MONTHYEARML20212B1681999-09-13013 September 1999 Forwards Insp Repts 50-275/99-12 & 50-323/99-12 on 990711- 08-21.Four Violations Being Treated as Noncited Violations ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H6181999-07-27027 July 1999 Forwards Insp Repts 50-275/99-07 & 50-323/99-07 on 990503- 0714.Apparent Violations Being Considered for Escalated Enforcement Action ML18107A7011999-06-25025 June 1999 Requests Rev of NRC Records to Reflect Change of PG&E Address ML20205J3381999-04-0808 April 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision Expired. Commission Declined Any Review & Became Final Agency Action on 990406.With Certificate of Svc.Served on 990409 DCL-99-038, Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f)1999-03-31031 March 1999 Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f) DCL-99-033, Forwards Change 16 to Rev 18 of Diablo Canyon Power Plant Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Safeguards Effectiveness of Plan.Without Encl1999-03-12012 March 1999 Forwards Change 16 to Rev 18 of Diablo Canyon Power Plant Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Safeguards Effectiveness of Plan.Without Encl DCL-99-010, Forwards Change 15 to Rev 18 of Dcnpp Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan.Encl Withheld1999-01-26026 January 1999 Forwards Change 15 to Rev 18 of Dcnpp Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan.Encl Withheld ML20202A9831999-01-18018 January 1999 Informs That Modesto Irrigation District No Longer Seeking Addl Interconnection with Pacific Gas & Electric Co at Pittsburg,Ca & Matters First Addressed in 980429 Comments in Opposition to Restructuring of Util Have Now Become Moot IR 05000275/19980121999-01-13013 January 1999 Informs That Insp Repts 50-275/98-12 & 50-323/98-12 Have Been Canceled DCL-98-163, Forwards Change 14 to Rev 18 of Physical Security Plan. Changes Do Not Decrease Safeguards Effectiveness of Plan & Submitted Pursuant to 10CFR50.54(p).Encl Withheld1998-11-24024 November 1998 Forwards Change 14 to Rev 18 of Physical Security Plan. Changes Do Not Decrease Safeguards Effectiveness of Plan & Submitted Pursuant to 10CFR50.54(p).Encl Withheld ML20195G5161998-11-16016 November 1998 Forwards Insp Repts 50-275/98-16 & 50-323/98-16 on 980913- 1024.No Violations Noted ML20155F7951998-11-0303 November 1998 Second Partial Response to FOIA Request for Documents. Records Subj to Request Encl & Identified in App C DCL-98-123, Submits Listed Address Changes for NRC Service Lists for Listed Individuals1998-09-0909 September 1998 Submits Listed Address Changes for NRC Service Lists for Listed Individuals DCL-98-108, Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year..1998-08-0707 August 1998 Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year.. ML20236T2931998-07-24024 July 1998 Forwards Order Prohibiting Involvement in NRC Licensed Activities for 5 Yrs.Order Being Issued Due to Falsification of Info on Application to Obtain Unescorted Access to PG&E Plant ML20236T3431998-07-22022 July 1998 Forwards Insp Repts 50-275/98-11 & 50-323/98-11 on 980526-28.Apparent Violations Identified & Being Considered for Escalated Enforcement Action ML20236J2251998-07-0101 July 1998 Ltr Contract,Task Order 232 Entitled, Review of Callaway, Comanche,Diablo Canyon & Wolf Creek Applications for Conversion to Improved TS Based on Standard TS, Under Contract NRC-03-95-026 ML20236G0691998-06-19019 June 1998 Forwards Endorsement 123 to Neila Policy NF-228,Endorsement 145 to Neila