Responds to NRC Re Violations Noted in Insp on 851002-04.Corrective Actions:Rubber Sealing Gasket on Final 5-micron Filter Replaced & Fourth Sentence in Section 5.10.3 of Retention Tank Dumping Procedure HP 115 Revised
ML20136F553
Person / Time
Site: University of Michigan
Issue date: 11/07/1985
From: Kerr W
MICHIGAN, UNIV. OF, ANN ARBOR, MI
To: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8511220144
Download: ML20136F553 (2)


Text

~-

  • So- CDb THE UNIVERSITY OF MICHIGAN MICHIGAN MEMORIAL-PHOENIX PFOJECT Phoenix Memorial Laboratory office of the Director Phone (313) 764-6213 November 7, 1985 U. S. Nuclear Regulatory Commission Attn: W. D. Shafer, Chief Emergency Preparedness and Radiological Protection Branch 799 Roosevelt Road Glen Ellyn, Illinois 60137 Gentlemen:

This is in response to your letter dated October 25. 1985 concerning a routine safety inspection conducted by N. A.

Nicholson on October 2-4, 1985.

Pursuant to the provisions of 10CFR2.201, this letter serves as a written statement concerning two items of noncompliance identified during the inspection.

Item 1 On numerous occasions during 1985, licensed material that was not readily soluble or dispersible was released from the Ford Nuclear Reactor / Phoenix Memorial Laboratory (FNR/PML) to the sanitary sewer.

(1) Corrective Action Taken and the Results Achieved:

A rubber sealing gasket on the final, 5-micron filter in the retention tank liquid discharge line was missing and has been properly replaced. As a result, the maximum particle size contained in liquids being discharged to the sanitary sewer is less than 5 microns.

(2) Corrective Action to be Taken to Avoid Further Noncompliance:

The retention tank dumping procedure, HP 115, has been reviewed with the health physics staff. The fourth sentence in section 5.10.3 has been revised to read,

" Check the clear CUNO filter holder to assure that the filters are properly installed and that a sludge buildup has not occurred".

(3) The Date When Full Compliance Will be Achieved:

November 7, 1985. , (p 0511220144 851107

}C '

PDR ADOCK 05000002

~NOV 8f995 G PDR

.. a Item 2 No effluent reports for the fourth quarter 1984 and the first and second quarters 1985 were prepared.

(1) Corrective Action Taken and the Results Achieved:

All quarterly effluent reports through the third quarter 1985 have been prepared and reviewed.

(2) Corrective Action to be Taken to Avoid Further Noncompliance:

Preparation of effluent reports has been reviewed with the health physics staff. The Reactor Manager has started a tickler file with a quarterly tickle for the effluent reports.

(3) The Date When Full Compliance Will be Achieved:

November 7, 1985.

Sincerely, M

William Kerr, Director Michigani :Mmnri a1-Phoenix Project l

Subscribed and sworn before me, thisi day of IlH44*fl(Q9_/S~a Notary Public l

in and for./4dZ4Ah*/T Michigan. County, s6manyature). ./CJs-s:b (St -

NOTARY PUBLIC My C:mm!ssion expires-

19__
i. a