014 August 2023 Quarterly Integrated Inspection Report 05000275/2023002 and 05000323/2023002- August 7, 2023 IR 05000275/20213012023-08-0909 August 2023 Errata for Diablo Canyon Power Plant, Units 1 and 2 - NRC Examination Report 050002752021301 and 050003232021301 IR 05000275/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000275/2023402, and 05000323/2023402 IR 05000275/20233012023-07-25025 July 2023 NRC Initial Operator Licensing Examination Approval 05000275/2023301, 05000323/2023301 IR 05000275/20230102023-05-11011 May 2023 NRC Inspection Report 05000275 2023010 and 05000323 2023010 IR 05000275/20230012023-05-0909 May 2023 Integrated Inspection Report 05000275/2023001 and 05000323/2023001 IR 05000275/20234032023-03-10010 March 2023 NRC Security Baseline Inspection Report 05000275/2023403, 05000323/2023403 (Full Report) IR 05000275/20220062023-03-0101 March 2023 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2022006 and 05000323/2022006) IR 05000275/20220042023-02-0202 February 2023 Integrated Inspection Report 05000275/2022004 and 05000323/2022004 IR 05000275/20220102023-01-27027 January 2023 Biennial Problem Identification and Resolution Inspection Report 05000275/2022010 and 05000323/2022010 IR 05000275/20224022022-10-26026 October 2022 Security Baseline Inspection Report 05000275/2022402 and 05000323/ 2022402 IR 05000275/20220032022-10-24024 October 2022 Integrated Inspection Report 05000275/2022003 and 05000323/2022003 and Exercise of Enforcement Discretion IR 05000275/20220052022-08-23023 August 2022 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2022005 and 05000323/2022005) IR 05000275/20220022022-08-10010 August 2022 Integrated Inspection Report 05000275/2022002 and 05000323/2022002 IR 05000275/20220112022-08-0909 August 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000275/2022011 and 05000323/2022011 IR 05000275/20224012022-08-0303 August 2022 NRC Security Inspection Report 05000275/2022401, 05000323/2022401 ML22143A8812022-05-26026 May 2022 Revised Integrated Inspection Report 05000275/2022001 and 05000323/2022001 IR 05000275/20220012022-05-0505 May 2022 Integrated Inspection Report 05000275/2022001 and 05000323/2022001 ML22118A9362022-05-0505 May 2022 Integrated Inspection Report 05000275/2022001 and 05000323/2022001 IR 05000323/20214202022-03-31031 March 2022 Security Inspection Report 05000275 and 05000323/2021420 IR 05000275/20210062022-03-0202 March 2022 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2021006 and 05000323/2021006) IR 05000275/20210042022-02-0303 February 2022 Integrated Inspection Report 05000275/2021004 and 05000323/2021004 IR 05000275/20214042022-01-13013 January 2022 Public - Security Baseline Inspection Report 05000275/2021404 and 05000323/2021404 IR 05000275/20210032021-11-0303 November 2021 Integrated Inspection Report 05000275/2021003 and 05000323/2021003 IR 05000275/20210112021-09-10010 September 2021 Design Basis Assurance Inspection (Programs) Report 05000275/2021011 and 05000323/2021011 IR 05000275/20214052021-08-0505 August 2021 Security Baseline Inspection Report 05000275/2021405 and 05000323/2021405 IR 07200026/20214012021-08-0303 August 2021 Diablo Canon Nuclear Power Plant, Security Baseline Inspection Report 07200026/2021401 2024-08-06
[Table view] Category:Letter
MONTHYEARML24311A1232024-11-14014 November 2024 – Report for the Aging Management Audit Regarding the License Renewal Application Review IR 05000275/20240102024-11-0707 November 2024 Biennial Problem Identification and Resolution Inspection Report 05000275/2024010 and 05000323/2024010 IR 05000275/20244022024-11-0707 November 2024 Security Baseline Inspection Report 05000275/2024402 and 05000323/2024402 IR 07200026/20244012024-11-0606 November 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200026/2024401 DCL-24-095, CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20232024-11-0606 November 2024 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2023 