Forwards Safety Evaluation Granting Request for Temporary Relief from ASME BPV Code,Section XI Requirements to Repair Valves Under Provisions of 10CFR50.55a(g)(5)(iii).Relief for Unit 2 Expires at End of Cycle 9 Outage
ML20217M408
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 04/03/1998
From: Berkow H
NRC (Affiliation Not Assigned)
To: Gordon Peterson
DUKE POWER CO.
Shared Package
ML20217M411 List:
References
TAC-MA0169, TAC-MA0170, TAC-MA169, TAC-MA170, NUDOCS 9804080096
Download: ML20217M408 (4)


Text

s j

Mr. G:ry R. Peterson April 3, 1998 Site Vice President Catawba Nuclear Station Duke Energy Corporation 4800 Concord Road York, South Carolina 29745-9635

SUBJECT:

CATAWBA NUCLEAR STATION, UNITS 1 AND 2 - REQUEST FOR TEMPORARY RELIEF FROM ASME CODE REPAIR REQUIREMENTS FOR ASME CLASS 3 SERVICE WATER SYSTEM VALVES (TAC MA0169 AND MA0170)

Dear Mr. Peterson:

By letter dated November 26,1997, Duke Energy Corporation (the licensee) requested the

. NRC staff to approve a temporary relief from the American Society of Mechanical Engineers 1 Boiler and Pressure Vessel Code (Code),Section XI requirements to repair the valves under the provisions of 10 CFR 50.55a(g)(5)(iii).- The temporary relief would permit non-Code repair: - -

of service water flow control valves,1RN-291,2RN-291,1RN-351, and 2RN-351.

The staff has reviewed and evaluated the submitted information. Details of the staffs review L are delineated in the enclosed Safety Evaluation. The staff finds that performance of an immediate Code repair is impractical as defined in Generic Letter 90-05. Therefore, relief is granted pursuant to 10 CFR 50.55a(g)(6)(i). The relief is granted retroactively to Unit 1, and expired at the end of the cycle 10 refueling outage (December 1997). The relief for Unit 2 will expire at the end of the cycle 9 outage, or the next scheduled outage exceeding 30 days, whichever comes first.

Sincerely, Original signed by:

Herbert N. Berkow, Director Project Directorate ll-2 Division of Reactor Projects - 1/ll Office of Nuclear Reactor Regulation j iI

' Docket Nos. 50-413 and 50-414

Enclosure:

Safety Evaluation '

cc w/ encl: See next page DISTRIBUTION MTschiltz, EDO GGeorgiev,0-7 H-15 OGC 1hi Docket File - ACRS LPlisco, Ril

~ PUBLIC - PD 11-2 Rdg. COgle, Ril GHill(4) BBoger e-mail TLH3 SE only DOCUMENT NAME: G:\ CATAWBA \CATA0189.RR

To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No co y OFFICE PM:PDil-2 ' l- LA:PDil-2 OGC l D:h l l l NAME PTAM:cn /f/k LBERRY* M. Young
  • hibESQVIf DATE 4/ $ /98 " 1 3 '/ 2 /98 3 / 26 /98 tf/1/98 - / /97 / /97 s

?See previous concurrence OFFICIAL RECORD COPY 9904090096 980403 PDR ADOCK-05000413

.f~ 13 g g vJ tl w

~

~ _ , _. . c- . _ -- T--

~

~ '

{'

v 8

[ 'g ' UNITED STATES.

h NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 3g33s4g01 April 3,1998 Mr. Gary R. Peterson Site Vice President Catawba Nuclear Station -

Duke Energy Corporation 4800 Concord Road York, South Carolina 29745-9635 l

SUBJECT:

CATAWBA NUCLEAR STATION, UNITS 1 AND 2 - REQUEST FOR TEMPORARY

. . . RELIEF FROM ASME CODE REPAIR REQUIREMENTS FOR ASME CLASS 3 ~ l SERVICE WATER SYSTEM VALVES (TAC MA0169 AND MA0170)

Dear Mr. Peterson:

By letter dated November 26,1997, Duke Energy Corporation (the licensee) requested the NRC staff to approve a temporary relief from the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (Code),Section XI requirements to repair the valves under the provisions of 10 CFR 50.55a(g)(5)(iii). The temporary relief would permit non-Code repair of service water flow control valves,1RN-291,2RN-291,1RN-351, and 2RN-351.

