MONTHYEARML20217P3791999-10-21021 October 1999 Forwards NRC Form 396 & NRC Form 398 for Renewal of Licenses SOP-20607-1 & SOP-20610-1.Without Encls ML20217N2521999-10-20020 October 1999 Provides Supplemental Info Re 990405 Containment Insp Program Requests for Relief RR-L-1 & RR-L-2,in Response to 991013 Telcon with NRC ML20217K7541999-10-15015 October 1999 Forwards Rev 1 to Unit 1,Cycle 9 & Unit 2 Cycle 7 Colrs,Iaw Requirements of TS 5.6.5.Figure 5, Axial Flux Difference Limits as Function of Percent of Rated Thermal Power for RAOC, Was Revised for Both Units ML20217G6751999-10-13013 October 1999 Requests Withholding of Proprietary Info Contained in Application for Amend to OLs to Implement Relaxations Allowed by WCAP-14333-P-A,rev 1 ML20217G1071999-10-0707 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Vogtle & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Plans to Conduct Core Insps at Facility Over Next Six Months ML20216J9041999-10-0101 October 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20216J9161999-10-0101 October 1999 Forwards Response to NRC 990723 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20217B0141999-10-0101 October 1999 Forwards Insp Repts 50-424/99-06 & 50-425/99-06 on 990725- 0904 at Vogtle Units 1 & 2 Reactor Facilities.Determined That One Violation Occurred & Being Treated as non-cited Violation ML20212E8751999-09-20020 September 1999 Forwards Response to NRC GL 99-02, Lab Testing of Nuclear Grade Activated Charcoal. Description of Methods Used to Comply with Std Along with Most Recent Test Results Encl ML20212E7481999-09-20020 September 1999 Requests Approval Per 10CFR50.55a to Use Alternative Method for Determining Qualified Life of Certain BOP Diaphragm Valves than That Specified in Code Case N-31.Proposed Alternative,Encl ML20212C2191999-09-16016 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, Which Is Current Need for NRC Operator Licensing Exams for Years 2000 Through 2003 of Plant Vogtle,Per Administrative Ltr 99-03 ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl ML20211J5291999-08-30030 August 1999 Forwards Snoc Copyright Notice Dtd 990825,re Production of Engineering Drawings Ref in VEGP UFSAR ML20211J5251999-08-30030 August 1999 Forwards Response to NRC 990727 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20211J7381999-08-27027 August 1999 Informs That Licensee Vessel Data Is Different than NRC Database Based on Listed Info,Per 990722 Request to Review Rvid ML20211E9251999-08-23023 August 1999 Forwards fitness-for-duty Performance Data for Jan-June 1999,as Required by 10CFR26.71(d).Data Reflected in Rept Covers Employees at Vogtle Electric Generating Plant ML20210V0881999-08-16016 August 1999 Forwards Insp Repts 50-424/99-05 & 50-425/99-05 on 990620- 0724.No Violations Noted.Vogtle Facility Generally Characterized by safety-conscious Operations,Sound Engineering & Maintenance Practices ML20210Q4611999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 for Vogtle.Requests Info Re Individuals Who Will Take Exam. Sample Registration Ltr Encl ML20210L2181999-08-0202 August 1999 Forwards NRC Form 396 & Form 398 for Renewal of Listed Licenses,Iaw 10CFR55.57.Without Encl ML20210N1191999-08-0202 August 1999 Discusses 990727 Telcon Between Rs Baldwin & R Brown Re Administration of Licensing Exam at Facility During Wk of 991213 ML20210G3351999-07-27027 July 1999 Forwards Second Request for Addl Info Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20210E0121999-07-23023 July 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20210D9341999-07-22022 July 1999 Discusses Closure of TACs MA0581 & MA0582,response to Requests for Info in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20210C8011999-07-21021 July 1999 Provides Response to NRC AL 99-02,which Requests That Addressees Submit Info Pertaining to Estimates of Number of Licensing Actions That Will Be Submitted for NRC Review for Upcoming Fy 2000 & 2001 ML20210E0431999-07-15015 July 1999 Forwards Insp Repts 50-424/99-04 & 50-425/99-04 on 990502- 0619.