MONTHYEARML20206D3591998-12-31031 December 1998 1998 PBAPS Annual 10CFR72.48 Rept. with ML20206D3651998-12-31031 December 1998 1998 PBAPS Annual 10CFR50.59 & Commitment Rev Rept. with ML20236T4521997-12-31031 December 1997 PBAPS Units 2 & 3 Annual 10CFR50.59 & Commitment Rev Rept for Period of 970101-1231 ML20198E8711996-12-31031 December 1996 PBAPS Units 2 & 3 Annual 10CFR50.59 Rept,Jan-Dec 1996 ML20113A6771995-12-31031 December 1995 PBAPS Unit 2 & 3 Annual 10CFR50.59 Rept,Jan-Dec 1995 ML20087H8251994-12-31031 December 1994 Annual 10CFR50.59 Rept,Jan-Dec 1994 ML20063J9211993-12-31031 December 1993 Pbaps,Units 1 & 2 Annual 10CFR50.59 Rept for Jan-Dec 1993 ML20046A2411992-12-31031 December 1992 1992 Pbaps,Units 1 & 2 Annual 10CFR50.59 Rept. W/930720 Ltr ML20128D3691991-12-31031 December 1991 Annual 10CFR50.59 Rept ML20086L4101990-12-31031 December 1990 1990 Annual 10CFR50.59 Rept.Rept Received W/O Page 63 ML20006E5711990-02-0707 February 1990 Rev to 1989 Annual Rept on Safety Relief Challenges at Plants. ML20006B7141990-01-16016 January 1990 1989 Annual Rept on Safety Relief Challenges at Peach Bottom Atomic Station, Per TMI Action Plan Item II.K.3 ML20058J9581989-12-31031 December 1989 1989 Annual 10CFR50.59 Rept ML20245A2741989-04-13013 April 1989 1988 Annual Rept on Safety Relief Challenges at Peach Bottom Atomic Power Station (Rept 9) ML20247D3461988-12-31031 December 1988 1988 Annual 10CFR50.59 Rept ML20154A7381987-12-31031 December 1987 Decommissioning Rept 15,1987 ML20210A5541986-12-31031 December 1986 1986 Annual Decommissioning Rept 14 ML20211P1501985-12-31031 December 1985 1985 Annual Plant Mod Rept ML20203E4661985-12-31031 December 1985 1985 Annual Decommission Rept ML20203P5211984-12-31031 December 1984 Annual Plant Mod Rept,1984 ML20087P7521984-04-0202 April 1984 1983 Annual Rept on Safety-Relief Valve Challenges ML20091R2951983-12-31031 December 1983 Annual Plant Mod Rept,1983, ML20076E5231983-06-0909 June 1983 Annual Plant Mod Rept,1982 ML20058C3181982-07-19019 July 1982 Annual Plant Mod Rept,1981 ML20069C9141982-07-19019 July 1982 Annual Plant Mod Rept,1981 ML20010F7311981-08-25025 August 1981 Annual Plant Mod Rept,Jan-Dec 1980. ML20010E6471980-12-31031 December 1980 Annual Plant Mod Rept Jan-Dec 1980. ML20067B5921977-12-31031 December 1977 Annual Operating Rept 2 for Jan-Dec 1977 ML20067B5291976-12-31031 December 1976 Annual Operating Rept 1 for 760101-1231. W/Undated Ltr 1998-12-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K9931999-10-14014 October 1999 Safety Evaluation Supporting Amend 234 to License DPR-56 ML20217B4331999-10-0505 October 1999 Safety Evaluation Supporting Amend 233 to License DPR-56 ML20217G3541999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbaps,Units 2 & 3. with ML20216H7091999-09-24024 September 1999 Safety Evaluation Supporting Amends 229 & 232 to Licenses DPR-44 & DPR-56,respectively ML20212D1281999-09-17017 September 1999 Safety Evaluation Supporting Proposed Alternatives CRR-03, 05,08,09,10 & 11 ML20212A5871999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Peach Bottom,Units 2 & 3.With ML20211D5501999-08-23023 August 1999 Safety Evaluation Supporting Amends 228 & 231 to Licenses DPR-44 & DPR-56,respectively ML20212H6311999-08-19019 August 1999 Rev 2 to PECO-COLR-P2C13, COLR for Pbaps,Unit 2,Reload 12 Cycle 13 ML20210N7641999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for PBAPS Units 2 & 3. with ML20209H1121999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbaps,Units 2 & 3. with ML20195H8841999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbaps,Units 2 & 3. with ML20206N1661999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pbaps,Units 2 & 3. with ML20206A2921999-04-20020 April 1999 Safety Evaluation Concluding That Proposed Changes to EALs for PBAPS Are Consistent with Guidance in NUMARC/NESP-007 & Identified Deviations Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50 ML20205K7411999-04-0707 April 1999 Safety Evaluation Supporting Amends 227 & 230 to Licenses DPR-44 & DPR-56,respectively ML20205P5851999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Peach Bottom Units 2 & 3.With ML20207G9971999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Peach Bottom Units 2 & 3.With ML20199E3471998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Peach Bottom,Units 1 & 2.With ML20205K0381998-12-31031 December 1998 PECO Energy 1998 Annual Rept. with ML20206P1651998-12-31031 December 1998 Fire Protection for Operating Nuclear Power Plants, Section