Policy NF-113,Endorsement 124 to Neila Policy NF-228 & Endorsement 89 to Maelu Policy MF-103 IR 05000275/19980051998-04-17017 April 1998 Forwards Insp Repts 50-275/98-05 & 50-323/98-05 on 980202-06 & 23-27 & 0302-18.No Violations Noted.Insp Focused on Resolution of Previous NRC Insp Findings & Included Review of Issues Identified During Architect/Engineering Insp Rept ML20203G0371998-02-25025 February 1998 Forwards Revised Copy of NRC Form 398, Personal Qualification Statement - Licensee, (10/97) Encl 1,which Has Been Revised to Reflect Current Operator Licensing Policy DCL-98-014, Forwards Change 12 to Rev 18 to Physical Security Plan,Per 10CFR50.54(p).Plan Withheld1998-02-10010 February 1998 Forwards Change 12 to Rev 18 to Physical Security Plan,Per 10CFR50.54(p).Plan Withheld ML20199H6691998-02-0202 February 1998 Ack Receipt of ,Transmitting Rev 18,change 11, to Plant Physical Security Plan,Submitted Under Provisions of 10CFR50.54(p).Role of Video Capture Audible Alarm Sys Needs to Be Addressed in Security Plan,Per 980123 Telcon DCL-97-187, Forwards Change 11,rev 18 to Physical Security Plan.Encl 1 Describes Proposed Revs to Physical Security Plan.Plan Withheld1997-11-19019 November 1997 Forwards Change 11,rev 18 to Physical Security Plan.Encl 1 Describes Proposed Revs to Physical Security Plan.Plan Withheld IR 05000275/19970181997-10-31031 October 1997 Forwards Insp Repts 50-275/97-18 & 50-323/97-18 on 971006- 10.Insp Verified That Liquid & Gaseous Radioactive Waste Effluent Mgt Program Was Properly Implemented.No Violations Noted DCL-97-156, Provides Change 10 to Rev 18 of Physcial Security Plan & Change 2 to Rev 3 of Safeguards Contingency Plan.Plans Withheld1997-09-16016 September 1997 Provides Change 10 to Rev 18 of Physcial Security Plan & Change 2 to Rev 3 of Safeguards Contingency Plan.Plans Withheld ML20210H4671997-08-0202 August 1997 Requests That NRC Suspend Investigation & Review of Issues Raised by Modesto Irrigation District & Transmission Agency of Northern CA Re Contention That PG&E Had Violated Nuclear License Conditions Known as Stanislaus Commitments ML20137N1591997-03-31031 March 1997 Informs That Licensee Facility Scheduled to Administer NRC GFE on 970409.Sonalsts,Inc Authorized Under Contract to Support NRC Administration of GFE Activities ML16343A4801997-02-25025 February 1997 Forwards non-proprietary WCAP-14796 & Proprietary WCAP-14795, Nrc/Util Meeting on Model 51 SG Tube Integrity & ARC Methodology. Proprietary Rept Withheld,Per 10CFR2.90 ML20134H6271997-02-10010 February 1997 Fifth Partial Response to FOIA Request for Documents.Records in App I Encl & Available in Pdr.App J Records Withheld in Part (Ref FOIA Exemption 5) & App K Records Completely Withheld (Ref FOIA Exemption 5) ML20134K3421997-02-0606 February 1997 Conveys Results & Conclusions of Operational Safeguards Response Evaluation Conducted by NRR at Plant,Units 1 & 2, on 960909-12.W/o Encl ML16342D5291997-01-31031 January 1997 Transmits WCAPs Supporting NRCs Review of License Amend Request 96-10,rev of TSs to Support Extended Fuel Cycles to 24 months.WCAP-11082,rev 5,WCAP-11594,rev 2 & WCAP-14646,rev 1 Withheld ML16342D5331997-01-24024 January 1997 Requests Proprietary Version of WCAP-14646,rev 1, Instrumentation Calibration & Drift Evaluation for Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation, Jan 1997 Be Withheld from Public Disclosure Per 10CFR2.790 ML16342D5311997-01-24024 January 1997 Requests That WCAP-11594,rev 2, W Improved Thermal Design Procedure Instrument