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20209H3881999-07-14014 July 1999 Forwards Revs 1 & 2 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Unit 1 & 2 ML20209C4041999-07-0101 July 1999 Forwards Rev 29 to VEGP Units 1 & 2 Emergency Plan.Rev 29 Incorporates Design Change Associated with Consolidation of Er Facilities Computer & Protues Computer.Justifications for Changes & Insertion Instructions Are Encl ML20196H8081999-06-28028 June 1999 Discusses 990528 Meeting Re Results of Periodic PPR for Period of Feb 1997 to Jan 1999.List of Attendees Encl ML20212J2521999-06-21021 June 1999 Responds to NRC RAI Re Yr 2000 Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701 ML20196F9171999-06-21021 June 1999 Forwards Owner Rept for ISI for Vogtle Electric Generating Plant,Unit 1 Eighth Maint/Refueling Outage. Separate Submittal Will Not Be Made to NRC on SG Tubes Inspected During Subj Outage ML20195F8031999-06-11011 June 1999 Forwards Changes to VEGP Unit 1 Emergency Response Data Sys (ERDS) Data Point Library.Changes Were Completed on 990308 While Unit 1 Was SD for Refueling Outage ML20207E7421999-06-0303 June 1999 Refers to from NRC Which Issued Personnel Assignment Ltr to Inform of Lm Padovan Assignment as Project Manager for Farley Npp.Reissues Ltr with Effective Date Corrected to 990525 ML20207F6201999-06-0202 June 1999 Sixth Partial Response to FOIA Request for Documents.Records in App J Encl & Will Be Available in Pdr.App K Records Withheld in Part (Ref FOIA Exemptions 7) & App L Records Completely Withheld (Ref FOIA Exemption 7) ML20207D9861999-05-28028 May 1999 Informs That,Effective 990325,LM Padovan Was Assigned as Project Manager for Plant,Units 1 & 2 ML20207D2701999-05-19019 May 1999 Forwards Insp Repts 50-424/99-03 & 50-425/99-03 on 990321- 0501.One Violation of NRC Requirements Identified & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML20206M5141999-05-11011 May 1999 Informs That NRC Ofc of Nuclear Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Rl Emch Section Chief for Vogtle. Reorganization Chart Encl ML20206U4061999-05-11011 May 1999 Confirms Telcon with J Bailey Re Mgt Meeting Scheduled for 990528 to Discuss Results of Periodic Plant Performance Review for Plan Nuclear Facility Fo Period of Feb 1997 - Jan 1999 05000424/LER-1998-006, Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Exi1999-05-10010 May 1999 Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Existed ML20206D6411999-04-29029 April 1999 Forwards Vogtle Electric Generating Plant Radiological Environ Operating Rept for 1998 & Vogtle Electric Generating Plant Units 1 & 2 1998 Annual Rept Annual Radioactive Effluent Release Rept ML20206D5881999-04-29029 April 1999 Forwards Rept Which Summarizes Effects of Changes & Errors in ECCS Evaluation Models on PCT for 1998,per Requirements of 10CFR50.46(a)(3)(ii).Rept Results Will Be Incorporated Into Next FSAR Update ML20206D6951999-04-28028 April 1999 Provides Update of Plans for VEGP MOV Periodic Verification Program Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20206C2241999-04-21021 April 1999 Forwards Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2.Page E2-2 Was Iandvertently Omitted from Previously Submitted Rept on 990413 ML20206A6371999-04-21021 April 1999 Forwards SE Authorizing Licensee Re Rev 9 to First 10-yr ISI Interval Program Plan & Associated Requests for Relief (RR) 65 from ASME Boiler & Pressure Vessel Code ML20205Q3351999-04-15015 April 1999 Forwards Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320.Three Violations Identified & Being Treated as Non-Cited Violations ML20205T2351999-04-0909 April 1999 Informs That on 990317,B Brown & Ho Christensen Confirmed Initial Operator Licensing Exam Scheduled for Y2K.Initial Exam Date Scheduled for Wk of 991213 for Approx 10 Candidates ML20205K7501999-04-0505 April 1999 Informs That Effective 990329,NRC Project Mgt Responsibility for