ML20245A274

From kanterella
Revision as of 14:28, 22 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
1988 Annual Rept on Safety Relief Challenges at Peach Bottom Atomic Power Station (Rept 9)
ML20245A274
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/13/1989
From: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CCN-89-14051, NUDOCS 8904250121
Download: ML20245A274 (1)


Text

--__

GCN-89-14051 e..*.

~/ PIIILADELPIIIA ELECTRIC COMPANY

i. PEACli IKYrTOM ATOMIC POWER STATION R. D. I, Box 208

%w1 Delta, Pennsylvania 17314 rtan nonum-run nm ta or a u norscr (717) 456-7nl4 D. M. Smith Vice President April 13, 1989 Docket Nos. 50-277 50-278 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

SUBJECT:

1988 Annual Report on Safety Relief Challenges at Peach Bottom Atomic Power Station (Report #9)

Gentlemen:

This represents the 1988 Annual Report on Safety Relief Challenges for the Peach Bottom Atomic Power Station (PBAPS) as required by the TMI Action Plan, Item II. K.3, and by PBAPS Technical Specification, Paragraph 6.9.1.C: During 1988 there were no automatic actuations of the Main Steam Safety or Relief Valves in response to high reactor pressure.

If you have any questions regarding this matter, please call.

Sincerely, haa.- 2 DMS/MJB: cmc cc: W.T. Russell, Administrator, Region I, USNRC T.P. Johnson, USNRC Senior Resident Inspector Icco65. doc

[O t I O 8904250121 890413 PDR R

ADOCK0500g"7 g  ;

_ _ _ - - _ _ . _ _ _ - _ _ _ _ _ _ _