Uncertainty Methodology,Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation Be Withheld from Public Disclosure,Per 10CFR2.790 ML16342D5321997-01-24024 January 1997 Requests WCAP-11082,rev 5, Westinghouse Setpoint Methodology for Protection Sys,Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation, Jan 1996 Be Withheld from Public Disclosure Per 10CFR2.790 ML20136C3521997-01-11011 January 1997 Discusses Japan Oil Spill & Np Intake & Possibilities of Such Event Occurring at SONGS or Dcnpp ML20133F8961997-01-0909 January 1997 Responds to NRC Ltr of 961206 Received on 961210 Which Requested Further Info Re Utils Violations of Conditions of Its Nuclear Licenses Designated to Promote & Protect Competition in Bulk Power Market in Northern & Central CA ML20133F8721997-01-0909 January 1997 Acks & Responds to NRC Ltr of 961206 Received by Undersigned on 961210 Requesting Further Info to Document Tancs Assertion,Per Filing on 960429 That Util Has Violated Terms & Conditions of Nuclear Power Project Licenses ML16342D5521996-12-18018 December 1996 Requests That Proprietary WCAP-14795, Nrc/Util Meeting on Model 51 SG Tube Integrity & ARC Methology, Be Withheld (Ref 10CFR2.790(b)(4)) ML20129J4001996-10-18018 October 1996 Forwards Order Approving Corporate Restructuring by Establishment of Holding Company & Safety Evaluation NSD-NRC-96-4846, Transmits Proprietary & non-proprietary Versions of Preliminary Rept, Incomplete Rcca Insertion. W Authorization ltr,AW-96-1021 & Affidavit Requesting Info Be Withheld from Public Disclosure Encl1996-10-16016 October 1996 Transmits Proprietary & non-proprietary Versions of Preliminary Rept, Incomplete Rcca Insertion. W Authorization ltr,AW-96-1021 & Affidavit Requesting Info Be Withheld from Public Disclosure Encl ML20129G6121996-09-24024 September 1996 Second Partial Response to FOIA Request for Documents. Forwards Documents Listed in App C,E,F & G.Documents Available in Pdr.App E,F & G Documents Partially Withheld Ref FOIA Exemptions 4 & 6.App D Record Listed as Copyright DCL-96-170, Forwards Change 1 to Rev 4 of Training & Qualification Plan, Per 10CFR50.54(p).Plan Withheld1996-08-14014 August 1996 Forwards Change 1 to Rev 4 of Training & Qualification Plan, Per 10CFR50.54(p).Plan Withheld DCL-96-141, Submits Change 9 to Rev 18 of Physical Security Plan.Plan Withheld1996-07-31031 July 1996 Submits Change 9 to Rev 18 of Physical Security Plan.Plan Withheld ML20116B8411996-07-22022 July 1996 Forwards Revisions to SR 95-03,SR 95-04 & SR 95-05 Re EDG 1-2 Valid Failures ML20117E6171996-05-24024 May 1996 Forwards Public Version of Rev 11 to EPIP EP R-7, Off-Site Transportation Accidents DCL-96-102, Submits Change 8 to Rev 18 of Physical Security Plan,Per 10CFR50.54(p).Encl Withheld1996-05-0606 May 1996 Submits Change 8 to Rev 18 of Physical Security Plan,Per 10CFR50.54(p).Encl Withheld DCL-96-096, Forwards Public Version of Rev 3 to Diablo Canyon Power Plant Units 1 & 2 Emergency Plan, Change 151996-04-16016 April 1996 Forwards Public Version of Rev 3 to Diablo Canyon Power Plant Units 1 & 2 Emergency Plan, Change 15 DCL-96-054, Forwards Change 7 to Rev 18 of Physical Security Plan & Change 1 to Rev 3 of Safeguards Contingency Plan.Encl Withheld1996-02-28028 February 1996 Forwards Change 7 to Rev 18 of Physical Security Plan & Change 1 to Rev 3 of Safeguards Contingency Plan.Encl Withheld 1999-09-13