Plant Has Been Transferred from Dh Jaffe to R Assa ML20209A3741999-04-0505 April 1999 Submits Several Requests for Relief for Plant from Code Requirements Pursuant to 10CFR50.55a(a)(3) & (g)(5)(iii).NRC Is Respectfully Requested to Approve Requests Prior to Jan 1,2000 ML20205H3481999-03-31031 March 1999 Forwards Georgia Power Co,Oglethorpe Power Corp,Municipal Electric Authority of Ga & City of Dalton,Ga Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81 ML20205F9091999-03-29029 March 1999 Submits Rept of Number of SG Tubes Plugged During Plant Eighth Maintenance/Refueling Outage (1R8).Inservice Insps Were Completed on SGs 1 & 4 on 990315.No Tubes Were Plugged ML20205G0761999-03-26026 March 1999 Provides Results of Individual Monitoring for 1998.Encl Media Contains All Info Required by Form NRC 5.Without Encl 1999-09-20
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217P3791999-10-21021 October 1999 Forwards NRC Form 396 & NRC Form 398 for Renewal of Licenses SOP-20607-1 & SOP-20610-1.Without Encls ML20217N2521999-10-20020 October 1999 Provides Supplemental Info Re 990405 Containment Insp Program Requests for Relief RR-L-1 & RR-L-2,in Response to 991013 Telcon with NRC ML20217K7541999-10-15015 October 1999 Forwards Rev 1 to Unit 1,Cycle 9 & Unit 2 Cycle 7 Colrs,Iaw Requirements of TS 5.6.5.Figure 5, Axial Flux Difference Limits as Function of Percent of Rated Thermal Power for RAOC, Was Revised for Both Units ML20217G6751999-10-13013 October 1999 Requests Withholding of Proprietary Info Contained in Application for Amend to OLs to Implement Relaxations Allowed by WCAP-14333-P-A,rev 1 ML20216J9161999-10-0101 October 1999 Forwards Response to NRC 990723 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20216J9041999-10-0101 October 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20212E7481999-09-20020 September 1999 Requests Approval Per 10CFR50.55a to Use Alternative Method for Determining Qualified Life of Certain BOP Diaphragm Valves than That Specified in Code Case N-31.Proposed Alternative,Encl ML20212E8751999-09-20020 September 1999 Forwards Response to NRC GL 99-02, Lab Testing of Nuclear Grade Activated Charcoal. Description of Methods Used to Comply with Std Along with Most Recent Test Results Encl ML20212C2191999-09-16016 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, Which Is Current Need for NRC Operator Licensing Exams for Years 2000 Through 2003 of Plant Vogtle,Per Administrative Ltr 99-03 ML20211J5291999-08-30030 August 1999 Forwards Snoc Copyright Notice Dtd 990825,re Production of Engineering Drawings Ref in VEGP UFSAR ML20211J5251999-08-30030 August 1999 Forwards Response to NRC 990727 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20211J7381999-08-27027 August 1999 Informs That Licensee Vessel Data Is Different than NRC Database Based on Listed Info,Per 990722 Request to Review Rvid ML20211E9251999-08-23023 August 1999 Forwards fitness-for-duty Performance Data for Jan-June 1999,as Required by 10CFR26.71(d).Data Reflected in Rept Covers Employees at Vogtle Electric Generating Plant ML20210L2181999-08-0202 August 1999 Forwards NRC Form 396 & Form 398 for Renewal of Listed Licenses,Iaw 10CFR55.57.Without Encl ML20210C8011999-07-21021 July 1999 Provides Response to NRC AL 99-02,which Requests That Addressees Submit Info Pertaining to Estimates of Number of Licensing Actions That Will Be Submitted for NRC Review for Upcoming Fy 2000 & 2001 ML20209H3881999-07-14014 July 1999 Forwards Revs 1 & 2 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Unit 1 & 2 ML20209C4041999-07-0101 July 1999 Forwards Rev 29 to VEGP Units 1 & 2 Emergency Plan.Rev 29 Incorporates Design Change Associated with Consolidation of Er Facilities Computer & Protues Computer.Justifications for Changes & Insertion Instructions Are Encl ML20196F9171999-06-21021 June 1999 Forwards Owner Rept for ISI for Vogtle Electric Generating Plant,Unit 1 Eighth Maint/Refueling Outage. Separate Submittal Will Not Be