ML20136F553
| ML20136F553 | |
| Person / Time | |
|---|---|
| Site: | University of Michigan |
| Issue date: | 11/07/1985 |
| From: | Kerr W MICHIGAN, UNIV. OF, ANN ARBOR, MI |
| To: | Shafer W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| NUDOCS 8511220144 | |
| Download: ML20136F553 (2) | |
Text
So-CDb
~-
THE UNIVERSITY OF MICHIGAN MICHIGAN MEMORIAL-PHOENIX PFOJECT Phoenix Memorial Laboratory office of the Director Phone (313) 764-6213 November 7, 1985 U.
S. Nuclear Regulatory Commission Attn:
W. D. Shafer, Chief Emergency Preparedness and Radiological Protection Branch 799 Roosevelt Road Glen Ellyn, Illinois 60137 Gentlemen:
This is in response to your letter dated October 25. 1985 concerning a routine safety inspection conducted by N. A.
Nicholson on October 2-4, 1985.
Pursuant to the provisions of 10CFR2.201, this letter serves as a written statement concerning two items of noncompliance identified during the inspection.
Item 1 On numerous occasions during 1985, licensed material that was not readily soluble or dispersible was released from the Ford Nuclear Reactor / Phoenix Memorial Laboratory (FNR/PML) to the sanitary sewer.
(1)
Corrective Action Taken and the Results Achieved:
A rubber sealing gasket on the final, 5-micron filter in the retention tank liquid discharge line was missing and has been properly replaced.
As a result, the maximum particle size contained in liquids being discharged to the sanitary sewer is less than 5 microns.
(2)
Corrective Action to be Taken to Avoid Further Noncompliance:
The retention tank dumping procedure, HP 115, has been reviewed with the health physics staff.
The fourth sentence in section 5.10.3 has been revised to read,
" Check the clear CUNO filter holder to assure that the filters are properly installed and that a sludge buildup has not occurred".
(3)
The Date When Full Compliance Will be Achieved:
November 7, 1985.
(p
}C '
0511220144 851107
~NOV 8f995 PDR ADOCK 05000002 G
a Item 2 No effluent reports for the fourth quarter 1984 and the first and second quarters 1985 were prepared.
(1)
Corrective Action Taken and the Results Achieved:
All quarterly effluent reports through the third quarter 1985 have been prepared and reviewed.
(2)
Corrective Action to be Taken to Avoid Further Noncompliance:
Preparation of effluent reports has been reviewed with the health physics staff.
The Reactor Manager has started a tickler file with a quarterly tickle for the effluent reports.
(3)
The Date When Full Compliance Will be Achieved:
November 7, 1985.
Sincerely, M
William Kerr, Director Michigani :Mmnri a1-Phoenix Project l
Subscribed and sworn before me, thisi day of IlH44*fl(Q9_/S~a Notary Public in and for./4dZ4Ah*/T County, Michigan.
l s6manyature). CJs-s:b (St
./
NOTARY PUBLIC My C:mm!ssion expires-
- 19__
i.
a