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20212B1681999-09-13013 September 1999 Forwards Insp Repts 50-275/99-12 & 50-323/99-12 on 990711- 08-21.Four Violations Being Treated as Noncited Violations ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H6181999-07-27027 July 1999 Forwards Insp Repts 50-275/99-07 & 50-323/99-07 on 990503- 0714.Apparent Violations Being Considered for Escalated Enforcement Action ML20205J3381999-04-0808 April 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision Expired. Commission Declined Any Review & Became Final Agency Action on 990406.With Certificate of Svc.Served on 990409 IR 05000275/19980121999-01-13013 January 1999 Informs That Insp Repts 50-275/98-12 & 50-323/98-12 Have Been Canceled ML20195G5161998-11-16016 November 1998 Forwards Insp Repts 50-275/98-16 & 50-323/98-16 on 980913- 1024.No Violations Noted ML20155F7951998-11-0303 November 1998 Second Partial Response to FOIA Request for Documents. Records Subj to Request Encl & Identified in App C ML20236T2931998-07-24024 July 1998 Forwards Order Prohibiting Involvement in NRC Licensed Activities for 5 Yrs.Order Being Issued Due to Falsification of Info on Application to Obtain Unescorted Access to PG&E Plant ML20236T3431998-07-22022 July 1998 Forwards Insp Repts 50-275/98-11 & 50-323/98-11 on 980526-28.Apparent Violations Identified & Being Considered for Escalated Enforcement Action ML20236J2251998-07-0101 July 1998 Ltr Contract,Task Order 232 Entitled, Review of Callaway, Comanche,Diablo Canyon & Wolf Creek Applications for Conversion to Improved TS Based on Standard TS, Under Contract NRC-03-95-026 IR 05000275/19980051998-04-17017 April 1998 Forwards Insp Repts 50-275/98-05 & 50-323/98-05 on 980202-06 & 23-27 & 0302-18.No Violations Noted.Insp Focused on Resolution of Previous NRC Insp Findings & Included Review of Issues Identified During Architect/Engineering Insp Rept ML20203G0371998-02-25025 February 1998 Forwards Revised Copy of NRC Form 398, Personal Qualification Statement - Licensee, (10/97) Encl 1,which Has Been Revised to Reflect Current Operator Licensing Policy ML20199H6691998-02-0202 February 1998 Ack Receipt of ,Transmitting Rev 18,change 11, to Plant Physical Security Plan,Submitted Under Provisions of 10CFR50.54(p).Role of Video Capture Audible Alarm Sys Needs to Be Addressed in Security Plan,Per 980123 Telcon IR 05000275/19970181997-10-31031 October 1997 Forwards Insp Repts 50-275/97-18 & 50-323/97-18 on 971006- 10.Insp Verified That Liquid & Gaseous Radioactive Waste Effluent Mgt Program Was Properly Implemented.No Violations Noted ML20137N1591997-03-31031 March 1997 Informs That Licensee Facility Scheduled to Administer NRC GFE on 970409.Sonalsts,Inc Authorized Under Contract to Support NRC Administration of GFE Activities ML20134H6271997-02-10010 February 1997 Fifth Partial Response to FOIA Request for Documents.Records in App I Encl & Available in Pdr.App J Records Withheld in Part (Ref FOIA Exemption 5) & App K Records Completely Withheld (Ref FOIA Exemption 5) ML20134K3421997-02-0606 February 1997 Conveys Results & Conclusions of Operational Safeguards Response Evaluation Conducted by NRR at Plant,Units 1 & 2, on 960909-12.W/o Encl ML20129J4001996-10-18018 October 1996 Forwards Order Approving Corporate Restructuring by Establishment of Holding Company & Safety Evaluation ML20129G6121996-09-24024 September 1996 Second Partial Response to FOIA Request for Documents. Forwards Documents Listed in App C,E,F & G.Documents Available in Pdr.App E,F & G Documents Partially Withheld Ref FOIA Exemptions 4 & 6.App D Record Listed as Copyright ML20149H8171994-12-23023 December 