Made to NRC on SG Tubes Inspected During Subj Outage ML20212J2521999-06-21021 June 1999 Responds to NRC RAI Re Yr 2000 Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701 ML20195F8031999-06-11011 June 1999 Forwards Changes to VEGP Unit 1 Emergency Response Data Sys (ERDS) Data Point Library.Changes Were Completed on 990308 While Unit 1 Was SD for Refueling Outage 05000424/LER-1998-006, Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Exi1999-05-10010 May 1999 Forwards LER 98-006-03 Re Motor Control Ctr Breaker Buckets Not Being Seismically Qualified.Rev Is Submitted to Document Results of Seismic Testing That Demonstrated That No Condition Outside Design Basis of TS Requirements Existed ML20206D5881999-04-29029 April 1999 Forwards Rept Which Summarizes Effects of Changes & Errors in ECCS Evaluation Models on PCT for 1998,per Requirements of 10CFR50.46(a)(3)(ii).Rept Results Will Be Incorporated Into Next FSAR Update ML20206D6411999-04-29029 April 1999 Forwards Vogtle Electric Generating Plant Radiological Environ Operating Rept for 1998 & Vogtle Electric Generating Plant Units 1 & 2 1998 Annual Rept Annual Radioactive Effluent Release Rept ML20206D6951999-04-28028 April 1999 Provides Update of Plans for VEGP MOV Periodic Verification Program Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20206C2241999-04-21021 April 1999 Forwards Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2.Page E2-2 Was Iandvertently Omitted from Previously Submitted Rept on 990413 ML20209A3741999-04-0505 April 1999 Submits Several Requests for Relief for Plant from Code Requirements Pursuant to 10CFR50.55a(a)(3) & (g)(5)(iii).NRC Is Respectfully Requested to Approve Requests Prior to Jan 1,2000 ML20205H3481999-03-31031 March 1999 Forwards Georgia Power Co,Oglethorpe Power Corp,Municipal Electric Authority of Ga & City of Dalton,Ga Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81 ML20205F9091999-03-29029 March 1999 Submits Rept of Number of SG Tubes Plugged During Plant Eighth Maintenance/Refueling Outage (1R8).Inservice Insps Were Completed on SGs 1 & 4 on 990315.No Tubes Were Plugged ML20205G0761999-03-26026 March 1999 Provides Results of Individual Monitoring for 1998.Encl Media Contains All Info Required by Form NRC 5.Without Encl ML20205H4051999-03-25025 March 1999 Forwards Info on Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81,as Requested IAW 10CFR50.75(f)(1) ML20205H3891999-03-25025 March 1999 Forwards Info on Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81,as Requested IAW 10CFR50.75(f)(1).Page 2 in Third Amend Power Sales Contract of Incoming Submittal Not Included ML20205A9441999-03-25025 March 1999 Forwards VEGP Unit 1 Cycle 9 Colr,Per TS 5.6.5.d ML20205H3811999-03-24024 March 1999 Forwards Info on Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81,as Requested IAW 10CFR50.75(f)(1) ML20205H3621999-03-22022 March 1999 Forwards Info on Status of Decommissioning Funding for Each Reactor or Part of Reactor Owned for OLs NPF-68 & NPF-81, as Requested IAW 10CFR50.75(f)(1) ML20204G4361999-03-18018 March 1999 Forwards Summary Rept of Present Level & Source of on-site Property Damage Insurance Coverage for Vegp,Iaw Requirements of 10CFR50.54(w)(3) ML20204C0591999-03-17017 March 1999 Forwards Rev 0 to WCAP-15160, Evaluation of Pressurized Thermal Shock for Vegp,Unit 2 & Rev 0 to WCAP-15159, Analysis of Capsule X from Vegp,Unit 2 Reactor Vessel Radiation Surveillance Program ML20207K9551999-03-11011 March 1999 Forwards Response to Rai,Pertaining to Positive Alcohol Test of Licensed Operator.Encl Info Provided for NRC Use in Evaluation of Fitness for Duty Occurrence.Encl Withheld,Per 10CFR2.790(a)(6) ML20207L9721999-03-10010 March 1999 Forwards Rev 15 to EPIP 91104-C of Manual Set 6 of Vogtle Epips.Without Encl ML20207B0191999-02-25025 February 1999 Forwards Fitness for Duty Performance Data for six-month Reporting Period 980701-1231,IAW 10CFR26.71(d) 05000424/LER-1998-009, Forwards LER 98-009-00 Re Event