ML20244B125

From kanterella
Revision as of 03:41, 23 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Provides Correlation Between Rev Numbers & Content & Listing of Revs on Review Sheet of Emergency Plan
ML20244B125
Person / Time
Site: University of Michigan
Issue date: 05/30/1989
From: Burn R
MICHIGAN, UNIV. OF, ANN ARBOR, MI
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20244B126 List:
References
NUDOCS 8906120297
Download: ML20244B125 (4)


Text

- - _ _

,/-' ,--

s.

~1 PW .g .. .-s  !

University of.~ Michigan J Michigan Memorial-Phoenix Project Office of the Director L> Ann Arbor, Michigan 48109-2100 i ss

.May 30,.1989. ~!

~

Docket.50-2.

R License-R-28 j' Ford Nuclear Reactor. Emergency Plan i

United States Nuclear Regulatory Comraission j

' Attn:' Document. Control Desk l Washington, D.C. 20555 l Gentlemen:

\

The purpose of'this letter is to provide correlation between  !

revision numbers and content and the listing of revisions on the l review' sheet of the Ford Nuclear Reactor Emergency Plan. l

-I.

Several items are' enclosed. First is the review and revision ']

record that was submitted as part of revision 5 to the Emergency J C Plan. Revision numbers, where they apply, are written to the l 4

right of the revised sections. An improved review and revision l record follows.which should make the content of each revision  !

easier to follow. Please replace.the present record, pages l' Contents-4 and Contents-5, with these reformatted pages.

Finally,-the submittal and approval letters for revisions one  ;

through four are enclosed. We have submitted and had approved .!

other'non-substantive revisions that qualify under 10CFR50.54(Q).  !

These are listed on the revised review and revision record, but a l revision number was not assigned, i a

Sincerely, i

Reed R. Burn, Manager Nuclear Reactor laboratory  ;

Michigan Memorial - Phoenix Project xc: United States Nuclear Regulatory Commission Attn: Theodore S. Michaels l Standardization and Non-Power Reactor Project Directorate i Division of Reactor Projects III, IV, V, and Special Projects 1 Office of Nuclear Reactor Regulation Washington, D.C. 20555 30th  !

' d and mornMore me, this day of MY --,19 !9., a Notary Public County, Enclosure in and for washtenaw -l Michigan. .y L t L.L 1_ L 1 _ 1U 906120297 890530 A0"[ C (signatw o NOTARY PUBUC w, O

ey 4

DR ADOCK 05000002 F

PNU , I f>y Commission erpires *""n* 6 : 19 1 l .

i


.-.-.__.-----__--___-D

FORD NUCLEAR REACTOR EMERGENCY PLAN Contents April 1. 1986 b

REVIEW AND REVISION RECORD The Ford Nuclear Reactor Emergency P1an and its appendices w211 be revi ewed , revised as required. s2gned by the Renttor Manager or i Assi stant Reactor Manager, and dated biennially and whenever l revi s2 ons are made. Substantive changes will be approved by the Safetv Rev2ew Committee and submitted to the U. S. Nuclear Regul atory Comm2 ssi on. Rev2 sed sect 2cns will be recorded on this page and on the appropriate page within the p1an. Revisions wi11 be issued to plan holders at the time of revis2cn.

SIGNATURE DATE REVISED SECTIONS AL e A v/v/u o p L'~ti -

RwLRAau--

ein,Je cd6&,,&va am f

M R 1t

.. k& -

& lR /g/$ll% &ktp3 --

  • ~

% cs L , 12h/w @a/4L cf -

b ,

4/h/e 7 # D A Y "'21 2 bt d

$ Y, al sj e7 h_is b T

  • W p)3/C9 Ytts &L 4 0. A M M Y CK ~ >> sie,  %~AW%)

N CEn _ alsle1 6T?M&H* *""""kl 1 ~%( n als/e1 QTa ffC&" WI l l A C_l' b l l %CE u 3/

Yii /t7n e Gbwhi u=l ' d2 cQ G} D I

  • h 4~ 1 2Lff7 h l UrtNJJ" i

~

w cu 2 % ~ a/ ele 7 SL MWh l bL a /&w vue/e 7

}ym( aa j sp un S g u4.!e g.<w An . diaYt7 n cd -" %

l I $ Y f5 0 ]1Auteb (YS ~

,% M ddHn g%4cdA -

l C

w #+" @d*k E C #

% L la I W sla/er

, . QnU-aui16.4wc-Contents-4

FORD NUCLEAR REACTOR EMERGENCY PLAN Revision 9 REVIEW AND REVISION RECORD The Ford Nuclear Reactor Emergency Plan and its appendices will be reviewed, revised as required, signed by the Reactor Laboratory Manafer or one-of the Assistant Managers, and dated biennially and whenever revisions are made. Substantive changes will be approved by the Safety Review Committee and submitted to the U.S. Nuclear Regulatory Commission. Revised sections will be recorded on this l page and on the appropriate page within the plan. Etvisions will be issued to plan holders at the time of revision.