1994 Advises That 941010 & 1102 Changes 4 & 5 to Rev 18 of Physical Security Plan,Respectively Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20059L5031994-01-28028 January 1994 Extends Invitation to Participate in Workshop Re Emergency Preparedness & Incident Response on 940222 in Arlington,Tx ML20058A1211993-11-16016 November 1993 Forwards Safeguards Info Referenced in Preliminary Draft Guide Re Proposed Rule for Protection Against Manevolent Use of Vehicles at Nuclear Power Plants.Encl Withheld IR 05000275/19930211993-08-27027 August 1993 Forwards Insp Repts 50-275/93-21 & 50-323/93-21 on 930726-30.Non-cited Violations Identified.Insp Repts Withheld in Entirety Ref 10CFR73.21 ML20057B3241993-05-0404 May 1993 Partial Response to FOIA Request for Documents.Forwards Documents Listed in App Q Which Are Being Made Available at Pdr.Documents Listed in App R Are Partially Withheld (Ref FOIA Exemption 5) ML20058M0361993-04-12012 April 1993 Partial Response to FOIA Request for Documents.Forwards Records in App L Which Are Being Withheld Partially for Listed Reasons,(Ref FOIA Exemptions 5) ML20056C2811993-01-29029 January 1993 Ltr Contract,Mod 1 to Task Order 5,providing Incremental Funding of Listed Amount,To IPE Reviews,Internal Events Back-End-Only ML20127F1091993-01-13013 January 1993 Extends Invitation to Participate as Breakout Session Facilitator on 930217-18 at Workshop Hosted by Regions IV & V in Arlington,Tx to Discuss Operability/Degraded Equipment as Specified in GL 91-18.Record Copy IR 05000275/19920321992-12-11011 December 1992 Forwards Insp Repts 50-275/92-32 & 50-323/92-32 on 921116-19 & Notice of Violation.Violation Noted Re Failure to Withdraw Security Safeguards Access List.Encls Withheld (Ref 10CFR73.21) IR 05000275/19920281992-12-0202 December 1992 Forwards Insp Repts 50-275/92-28 & 50-323/92-28 on 921005-09.No Violations Noted.Encl Withheld (Ref 10CFR73.21) ML20058B5331990-10-22022 October 1990 Forwards Partially Withheld Safeguards Insp Repts 50-275/90-17 & 50-323/90-17 on 900924-28.Licensee Identified Violations Reviewed But Not Cited ML20058N8501990-08-10010 August 1990 Responds to Forwarding Correspondence from Bl Boxer & Le Panetta Re Seismic Safety of Plant.Nrc Will Complete Review of Plant Seismic Reevaluation Program & Will Document Findings in SER DD-90-03, Advises That Time for Commission to Review Director'S Decision DD-90-03 Expired.Commission Declined Review. Decision Became Final Agency Action on 900724.Served on 900731.W/Certificate of Svc1990-07-27027 July 1990 Advises That Time for Commission to Review Director'S Decision DD-90-03 Expired.Commission Declined Review. Decision Became Final Agency Action on 900724.Served on 900731.W/Certificate of Svc ML20059M9781990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20246K4721989-08-28028 August 1989 Advises That 880419 Rev 2 to Guard Training & Qualification Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20246E5321989-08-22022 August 1989 Forward Summary of Sys Engineering/Design Engineering Initiatives & ...Quarterly Sys Status Rept,2nd Quarter 1989.... Rept Demonstrates Depth,Scope & Usefulness of Walkdown as Tool for Assessing Sys Status,Problems & Trends IR 05000275/19890201989-07-31031 July 1989 Forwards Safeguards Insp Repts 50-275/89-20 & 50-323/89-20 on 890710-14.No Violations Noted ML20245D9431989-04-18018 April 1989 Forwards Insp Repts 50-275/89-12 & 50-323/89-12 on 890403-07.No Violations or Deficiencies Noted IR 05000275/19890071989-03-24024 March 1989 Forwards