in Which Improper Testing Method Resulted in Inadequate Surveillances on 9812291999-01-27027 January 1999 Forwards LER 98-009-00 Re Event in Which Improper Testing Method Resulted in Inadequate Surveillances on 981229 ML20199F7701999-01-13013 January 1999 Submits Revised Response to RAI Re Licensee 980713 Proposed Amend to Ts,Eliminating Periodic Response Time Testing Requirements on Selected Sensors & Protection Channels. Corrected Copy of Table,Encl ML20199F7981999-01-13013 January 1999 Forwards Corrected Pages to VEGP-2 ISI Summary Rept for Spring 1998 Maint/Refueling Outage. Change Bar in Margin of Affected Pages Denotes Changes to Rept ML20199G1381999-01-13013 January 1999 Forwards Copy of Permit Renewal Application Package for NPDES Permit Number GA0026786,per Section 3.2 of VP Environ Protection Plan 05000424/LER-1998-007, Forwards LER 98-007-00,re Inadequate Surveillances Due to Improperly Performed Response Time Testing,On 981215,IAW 10CFR50.731999-01-13013 January 1999 Forwards LER 98-007-00,re Inadequate Surveillances Due to Improperly Performed Response Time Testing,On 981215,IAW 10CFR50.73 ML20198F6131998-12-18018 December 1998 Forwards Revised Certification of Medical Exam Form for License SOP-21147.Licensee Being Treated for Hypertension. Util Requests That Individual License Be Amended to Reflect Change in Status ML20198L6631998-12-18018 December 1998 Forwards Amend 37 to Physical Security & Contingency Plan. Encl 1 Provides Description & Justification for Changes & Encl 2 Contains Actual Amend 37 Pages.Amend Withheld,Per 10CFR73.21 ML20198D9291998-12-16016 December 1998 Forwards Requested Info Re Request to Revise TSs Elimination of Periodic Pressure Sensor Response Time Tests & Elimination of Periodic Protection Channel Response Time Tests ML20198D9991998-12-16016 December 1998 Forwards Responses to 980916 RAI Re Response to GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations ML20198D8171998-12-14014 December 1998 Forwards NRC Form 396 & Form 398 for Renewal of License OP-20993.Without Encls ML20206N3051998-12-0808 December 1998 Submits RAI Re Replacement of Nuclear Instrument Sys Source & Intermediate Range Channels & post-accident Neutron Flux Monitoring Sys 1999-09-20
[Table view] |
Text
.- 4
. C.K. McCoy Southern Nuclear
- , . Mce President Operating Company. loc.
1 Vogtle Project 40 inverras Center Parkway P0. Box 1295 Birmingham, Alabama 35201 Tel 205992.7122 Fax 2059920403 SOUTHERN COMPANY Harch 18,-1998 EnergytoServe YourWorld*
LCV-I l ll-A Docket Nos. 50-424 50-425 TAC Nos. M96769 M96770 U. S. Nuclear Regulatory Commission A'ITN: Document Control Desk Washington, D. C. 20555 VOGTLE ELECTRIC GENERATING PLANT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION AND REQUEST TO REVISE TECilNICAL SPECIFICATIONS, "AC SOURCES - OPERATING" EMERGENCY DIESEL GENERATOR EXTENDED AOT REQUEST Ladies and Gentlemen:
Ily letter dated January 22,1998, (LCV-1111) Southern Nuclear Operating Company (SNC) proposed to amend the Vogtle Electric Generating Plant (VEGP) Unit 1 and Unit 2 Technical Specifications (TS), Appendix A to Operating Licenses NPF-68 and NPF-81. The proposed amendment would revise Limiting Condition for Operation (LCO) 3.8.1, AC Sources -
Operating, to allow an emergency diesel generator (DG) to be out of service for up to 14 days.
On February 13,1998, a telephone conversation was held between SNC and the NRC staff regarding the proposed amendment. As a result of that telephone conversation, SNC is providing the following information:
~
- From the current revision zero (Rev. 0) converted model, the percentagc of the total average core damage frequency (CDF) attributed to station blackout (SILO), single unit loss of offsite power (LOSP1), and dual unit LOSP (LOSP2) is:
Current Rev. O Converted Model l
Contributor Percent of Total Average CDF Silo 5.6 %
LOSP1 8.5 %
LOSP2 2.7 %
9803250340 980318 PDR ADOCK 05000424 P pyg
._ . t.
.- U. S. Nuclear Rrgul: tory Commission
.- LCV-1111-A !
