Forwards Proposed Revs to Emergency Plan,Reflecting Reorganization of Facility Mgt.Reactor Operators Are Not Required to Be in Line of Succession for Emergency Director
ML20237K963
Person / Time
Site: University of Michigan
Issue date: 08/14/1987
From: Kerr W
MICHIGAN, UNIV. OF, ANN ARBOR, MI
To: Berkow H
Office of Nuclear Reactor Regulation
Shared Package
ML20237K965 List:
References
NUDOCS 8708200025
Download: ML20237K963 (2)


Text

_

e University of Michigan Michigan Memorial-Phoenix Project Office of the Director Ann Arbor, Michigan 48109-2100 August 14, 1987 Docket 50-2 License R-28 United States Nuclear Regulatory Commission Attn: Herbert N. Berkow, Director Standardization and Special Projects Directorate Division of PWR Licensing-B Office of Nuclear degulation Washington, D.C.

20555

Dear Mr. Berkow:

The University of Michigan requests that the Ford Nuclear Reactor Emergency Plan be modified as follows:

l l

Page Section Description i

13 Fig 7 In FNR-FML Management, change Assistant Reactor Manager to Assistant Reactor Managers 14 3.1.1 Eliminate lead reactor operator and reactor operator from the Emergency Director line of succession.

Add a second Assistant Reactor Manager.

14 3.1.3 Eliminate the assumption of Emergency Director.

responsibilities by the lead reactor operator on shift.

15 3 1.4 Add a second Assistant Reactor Manager to the facility management.

App 3-5 to Added K.

Conway to and deleted C.

Brannon from 3-12 emer gency staf f.

App 3-13 to Changes to building names, supervisors, and 3-14 telephone numbers.

App 4-9 Changes to facility staff.

App 4-10 Changes to Ann Arbor emergency personnel.

Revised pages 13 to 15, App 3-5 to 3-14, and App-4-9 to 4-10 from the Emergency Plan are enclosed with the precise changes underlined or indicated in the margins.

Where words were removed, a vertical line is placed in the border.

Changes to the pages in the appendices are editorial, and have resulted from an annual (4

review of the Emergency Plan.

ID k

8708200025 070814 1

PDR ADOOK 05000002 F

PDR

1 o'

4 The changes to pages 1-3 to 15 have been made because facility management has recently been slightly reorganized.

A second j

Assistant Reactor Manager has been added.

The Reactor Manager and both Assistant Reactor Managers are licensed Senior Reactor j

operators.

One of the three is always on duty as facility on-call l

supervisor.

j i

There is no longer a need for reactor operators to be in the line j

of succession for Emergency Director.

In the event of an emergency, the reactor operators on duty follow their emergency operating procedure, safely shut down the reactor, isolate the reactor building, and perform a preliminary evaluation of the severity of the emergency.

These actions constitute the immediate actions needed to mitigate the consequences of an emergency.

Subsequent actions such as notifications, press releases, and i

longer term procedures required for clean-up and re-entry are initiated by the emergency Director.

Sincerely, b

\\

William Kerr, Director Michigan Memorial-Phoenix Project 1