Safeguards Insp Repts 50-275/89-07 & 50-323/89-07 on 890227-0303.No Violations Noted.Repts Withheld (Ref 10CFR2.790(d) & 73.21) ML20235W2621989-03-0101 March 1989 Final Response to FOIA Request for Transcripts Re Facility. Forwards App H Documents.App H Documents Also Available in Pdr.App I Documents Partially Withheld Per Sunshine Act ML20205R1641988-10-18018 October 1988 Final Response to FOIA Request for Documents.Informs That App a & B Documents Available in Pdr.Forwards Partially Deleted App B & C Documents (Ref FOIA Exemption 5) IA-88-102, Final Response to FOIA Request for Documents.Informs That App a & B Documents Available in Pdr.Forwards Partially Deleted App B & C Documents (Ref FOIA Exemption 5)1988-10-18018 October 1988 Final Response to FOIA Request for Documents.Informs That App a & B Documents Available in Pdr.Forwards Partially Deleted App B & C Documents (Ref FOIA Exemption 5) ML20205C3521988-09-23023 September 1988 Final Response to FOIA Request for Documents Re Plant. Forwards App D Documents.App D Documents Also Available in PDR ML20155F8691988-09-0808 September 1988 Final Response to FOIA Request for Documents.App a Documents Available in PDR IA-88-455, Final Response to FOIA Request for Documents.App a Documents Available in PDR1988-09-0808 September 1988 Final Response to FOIA Request for Documents.App a Documents Available in PDR ML20153H6121988-08-18018 August 1988 Final Response to FOIA Request.Forwards App E Documents.Apps D & E Documents Available in Pdr.Charges for Search, Duplication & Postage Listed ML20151X2161988-08-18018 August 1988 Ack Receipt of Transmitting Scenario for Util 1988 Annual Emergency Preparedness Exercise ML20153G9331988-08-15015 August 1988 Partial Response to FOIA Request for Documents.Forwards App C Document.Documents Available in PDR ML20153H1821988-08-12012 August 1988 Responds to 880505 Appeal of Denial of Documents & Portions of Documents Identified on Encl Apps E & F in 880425 Response to FOIA 87-444.Documents or Portions of Documents Continue to Be Withheld (Ref FOIA Exemption 5) ML20151U3741988-08-11011 August 1988 Informs of NRC Interpretation of 10CFR50.74(a) Re Changes in Operator or Senior Operator Status 1999-09-13
[Table view] |
See also: IR 05000275/1998011
Text
- _ _ _ - - - - _ - - _ _ - - - - _ _ _ _ _ _ _ _ - _ _ - _ _ - _ _ - - _ _ - - _ _ _ - . _ . - _ - _ _ _ _ _ . - - _ - _ .
.
\
pe etch UNITED STATES
.
/ \ NUCLEAR REGULATORY COMMISSION
'
I
.
R EGION IV
, . p 611 RYAN PLAZA DRIVE, SUITE 400 1
$ '%
9...../
l
ARLINGTON, TEXA3 760118004
{
JUL 2 21998 i
EA 98-312
l
I
Gregory M. Rueger, Senior Vice President
and General Manager
Nuclear Power Generation Bus. Unit
Pacific Gas and Electric Company
Nuclear Power Generation, B14A
77 Beale Street, Room 1451
P.O. Box 770000
San Francisco, California 94177
SUBJECT: NRC SPECIAL INSPECTION REPORT 50-275/98-11; 50-323/98-11 AND NRC
INVESTIGATION 4-1998-007
Dear Mr. Rueger:
From May 26-28,1998, a special inspection was conducted at your Diablo Canyon Nuclear
Power Plant, Units 1 and 2, reactor facility, with in-office reviews conducted through
June 25,1998. The enclosed report (Enclosure 1) presents the scope and results of that
inspection. The specialinspection followed an investigation conducted by the NRC's Office of
Investigations (01) to determine whether a willful violation of Diablo Canyon procedures had
occurred in December 1997. The results of the specialinspection and investigation were
discussed with your staff in an exit meeting on July 2,1998.