Page 2
- From the current revision zero (Rev. 0) converted model with the standby auxiliary:
transformer (SAT) failed, the percentage of the total average CDF attributed to SBO, single unit LOSP (LOSPI), and dual unit LOSP (LOSP2)is:
Current Rev. O Converted Model with SAT Failed Contributor Percent of Total Average CDF SBO 6.0 %
LOSP) 28 %
LOSP2 9.0 %
- Quantification of the current revision zero (Rev. 0) converted model yielded an average large early release frequency (LERF) of 1.72E-06 per year. With the failure of both DGs, the total average LERF calculated was 1.72E-06 per year which is the same as that calculated for the base case. Therefore, there is no increase in average LERF due to the
. failure of both DGs.
During a subsequent review, it was identified that an inappropriate recovery rules file was used to make the calculations reported in LCV-Illi. As a result, the information reported in LCV-1111. Enclosure 3, SNC Response to NRC Question 2, is revised as follows:
(a) The decrease in the average CDF when credit is taken for the availability of Plant Wilson will be:
CDF decrease = (CDF A - CDF B)
= (4.831E 3.641E-05)/4.831E-05
= 24.6%
(b) No change.-
(c) No change.
. (d) No change.
f
. (e) The following baseline CDFs were calculated:
]
Non-hurricane season CDFo = 3.620E-05/ year
- Hurricane season CDFG = . 3.798E-05/ year t . Annual Average .CDFB = 3.641E-05/ year j
i? .j j
, , 1
. U.'S, Nuclear Regulitory Commission
. LCV-1111-A Page 3
- ~
l (f) Change in the CDP during non-hurricane season with EDG A in maintenance for 14 days and EDG-B not in maintenance will be:
DCDP = (CDF E - CDF p + dCDF SEISMIC + TORNADO)
=- (4.226E 3.620E-05 + 2.53E-06)
= 3.29E-07 Change in the CDP during non-hurricane season with EDG-B in maintenance for 14 days and EDG-A not in maintenance will be:
DCDP = (CDF p - CDF D + dCDF SEISMIC + TORNADO)
=
(4.424E 3.620E-05 + 2.53E-06)
= 4.05E-07 Change in the CDP during hurricane season with EDG-A in maintenance for 14 days and EDG-B not in maintenance will be:
l DCDP = (CDF }{ - CDF o + dCDF SEISMIC + TORNADO)
=
(4.643E 3.798E-05 + 2.53E-06 )
= 4.21 E-07 1
Change in the CDP during hurricane season with EDG-B in maintenance for 14 days and j EDG-A not in maintenance will be: J DCDP = (CDF 1-CDF G +dCDF SEISMIC + TORNADO)
=
(4.955E 3.798E-05 +2.53E-06)
= 5.41 E-07 Change in the CDP using average values for LOSP1 (single unit LOSP) and LOSP2 (dual ,
unit LOSP) with EDG-A in maintenance for 14 days and EDG-B not in maintenance will be:
l
)
DCDP =- (CDF j - CDF B + dCDF SEISMIC + TORNADO)
=
(4.276E 3.641 E-05 + 2.53E-06) *' 14/365 ;
= 3.41 E-07 Change in the CDP using average values fo.* LOSP1 and LOSP2 with EDG-B in maintenance for 14 days and EDG-A not in mairtenance will be:
- DCDP = - (CDF K - CDF B + dCDF SEISMIC + TORNADO)
=
(4.485E 3.641E-05 + 2.53E-06)
= 4.21E-07 -I i
o
.j
'a ,' ' 'U', ,S N luc ear Regul: tory Commission
.- : LCV-1111-A - 1 Page 4 (g) No change.
(h) To determine the instantaneous change in the CDF value for the potential worst-case plant configuration allowed under the proposed technical specifications, two cases were evaluated '
to determine the impact on instantaneous CDF if additional equipment was out of service
' during a diesel generator extended AOT. VEGP Technical Specifications allow the turbine driven AFW pump or a train of NSCW associated with the EDG to be out of service at the same time.
