ML20217D594

From kanterella
Revision as of 02:35, 5 March 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Tech Specs Re Change to Basis 3/4.6.4 Which Modifies Accuracy Range Associated W/Measured Std Cubic Feet Per Minute & Corrects Listed Component Number
ML20217D594
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/30/1998
From:
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20217D587 List:
References
NUDOCS 9804240386
Download: ML20217D594 (5)


Text

.

l Docket No. 50-423 817001 Attachment 2 Millstone Nuclear Power Station, Unit No. 3 Marked Up Technical Specification Page l l l

1 l

l l

April 1998 9004240386 980417 PDR ADOCK 05000423 p PDR

7/30/97 CONTAINMENT SYSTEMS BASES 3/4.6.4 COMBUSTIBLE GAS CONTROL (Continued)

1. Definitions and constants CFM - cubic feet per minute RPM - revolutions per minute Blower RPM '4550 Blower ft*/ revolution .028 ft*

Standard CFM - gas volume converted to conditions of 68'F and 14.7 psia.

2. Measure and record the following information:

Pcontainment--Avera;e of 3LMS*P934, 935, 936, and 937 (psia)

Pout--From 3HCS 1A or B (psia)

Tc--Containment temperature (*F)

Pin--Measure with a new inlet gauge or calculate from Equation 3a below (psia) ,

scfm measured--See Procedure / Form 3613A.3-1 AP,--From Table 2 (psi)

A--As found Slip Constant Accuracy--Instrument accuracy range from Table 1.

3. Calculate as found slip constant (A)
a. Pin - Pcontainment - AP, scfm Accuracy - -

3550 -

ineasured . J4 a l Tc 4 460 m

0.028

  • 0.55 ..

, Pin 528 .,

A=

Egyi , 14.7 ' - 14.7 % , ' lea l , Tc + 460 'I

,, Pin . , , Pin 528 , j I

i B 3/4 6-3a Amendment No. p . 142  !

et;ILLSTONE - UNIT 3 I

7/30/97 CONTAINMERT SYSTEMS B'ASES 3/4.6.4 COMBUSTIBLE GAS CONTROL (Continued)

4. Calculate expected postaccident flow rate using A calculated in Step 3.
a. Slip RPM

- A * (4.937)%

  • 1.218
b. Actual Inlet CFM ACFM .028 (3550 - Slip RPM)
c. Standard CFM scfm - ACFM 0.725  !
d. Postaccident scfm Minimum - scfm
  • 0.53 e .' Acceptance Flow Rate Postaccident scfm minimum 1 41.52 scfm.

Table 1 Accuracy Range (Ref. 2) scfm (measured) Accuracy Ra' nae

'O 30 10t-40 9 13 set e 40 to450 6 'll ul4dHeim So todbo 5 BI S&fr" 60 56 toL9% 90 617 S$'4r7-sefs Table 2 Inlet Piping loss (Ref.1) scfm Heasured AP, (psi)

(Unad.iust ed) 30 .21 40 .31 50 .52 60 .73 70 .98 80 1.28 4

References:

1. Calculation 90-RPS-722GM, " Flow Acce 3HCS*RBNR 1A/B Blowers 3HCS* CIA /B." ptance Criteria for
2. Calculation PA 90-L0E-0132GE, "Hyurogen Recombindh Flow ,

e Error Analysis.' '

The acceptance flow rate is the required flow rate at the worst case containment conditions 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after the LOCA. The analysis assumes the recombiners are started no later than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after the accident. The 4530 18-month surveillance shall verify the gas temperature and blower flow rate concurrently.

MILLSTONE - UNIT 3 8 3/4 6-3b Amendment No. 77,142 04M

t Docket No. 50-423 B17001 i

l l

l Attachment 3 l l M;llstone Nuclear Power Station, Unit No. 3

! Retyped Technical Specification Page i

i April 1998

l

\

CONTAINMENT SYSTEMS BASES 3/4.6.4 COMBUSTIBLE GAS CONTROL (Continued)

1. Definitions and constants CFM - cubic feet per minute l

l RPM - revolutions per minute l

! Blower RPM - 3550  !

1 1 8

l Blower ft / revolution = .028 ft I

Standard CFM - gas volume converted to conditions of 68'F and 14.7 psia.

l 2. Measure and record the following information:

l l Pcontainment--Average of 3LMS*P934, 935, 936, and 937 (psia)

Pout--From 3HCS*PIIA or B (psia) l l Tc--Containment temperature ('F) 1 Pin--Measure with a new inlet gauge or calculate from Equation 3a below (psia) j l

scfm measured--See Procedure / Form 3613A.3-1 AP,--From Table 2 (psi)

A--As found Slip Constant Accuracy--Instrument accuracy range from Table 1.

3. Calculate as found slip constant (A)
a. Pin - Pcontainment - AP, b.

~

3550 '[ ' measured

  • 14.7
  • Tc + 460 ll 0.028
  • 0.95 Pin 528 A-Ecut
  • 14.7 - 14.7  %* ' M
  • Tc + 460'  %

Pin 4 l Pin 528 i 1

l MILLSTONE - UNIT 3 B 3/4 6-3a Amendment No. 77, Jf7 0500