Based on the results of this inspection, two apparent violations were identified and are being
considered for escalated enforcement action in accordance with the " General Statement of
Policy and Procedure for NRC Enforcement Actions"(Enforcement Policy), NUREG-1600,
Revision 1.
The first apparent violation resulted from actions taken on December 15,1997, by a Unit 2 Shift
Foreman, with concurrence of the Shift Supervisor, to improperly authorize and perform a tagout
which was contrary to your procedures. Specifically, to perform repairs on a steam leak inside
containment using personnel standing by equipment, plus a caution tag, instead of the clearance
package described by the work order, and without modifying the work order, was contrary to the
requirements of your procedures and Technical Specification 6.8.1. Further, the investigation
concluded that three members of your staff involved in the repair activity willfully violated plant
procedures. Enclosure 2 is the synopsis of the 01 report concerning this incident, summarizing j/.
this finding.
1
DR DO O 00 75
G PDR L
__________a
.
e
Pacific Gas and Electric Company -2- j
{
The second apparent violation resulted from the failure of your staff to complete corrective
actions promptly, contrary to 10 CFR Part 50, Appendix B, Criterion XVI, in that there were j
unnecessary delays (in excess of 30 days) in completing your corrective actions. '
Please be advised that the number and characterization of apparent violations described in the !
enclosed inspection report may change as a result of further NRC review. Accordingly, no
Notice of Violation is presently being issued for these inspection findings.
A closed, transcribed predecisional enforcement conference to discuss these apparent
violations has been scheduled for August 21,1998. The decision to hold a predecisional
enforcement conference does not mean that the NRC has determined that a violation has
occurred or that enforcement action will be taken. This conference is being held to obtain
information to enable the NRC to make an enforcement decision, such as a common
understanding of the facts, root causes, missed opportunities to identify the apparent violation
sooner, corrective actions, significance of the issues, and the need for lasting and effective
corrective action. In addition, this is an opportunity for you to point out any errors in our
inspection report and for you to provide any information concerning your perspectives on (1) the
severity of the apparent violation, (2) the application of the factors that the NRC considers when
it determines the amount of a civil penalty that may be assessed in accordance with
Section VI.B.2 of the Enforcement Policy, and (3) any other application of the Enforcement
Policy to this case, including the exercise of discretion in accordance with Section Vll.
As part of our inspection, we have reviewed your independent investigation of this matter.
However, in order to ensure a complete information exchange during the predecisional
enforcement conferent.e:
- We request your presentation also include your evaluation, and its basis, of whether
each of the licensed individuals involved in the incident willfully violated your procedures
by their actions during the incident.
. We request that the three operations personnel identified in the Ol report as willfully l
violating procedures by their actions taken on December 15,1997 (the Shift Foreman, I
the Shift Supervisor, and the Senior Reactor Operator who performed the activity), attend
the conference. They should be prepared to discuss their involvement in the incident.
We will correspond separately with these individuals with regard to the potential for
enforcement action to be taken against them.
- Finally, we request that you describe the new or additional information identified by the
Quality Evaluation Q0011991 that required substantial new corrective actions beyond
those already taken for the incident.
You will be advised by separate correspondence of the results of our deliberations on this
matter. No response regarding these apparent violations is required at this time.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its I
enclosures will be placed in the NRC Public Documer,t Room.
,
l
l ,
. _
. <
l
-
1
'
Pacific Gas and Electric Company -3-
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you. ,
Sincer ,
!
, Thomas P$ Gwynn, D' e or
Division of Reactor P cts i
{
. Docket Nos.: 50-275
50-323
License Nos.: DPR-80
DPR-82
Enclosures:
1. NRC inspection Report
50-275/98-11; 50-323/98-11
2. Office of Investigations Synopsis 4-1998-007
cc w/ enclosures:
Dr. Richard Ferguson
Energy Chair i
Sierra Club California I
1100 lith Street, Suite 311 - ,
Sacramento, California 95814.