Case 1: TDAFW pump and EDG-A in raaintenance: Change in the VEGP CDF using average values for LOSP1 and LOSP2 with EDG-A and TDAFW pump in maintenance, and EDG-B and MDAFW pumps not in maintenance will be :
dCDF = (CDF L -CDF B + dCDF SEISMIC + TORNADO)
=
(6.837E 3.641E-05 + 2.53E-06)
= 3.449E-05 Case 2: NSCW train B and EDG-B in maintenance: Change in the VEGP CDF using average values for LOSP1 and LOSP2 with EDG-B and NSCW train B in maintenance, and EDG-A and NSCW train A not in maintenance will bc :
dCDF = CDF M -CDF B + dCDF SEIS'MIC + TORNADO)
=
(7.981E 3.641E-05 +2.53E-06)
= 7.642E-04 Please see revised Table 1 on the next page.
)
i '
s i2.mmim --._ --
ih i , . - s.- 4 s i i1-i p t
,~ U S. Nuclear R gulatory Commission
. LCV-1111-A -
Page 5 1
TABLEI CDF Variables used in EDG Extended AOT Justification Calculations CDF -CDF DUAL UNIT LOSP DESCRIPTION OF CDF VARIAHLE VARIABLE VALUE FREQUENCY CDF 4 4.831 E-05 1.43E-02 Average annual CDF with no credit for SAT CDFn 3.641E-05 1.43 E-02 Average annual CDF with credit for SAT .
dCDF susuic. 2.53 E-06 N/A CDF contribution from Seismic and Tornado anno events CDFo 3.620E-05 1.13 E-02 Average annual non-hurricane season CDF with credit for SAT CDF, 4.226E-05 1.13 E-02 Average annual non-hurricane season CDF with credit for SAT, assuming EDG-A in maintenance and EDG-B not in maintenance CDF, 4.424E-05 1.13E-02 Average annual non-hurricane season CDF with no credit for SAT, assuming EDG-B in maintenance and EDG-A not in maintenance CDFo 3.798E-05 3.61E-02 Average annual hurricane season CDF with credit for SAT CDFu 4.643 E-5 3.61 E-02 Average annual hurricane season CDF with credit for SAT, assuming EDG-A in maintenance and EDG-B not in maintenance CDF 4.955E-5 3.61 E-02 Average annual hurricane season CDF with credit for SAT, assuming EDG-B in maintenance and EDG-A not in maintenance CDF, 4.276E-05 1.43 E-02 Average annual CDF with credit for SAT, assuming EDG-A in maintenance and EDG-B not in maintenance CDFx 4.485E-05 1.43E-02 Average annual CDF with credit for SAT, assuming EDG-B in maintenance and EDG-A not in maintenance CDF.i 6.837E-05 1.43 E-02 Average annual CDF with credit for SAT, assuming EDG-A and TDAFW in maintenance, and EDG-B and MDAFW pumps not in maintenance CDFu 7.981 E-4 1.43 E-02 Average annual CDF with credit for SAT, assuming EDG-B and NSCW train B in maintenance, and EDG-A and NSCW train A not in maintenance 4
b l J
p 1
',. . if .S. Nuclear Regulatory Commission ,
.~- LCV-I l l i-A' ' -
- - Page 6 During our telephone conversation of February 13,1998, the NRC staff asked about our policy regarding entry into an extended DG AOT in the event ofimpending severe weather. We referred the staff to our submit"I LCV-1111, Enclosure 2, page 7 which contains the following statement:
- 1 An EDG extended A'OT will not be entered for scheduled maintenance purposes if severe weather conditions are expected.
On page 8 of Enclosure 2 to LCV-1111, SNC states that VEGP will have procedures in place to implement the above commitment (plus the other commitments discussed on pages 7 and 8 of Enclosure 2 to LCV-1111) prior to entering an extended DG AOT.
i Finally, SNC notes that our submittal LCV.l l l 1 pmvided definitions of Level 1, Level 2, and Level 3 PRAs which has apparently been a source of confusion. The definition of a Level 3 PRA was not intended to imply that SNC uses a Level 3 PRA. SNC does not use or possess a Level 3 PRA for the Configuration Risk Management Program (CRMP) nor for any other purpose.
Should you have any questions or need further information, please contact this office.
Sincerely, C. K. McCoy CKM/NJS cc: Southern Nuclear Operating Company Mr. J. B. Beasley, General Manager, VEGP Mr. M. Sheibani, NSAC Supervisor, VEGP NORMS U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. D.11. Jaffe, Senior Project Manager, NRR ,
Mr. John Zeiler, Senior Resident inspector, VEGP 1