ML20249A233

From kanterella
Revision as of 07:39, 16 March 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Informs That QA Program Description Is Acceptable,Based on Review of Organizational Changes Described in Submittals & Addressing of NRC Comments in 980527 Submittal
ML20249A233
Person / Time
Site: Framatome ANP Richland
Issue date: 06/11/1998
From: Black S
NRC (Affiliation Not Assigned)
To: Powers C
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
References
NUDOCS 9806160207
Download: ML20249A233 (1)


Text

Mr.,Chris M. Powers, Vice Presid:nt

    • ' duality cnd Regulatory Affrirs June 11, 1998 Siemens Power Corporation Nuclear Headquarters iMM l 2101 Hom Rapids Road P,ost Office Box 130 Richland, Washington 99352-0130

Subject:

ACCEPTANCE OF SIEMENS POWER CORPORATION QUALITY ASSURANCE PROGRAM TOPICAL REPORT, REVISION 29

Dear Mr. Powers:

We have completed our review of the subject topical report, EMF-1, " Quality Assurance Program for Nuclear Fuels and Services", Revision 29, submitted by your letter of March 19, 1998. Our review included your original information submitted in that letter and additional information provided by your letter dated May 27,1998.

These submittals describe an organizational change within Siemens Power Corporation -

Nuclear Division (SPC-ND) and also address a realignment of the two divisions within Kraftwerk Union (KWU) which are SPC-ND affiliates in the Siemens Nuclear Fuels Business. In addition, revised topical report pages wbmitted with the May 27,1998, letter adequately address com-ments we discussed in confere, e.e calls with you on May 14 and 15,1998. Specific items addressed in this later submittal li clude 1) the qualification requirements for the Manager, Engineering Quality Performance,2) clarification of the relationship between the Global Quality Manager and the affiliate QA Managers,3) the controlling QA programs for the activities per-formed in Europe and those performed in the United States 4) the involvement of the Quality organization in the selection of Sub-Contractors within the Siemens Nuclear Fuels Business, and 5) the conditions for acceptance of your internal audit program which were previously discussed in our January 16,1996 letter to you.

Based on our review of the organizational changes described in these submittals and your addressing of our comments in the May 27,1998, submittal, we have determined that your /

quality assurance program description is acceptable in that it will continue to satisfy the d requirements of 10 CFR Part 50, Appendix B.

Sincerely, Original signed by: Robert A. Gramm for/

g Suzanne C. Black, Chief Ouality Assurance, Vendor inspection and hg Maintenance Branch h @Y "

Division of Reactor Controls and Human Factors i

, , , , i 4 ~) Office of Nuclear Reactor Regulation DISTRIBUTION:

Central File /PDR HOMB R.F. Vendor QAP File RLSpessard EWang JBirmingham AMendiola h 3rm DOCUMENT NAME: siemens.q98 To receive a copy of this document, Indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy ]

OFFICE HOMB/DRCH C, HOMB/DRCH,e . HOMB/DRCH (, HQMB/DRCH lC NAME R. Smith ML W.Haass //;/V/( R.Gramm(2[o S. Black Rb W DATE 06A/98 06/4/98 06/#98 06AV98 06/ /98 l 9906160207 990611 1 PDR ADOCK 07001257 . RECORD COPY j C PDR}