Forwards Insp Rept 50-213/98-03 on 980414-0803 & 13 & Notice of Violation Re Failure to Control Plant Configuration During Valve Manipulations or Tagging Activities
ML20237D394
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 08/21/1998
From: Roberts M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mellor R
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20237D396 List:
References
50-213-98-03, 50-213-98-3, NUDOCS 9808260134
Download: ML20237D394 (3)


See also: IR 05000213/1998003

Text

- _

__ --_-_ _ _ - _ _ _ -. - - __ _ - _ _ _

'

,, ,

t

August 21, 1998

Mr. R. A. Mellor

Vice President - Operations and Decommissioning

Connecticut Yankee Atomic Power Company

362 Injun Hollow Road

East Hampton, CT 06424-3099

SUBJECT: NRC INTEGRATED INSPECTION REPORT 50-213/98-03

Dear Mr. Mellor:

On August 13,1998, the NRC completed an inspection at Connecticut Yankee Atomic

Power Company. The enclosed report presents the results of that inspection.

During the four month period covered by this inspection period, your conduct of activities

at the Haddam Neck Station facility was generally characterized by the gradual resumption

of radiological work associated with the preparation of procedures and equipment for the

primary system decontamination. In general, the plant staff performed well to safely

complete several maintenance and radiation protection tasks in the sequence prior to the

reactor coolant system decontamination. A notable exampie included the work to remove

the reactor vessel core barrel, which was completed with substantially less personnel

radiation exposure than in the past.

This inspection also noted several events that were exceptions to good performance.

Apparent violations of regulatory requirements were identified, which involved the failure to

classify an event in accordance with the emergency actions levels following an inadvertent

release of radioactive liquids; the failure to control the plant configuration during valve

manipulations or tagging activities, resulting in plant events; the failure to properly calibrate

the stack flow instruments used in the stack effluent pathway; and, the failure to provide

complete information in support of a license amendment application. We are particularly l

concerned with the number of operational occurrences that have occurred, and with the '

deficiencies that have been identified in surveillance procedures used to satisfy the

technical specification requirements. Therefore, in your response to Violations B and C,

'

you should describe, in detail: (a) the actions to address the underlying causes of plant I

configuration control and human performance issues; and (b) your plan and schedule to  !

provide an independent verification that the plant procedures for demonstrating compliance l

with technical specification surveillance requirements are acceptable.  :

I

The violations are cited in the enclosed Notice of Violation, and the circumstances

surrounding the violations are described in detail in the enclosed report. Please note that

i

you are required to respond to this letter and should follow the instructions specified in the  ;

enclosed Notice when preparing your response. The NRC will use your response, in part, ,

l

to determine whether further enforcement action is necessary to ensure compliance with 1

9908260134 99ves21 F

PDR

G

ADOCK 05000213

PDR

y

a

J  ;

LOUUvu OFFICIAL RECORD COPY

I

W_--_.-.__._. , _ _ _ _ - - - _ _ - - _ . - _ _ _ _ _ . . _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ________

,

'

. .

l

Mr. R. A. Mellor 2

regulatory requirements. You responded to these issues, in part, during telephone ,

conferences on July 8 and 15,1998, during a management meeting at the site on August

3,1998, and in letters CY-98-121 dated July 16,1998 and CY-98136 dated August 12, {

i

1998. In your response to the enclosed Notice, you need not repeat information already l

provided on the docket.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosures will be placed in the NRC Public Document Room (PDR).

i

Sincerely,

{

Original Signed byt

Mark C. Roberts, Chief

Decommissioning and Laboratory Branch

Division of Nuclear Materials Safety

Docket No. 50-213

License No. DPR-61 '

Enclosures:

1. Notice of Violation

2. NRC Inspection Report No. 50-213/98-03

cc w/encts:

D. Davis, President and Chief Executive Officer

T. Bennet, Vice President and Chief Hnancial Officer

D. Amerine, Vice President, Human Services

G. Bouchard, Unit Director

J. Haseltine, Engineering Director

G. van Noordennen, Licensing Manager

J. Ritsher, CYAPCO Counsel

R. Bassilakis, Citizens Awareness Network l

J. Block, Attorney for CAN  !

J. Brooks, CT Attorney General Office '

K. Ainsworth, Town of Haddam

State of Connecticut SLO

,

<

L

r '

r - - - - - - - - - - - - ------- ------ ------- - - -

. o

Mr. R. A. Mellor 3

Distribution w/encis:

Region i Docket Room (with concurrences)

PUBLIC

Nuclear Safety Information Center (NICE)

l NRC Resident inspector

l D. Screnci, PAO

! J. Wiggins, DRS

J. White,' DRS

J. Nick, DNMS

, R. Bellamy, DNMS

'

H. Miller, RA/W. Axelson, DRA

Distribution w/encls (VIA E-MAIL):

K. Kennedy, OEDO

S. Weiss, NRR, DRPM, PDND

T. Fredrichs, PM, NRR

M. Callahan, OCA

W. Travers, SPO

R. Correia, NRR

'

F. Talbot, NRR

D. Screnci, PAO, ORA

DOCDESK

Inspection Program Branch, NRR (IPAS)

I

DOCUMENT NAME: G:\D&LB\HN\98-03.RPT

To receive e copy of thie document, indicate in the boa: 'C' - Copy without ettschtnent/ enclosure *E' = Copy with attachment / enclosure

[ *N' = No copy

f OFFICE Rl/DNMS Rl/DNMS l l l

l

NAME R,AYMONF);@ ROBERTS W)UL

DATE fy /98 (

T" rA(/98

'

OFFICIAL RECORD COPY