SIGNATURE DATE REV. NO. REVISED SECTIONS (kL 2 W +/+ha us es %fw Jeunt as h larbar

(&L R Aww.- e/ukt wave adh 12a4lolc ,hanauiu i rAdsu a addik ilui e du.nr to/isk6 nwr Da S:obl1.]xv Y W 44A 2 ikun i2/3/u nue abE9: /km-adbtu odaar. "

MLAbue dshr i A.'2.2..s.2 , v. a. 9. , an 2 : 2 2 ,

M 2: 2 ',a u 2: e.$/

llub 2 ku/)1u 5//3/27 /JoAlE h amams]b W E 1%L a ik ,/nh7 iussie cuanv2 omzess (Lab a ilun~ nkk7 2. r47,a.i.i,s.t.2,3.i.g.

04u3 3: S-5 ts 3 -/V, a -

Cuua 4 : 4-9 6 4-s.

T abs >tL-Amtilnabh.

AttA A W 4/2.i/t7 IlloAJE a gian h Us $i $a5nben Y I&L 2 Ann ah/wr .s ph 7 a.i.i. di.2 s.i.i 1

'5. 5. If Tal>h / , /o.3, /s ~

Bu 2 : s.2.

(Ln.a L 2 /d w y) ~ 5/26/82 vade aAb a: Uda m&

Rub 12. bwu N/4/?? IJ o M Luyab W i

contents-4

EORD NUCLEAR REACTOR ElfERGENCY PLAN 1' p

Revisaon 5 i

REVIEW AND REVISION RECORD (Continued )

SIGNATURE DATE REV. NO. REVISED SECTIONS Yk 7f2.'2./ry l14 k b f wk - A)o D E 0.g,p 6.'

shd Ad Athl 2 Aum- n./e/er 4-  %. 2i 55 M. , 3:.

3-V.,

L%bs: 5- 4 an d. E-13 (2nd A Auon 3/n./P) Mo sJF b N.w d O w rb a r TEkdwM

~

Aus a k ahe wase abrmat'sww kcl r % 4Aipe e 2.2.s,1.1, a. i. i i

N Contents-5

= - - _ __ _ _ _

i Fr w

~ , " , am m*e

'~ # '

. ug'o UNITEQ STATES

-8 g-g g

e.

NUCLEAR REGULATORY COMMISSION wAnwmaron, o. c. zones

[EV /

.....p January 16, 1987 Docket No.50-002 Dr. William F.-Kerr, Director

/ Phoenix Memorial Laboratory Ford Nuclear Reactor i University of Michigan 2301 Bonisteel Boulevard Ann Arbor, Michigan 48109-2100

Dear Dr. Kerr:

SUBJECT:

APPROVAL OF REVISIONS TO THE FORD NUCLEAR REACTOR EMERGENCY PLAN.

The staff of the U. S. Nuclear Regulatory Commission (NRC) has completed .

its review and evaluation of the revised emergency plan for the University  !

of Michigan reactor facility which was submitted on December 3,1986. The plan was reviewed against the requirements of Appendix E to 10 CFR Part 50.

Bared on its review, the staff concludes that the emergency plan for the University of Michigan Ford Nuclear Reactor meets the requirements of the regulations and is, therefore, acceptable. We request that you begin to  !

implement your approved emergency plan immediately, with full implementation to be accomplished within 120 days of the date of this letter. Furthermore,  ;

'you are requested to inform us by letter of the date on which complete .{

implementation is achieved.

If you have any questions, please contact John Dosa, our Project Manager for your facility, at (301) 492-8529. j i

Sincerely, j i

'erbert N. Berkow, Director Standardization and Special  ;

Projects Directorate l l_

Division of PWR Licensing-B l E Office of Nuclear Reactor Regulation .

l 1

l cc: See next page 1

l l

5 N O

  • W3~ .1p.