ML24302A1922024-11-0101 November 2024 Ltr to G. Frausto Coastal Band of Chumash Indians Re DCPP Dseis ML24302A2612024-11-0101 November 2024 Letter to Achp Re DCPP Dseis ML24302A1952024-11-0101 November 2024 Ltr to M. Olivas Tucker Ytt Re DCPP Dseis ML24302A1942024-11-0101 November 2024 Ltr to K. Kahn Santa Ynez Band of Chumash Indians Re DCPP Dseis ML24302A1912024-11-0101 November 2024 Ltr to C. Mcdarment Tule River Tribe Re DCPP Dseis ML24302A1972024-11-0101 November 2024 Letter to V. Sage Walker Northern Chumash Tribal Council Re DCPP Dseis ML24302A1962024-11-0101 November 2024 Ltr to SLO County Chumash Indians Re DCPP Dseis ML24302A1932024-11-0101 November 2024 Letter to G. Pierce Salinan Tribe of Monterey, SLO Re DCPP Dseis ML24302A2622024-11-0101 November 2024 Letter to CA SHPO Regarding DCPP Dseis ML24276A1482024-10-30030 October 2024 NRC to Fws Request for Concurrence with Endangered Species Act Determinations for Diablo Canyon Power Plant, Units 1, 2, ISFSI Proposed License Renewals in San Luis Obispo Co, CA ML24275A0622024-10-30030 October 2024 NRC to NMFS Request Initiate Formal Endangered Species Act Consultation and Abbreviated Essential Fish Habitat for Proposed License Renewal of DCP Plant Units 1, 2 IR 05000275/20240032024-10-30030 October 2024 Integrated Inspection Report 05000275/2024003 and 05000323/2024003 and Independent Spent Fuel Storage Installation Report 07200026/2024001 ML24269A0122024-10-29029 October 2024 OEDO-24-00083 2.206 Petition Diablo Canyon Seismic CDF - Response to Petitioner Letter ML24284A3122024-10-28028 October 2024 Ltr to P Ting, Diablo Canyon Nuclear Power Plant Units 1 and 2 Notice of Avail of Draft Supplement 62 to the GEIS for Lic Renew of Nuclear Plants ML24284A3112024-10-28028 October 2024 Ltr to a Peck, Diablo Canyon Nuclear Power Plant Units 1 and 2 Notice of Avail of Draft Supplement 62 to the GEIS for Lic Renew of Nuclear Plants IR 05000275/20240132024-10-28028 October 2024 – License Renewal Report 05000275/2024013 and 05000323/2024013 DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 ML24261B9492024-10-24024 October 2024 Issuance of Amendment Nos. 246 and 248 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) IR 05000275/20244042024-10-23023 October 2024 Security Baseline Inspection Report 05000275/2024404 and 05000323/2024404 ML24277A0292024-10-18018 October 2024 NRC to Fws Req. for Concurrence W. Endangered Species Act Determinations for Diablo Canyon Power Plant Units 1,2, ISFSI Proposed License Renewals in San Luis Obispo Co., CA DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 IR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 DCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation ML24240A0222024-09-20020 September 2024 Letter to A. Peck Environmental Impact Statement Scoping Summary Report for Diablo Canyon Nuclear Power Plant Units 1 and 2 ML24260A1222024-09-14014 September 2024 14 Sept 2024 Ltr - California Coastal Commission to Pg&E, Incomplete Consistency Certification for Requested Nuclear Regulatory Commission License Renewal for Diablo Canyon Power Plant DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) ML24262A2462024-09-11011 September 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Petitioner Response to Acknowledgement Letter - DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment ML24205A0662024-08-27027 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Ack Letter - Diablo Canyon Units 1 and 2 Seismic Core Damage Frequency - IR 05000275/20240052024-08-22022 August 2024 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2024005 and 05000323/2024005) DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React IR 05000275/20240022024-08-0606 August 2024 Integrated Inspection Report 05000275/2024002 and 05000323/2024002 DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies IR 05000275/20240122024-07-31031 July 2024 License Renewal Report 05000275/2024012 