ML20246D256

From kanterella
Revision as of 23:32, 13 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Tech Specs Revising Sections 3/4.2,B3/4.2,5.3.1 & 5.3.2 Re Removal of Fuel cycle-specific Operating Limits
ML20246D256
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 08/21/1989
From:
Public Service Enterprise Group
To:
Shared Package
ML20246D254 List:
References
LCR-89-16, NUDOCS 8908250305
Download: ML20246D256 (3)


Text

(~ .D' m

) y. .

1

.r . , - ~

.~

Reference:

-tcy 89-16 ATTACliMENT 2 MARKED-Up ECHNICAL SPECIFICATION PAgr_;7 l

8908250305 PDR 890821ADOCK 05000354 FDC p

DESIGN FEATURES 5.3 REACTOR CORE INSERT 1 FUEL ASSEMBLIES 5.3.1 The reactor core sham "contain 764 fuel assemblies <- - - - - - - - - - - ~

asgemo c tai in bz ryet oc na two gatergrocA cia wi Z'rca oy-Ea fu 1 r sh 11 ave N no in act've Y e1 ) ngt of 50 ne s. The

  • n it 1 re ad g all av a m4xim a rage enr' chm to 1. O igh p ce U- 5. Re .ad .uel hai be\simi ar ph ic de ign to e it1 i cor lo in I CONTROL ROD ASSEMBLIES INSERT 2
5. 3. 2 The reactor core shall contain 185rcontrol rod assemblies 2 c ch bo on a ( e c o e Nst inl s te s ath r '

5.4 REACTOR COOLANT SYSTEM DESIGN PRESSURE AND TEMPERATURE 5.4.1 The reactor coolant system is designed and shall be maintained:

a. In accordance with the code requirements specified in Section 5.2 of the FSAR, with allowance for normal degradation pursuant to the applicable Surveillance Requirements,
b. For a pressure of: 4 l
1. 1250 psig on the suction side of the recirculation pump.
2. 1500 psig from the recirculation pump discharge to the jet pumps.
c. For a temperature of 575 F. I VOLUME l

5.4.2 The total water and steam volume of the reactor vessel and recirculation i system is approximately 21,970 cubic feet at a nominal steam dome saturation '

temperature of 547'F.

5.5 METEOROLOGICAL TOWER LOCATION 5.5.1 The meteorological tower shall be located as shown on Figure 5.1.1-1.

HOPE CREEK 5-4 j L_____---_--_---------

(, ..

t- ..

g,...

INSERTS FOR IfR 89-16 i"

Insert 1 and shall be limited to those assemblies which have been approved for use in BWRs.

Insert 2 cruciform shaped Insert 3 The control material shall be boron carbide powder (B4C) and/or hafnium metal. The absorber material has a nominal absorber length of 143 inches.

I, 1

)

'1 i

l il 3

i i

1 4

.- I