The staff has reviewed and evaluated the submitted information. Details of the staffs review are delineated in the enclosed Safety Evaluation. The staff finds that performance of an immediate Code repair is impractical as defined in Generic Letter 90-05 Therefore, relief is granted pursuant to 10 CFR 50.55a(g)(6)(i). The relief is granted retroactively to Unit 1, and expired at the end of the cycia 10 refueling outage (December 1997). The relief for Unit 2 will expire at the end of the cycle 9 outage, or the next scheduled outage exceeding 30 days, whichever comes first.

Sincerely, ,

o

! i A-rt N. Berkow, Director oject Directorate 11-2 Division of Reactor Projects- t/ll Office of Nuclear Reactor Regulation Docket Nos. 50-413 and 50 414

Enclosure:

Safety Evaluation cc w/ encl: See next page l

_.._ ..-...._ -..._.. . m _ -- . _ ._ _ _

.~g Catawba Nuciear Station ,

I' cc:

Mr. M. S. Kitlan North Carolina Electric Membership Regulatory Compliance Manager CorporaGon )

Duke Energy Corporation P. O. Box 27306 _

4800 Concord Road Raleigh, North Carolina 27611 York, South Carolina 29745' Senior Resident inspector Mr. Paul R. Newton U.S. Nuclear Regulatory Commission Legal Department (PB05E) 4830 Concord Road ~

Duke Energy Cort,0.Gon - -

~ ~

- - - I - York,-South Carolina 29745 ' ~ - - -

j

. 422 South Church Street '

' Charlotte, North Carolina 28242 Regional Administrator, Region 11 U. S. Nuclear Regulatory Commission

J. Michael McGarry, lil, Esquire - Atlanta Federal Center Winston and Strawn 61 Forsyth Street, S.W., Suite 23T85 1400 L Street, NW Atlanta, Georgia 30303 Washington, DC 20005 Max Batavia, Chief North Carolina Municipal Power Bureau of Radiological Health Agency Number 1 South Carolina Department of 1427 Meadowwood Boulevard Health and Environmental Control P. O. Box 29513 2600 Bull Street Raleigh, North Carolina 27626 Columbia, South Carolina 29201 Mr. Peter R. Harden, IV L. A. Keller Account Sales Manager Manager- Nuclear Regulatory Westinghouse Electric Corporation Licensing Power Systems Field Sales Duke Energy Corporation P. O. Box 7288 526 South Church Street Charlotte, North Carolina 28241 Charlotte', North Carolina 28242-0001 County Manager of York County Saluda River Electric

- York County Courthouse P. O. Box 929 York, South Carolina 29745 Laurens, South Carolina 29360 Piedmont Municipal Power Agency Ms. Karen E. Long

.121 Village Drive Assistant Attomey General

. Greer, South Carolina 29651 North Carolina Department of Justice P. O. Box 629 -

Raleigh North Carolina 27602:

Elaine Wathen, Lead REP Planner Division of Emergency Management 116 West Jones Street Raleigh, North Carolina 27603-1335 h

I

L

. Catawba Nuclear Station cc:

Mr. T. Richard Puryear -

Owners Group (NCEMC)

Duke Energy Corporation 4800 Concord Road York, South Carolina 29745 Richard M. Fry, Director ~ .. . .

"'~-

' ~ - '

- Division of Radiation Protectiori - - -

North Carolina Department of Environment, Health, and Natural Resources 3825 Barrett Drive Raleigh, North Carolina 27609-7721 e

W I

I 1.

i

,