Ms. Nancy Culver
San Luis Obispo Mothers for Peace
P.O. Box 164
Pismo Beach, Califomia 93448
Chairman
San Luis Obispo County Board of
Supervisors
Room 370
County Government Center
j. San Luis Obispo, California 93408
Mr. Truman Burns \Mr. Robert Kinosian
California Public Utilities Commission
505 Van Ness, Rm. 4102
San Francisco, California 94102
_ _. ..
. . _ _ _ - __ _ _ _ _ -
7__
. .
!
.
'
Pacific Gas and Electric Company -4-
!
L- Robert R. Wellington, Esq.
Legal Counsel-
! ,- Diablo Canyon Independent Safety Committee
l- - 857 Cass Street,' Suite D -
t-
'- Monterey, California 93940
Mr. Steve Hsu
-
l- - Radiologic Health Branch -
/ State Department of Health Services' >
l P.O. Box 942732 -
Sacramento, Califomia 94234
r
Christopher J. Wamer, Esq.
,
Pacific Gas and Electric Company
l P.O. Box 7442
l - San Francisco, Califomia 94120
Robert P. Powers, Vice President .
l and Plant Manager
- Diablo Canyon Power Plant
P.O. Box 56
Avila Beach, Califomia 93424
, Managing Editor
Telegram-Tribune
1321 Johnson Avenue
P.O. Box 112
San Luis Obispo, Califomia 93406
!-
l
,
I
I
f
l
- _
_ _ _ _ _ _ _ _ _ - _-_ - _ - _ _ _ __ _ _ _ _ _ _ _ _ _ - _ _ _
'
, .
.
.. Pacific Gas and Electric Company -5-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bec to DCD (IE14)-
bec distrib. by RIV:
Regional Administrator Resident inspector
DRP Director ' DRS-PSB .
Branch Chief (DRP/E, WCFO) MIS System
Senior Project inspector (DRP/E, WCFO) RIV File
Branch Chief (DRP/TSS) RIV Office of Investigation
J. Lieberman, OE MS:7-H5 OE:EA File MS:7-H5
G. F. Sanbom, EO W. L. Brown, RC
A. T. Howell, DRS
DOCUMENT NAME: R:\_DC\DC811RP.DGA
- To receive copy of document, Indicate in box:"C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
RIV:Rl:DRP/E RE:DRS EO C:DRP/E C:OB D:DRP M
L 'b DGAcker:jb . RELantz * GFSanbom HJWong JLPellet TPGwynn pTP
7/15/98 (E) 7/9/98 7/15/98 (E) 7/15/98 (E) 7/15/98 (E) 7/22498 /{
- concurred on previous draft on 7/9/98 (was unavailable to concur on final revision)
OFFICIAL RECORD COPY
r.
L:
_ _ . _ _ _ __ ._ _
__ ___ ___ _,
'
e
.
Pacific Gas and Electric Company -5-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCC ESK)
bec to DCD (IE14)
bec distrib. by RIV:
Regional Administrator Resident inspector
DRP Director DRS-PSB
Branch Chief (DRP/E, WCFO) MIS System
Senior Project inspector (DRP/E, WCFO) RIV File
Branch Chief (DRP/TSS) RIV Office of Investigation
J. Lieberman, OE MS:7-H5 OE:EA File MS:7-HS
G. F. Sanborn, EO W. L. Brown, RC
A. T. Howell, DRS
DOCUMENT NAME: R:\_DC\DC811RP.DGA
To receive copy of document. Indict ' in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
RIV.RI:DRP/E l RE:DRS l EO l C:DRP/E l C:OB l D:DRP /d
DGAcker:jb RElantz * GFSanborn HJWong JLPellet TPGwynn p{ '
( 7/15/98 (E) 7/9/98 7/15/98 (E) 7/15/98 (E) 7/15/98 (E) 7/2/498 /
- concurred on previous draft on 7/9/98 (was unavailable to concur on final revision)
OFFICIAL RECORD COPY