and 05000323/2024012 DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring ML24187A1352024-07-16016 July 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of June 2024 Audit Related to the License Renewal Application Severe Accident Mitigation Alternatives Review IR 05000275/20240142024-07-11011 July 2024 Age-Related Degradation Inspection Report 05000275/2024014 and 05000323/2024014 IR 05000275/20243012024-07-10010 July 2024 NRC Initial Operator Licensing Examination Approval 05000275/2024301; 05000323/2024301 IR 05000275/20244012024-07-0808 July 2024 Security Baseline Inspection Report 05000275/2024401 and 05000323/2024401 (Full Report) 2024-09-09
[Table view] |
Text
December 15, 2020
SUBJECT:
DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000275/2020410 AND 05000323/2020410
Dear Mr. Welsch:
On December 3, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Diablo Canyon Power Plant, Units 1 and 2. On December 7, 2020, the NRC inspectors discussed the results of this inspection with Ms. P. Gerfen, Site Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Ray L. Digitally signed by Ray L. Kellar Kellar Date: 2020.12.15 15:05:57 -06'00'
Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 05000275 and 05000323 License Nos. DPR-80 and DPR-82
Enclosure:
As stated
Inspection Report
Docket Numbers: 05000275 and 05000323 License Numbers: DPR-80 and DPR-82 Report Numbers: 05000275/2020410 and 05000323/2020410 Enterprise Identifier: I-2020-410-0006 Licensee: Pacific Gas and Electric Company Facility: Diablo Canyon Power Plant, Units 1 and 2 Location: Avila Beach, CA Inspection Dates: November 30, 2020 to December 03, 2020 Inspectors: D. Hostetter, Physical Security Inspector Approved By: Ray L. Kellar, Chief Plant Support Branch 1 Division of Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Diablo Canyon Power Plant,
Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
SAFEGUARDS
71130.02 - Access Control
Access Control (1 Sample)
(1)
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following
procedure elements: Review Security Plan Changes (IP Section 02.01)
Main article: IP 71130.09
- (1) Since the last NRC inspection of this program area, Security Plan Revision 16 was implemented based on your determination, in accordance with 10 CFR 50.54(p)(2),that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan.
However, this review does not constitute formal NRC approval of the changes.
Therefore, these changes remain subject to future NRC inspection in their entirety.
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)
=
- (1) Unit 1 (August 1, 2019 through November 1, 2020)
Unit 2 (August 1, 2019 through November 1, 2020)
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On December 7, 2020, the inspectors presented the security baseline inspection results to Ms. P. Gerfen, Site Vice President and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71130.02 Corrective Action Corrective Actions 51099139, 51099377, 51099474, 51099475 Multiple
Documents
Resulting from
Inspection
Miscellaneous SP-608 Protected and Vital Area Entry Logs Multiple
10
Procedures AD3.ID6 Designation and Procedure of Security Information 15
OM.11 ID12 Process for Unescorted Access Authorization 5
Physical Security Diablo Canyon Nuclear Power Plant Physical Security Plan, 16
Plan Training & Qualification Plan, Safeguards Contingency Plan,
and Independent Spent Fuel Storage Installation Security
Program
SP-401 Security Access Control and Personal Identification 50
SP-403 Security Escorts 15
SP-405 Incoming Package & Material Control 43
SP-407 Protected Area Vehicle Control 29
SP-412 Visitor Check-in and Log-out Process 42
SP-504 Security Lock, Key, and Combination Control 24
71130.09 Procedures 10CFR50.54(p) Security Plan Change Evaluation Criteria 16
Evaluations and
Supporting
Documents
71151 Miscellaneous Performance Collection and Submittal of NRC Performance Indicators 1
Indicators
5