Iii.F, Automatic Fire Detection ML20206D3651998-12-31031 December 1998 1998 PBAPS Annual 10CFR50.59 & Commitment Rev Rept. with ML20206D3591998-12-31031 December 1998 1998 PBAPS Annual 10CFR72.48 Rept. with ML20196G7021998-12-0202 December 1998 SER Authorizing Proposed Alternative to Delay Exam of Reactor Pressure Vessel Shell Circumferential Welds by Two Operating Cycles ML20196E8261998-11-30030 November 1998 Response to NRC RAI Re Reactor Pressure Vessel Structural Integrity at Peach Bottom Units 2 & 3 ML20198B8591998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Pbaps,Units 2 & 3. with ML20206R2571998-11-17017 November 1998 PBAPS Graded Exercise Scenario Manual (Sections 1.0 - 5.0) Emergency Preparedness 981117 Scenario P84 ML20198C6751998-11-0505 November 1998 Rev 3 to COLR for PBAPS Unit 3,Reload 11,Cycle 12 ML20195E5341998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Pbaps,Units 2 & 3. with ML20155C6071998-10-26026 October 1998 Safety Evaluation Supporting Amend 226 to License DPR-44 ML20155C1681998-10-22022 October 1998 Safety Evaluation Accepting Proposed Alternative Plan for Exam of Reactor Pressure Vessel Shell Longitudinal Welds ML20155H7721998-10-12012 October 1998 Rev 1 to COLR for Peach Bottom Atomic Power Station Unit 2, Reload 12,Cycle 13 ML20154J2401998-10-0505 October 1998 Safety Evaluation Supporting Amends 224 & 228 to Licenses DPR-44 & DPR-56,respectively ML20154H4771998-10-0505 October 1998 Safety Evaluation Supporting Amends 225 & 229 to Licenses DPR-44 & DPR-56,respectively ML20154G6821998-10-0101 October 1998 SER Related to Request for Relief 01A-VRR-1 Re Inservice Testing of Automatic Depressurization Sys Safety Relief Valves at Peach Bottom Atomic Power Station,Units 2 & 3 ML20154G6631998-10-0101 October 1998 Safety Evaluation Supporting Amends 223 & 227 to Licenses DPR-44 & DPR-56,respectively ML20154H5541998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Pbaps,Units 2 & 3. with ML20153B9651998-09-14014 September 1998 Safety Evaluation Supporting Amend 9 to License DPR-12 ML20151Y2901998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbaps,Units 2 & 3. with ML20238F2661998-08-24024 August 1998 Safety Evaluation Supporting Amend 222 to License DPR-44 ML20237B9531998-08-10010 August 1998 Specification for ISI Program Third Interval,Not Including Class Mc,Primary Containment for Bpaps Units 2 & 3 ML20237A7761998-08-10010 August 1998 SER Accepting Licensee Response to NRC Bulleting 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode ML20237A5351998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Pbaps,Units 2 & 3 ML20236R8281998-07-15015 July 1998 Safety Evaluation Approving Proposed Alternative (one-time Temporary non-Code Repair) Pursuant to 10CFR50.55a(a)(3) (II) ML20236M3471998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbaps,Units 2 & 3 ML20249C4791998-06-0202 June 1998 Rev 6 to COLR for PBAPS Unit 2 Reload 11,Cycle 12 ML20248F4781998-06-0101 June 1998 Corrected Page 1 to SE Supporting Amends 221 & 226 to Licenses DPR-44 & DPR-56,respectively.Original Page 1 of SE Had Three Typos ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML20248M3001998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Pbaps,Units 2 & 3 ML20247N5351998-05-11011 May 1998 SER Accepting Third 10-year Interval Inservice Program for Pump & Valves for Plant,Units 2 & 3 ML20249C4751998-05-0707 May 1998 Rev 5 to COLR for PBAPS Unit 2 Reload 11,Cycle 12 ML20247G0721998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Pbaps,Units 2 & 3 1999-09-30
[Table view] |
Text
. %
PIIIIADELPIIIA ELECTRIC COMPANY Peach Bottm Atmic Power Station Unit No. 1 1985 Annual Dt h_ssion Report Docket No. 50-171 The following sununrizes the status.of the Peach Bottm Unit No.1 Decamission Facility for the year 1985, based on the scmi-annual inspections required by Technical Specification 8.2.4(a) .
- 1. There is no significant danuge or structural deterioration observed in the security fence surrouncling the exclusion area.
- 2. There is rr significant damge or structural deterioration observed in the containment vessel, scent fuel building enclosure, or radwaste rocm within the exclusion area.
- 3. There is no significant damage or structural deterioration observed in the designated barricades within the exclusion area.
- 4. There is no mndition observed indicating a degradation in security controls or procedures.
- 5. There is no evidence of ground water nuvcment between the exclusion area and outside the exclusion area. (See the attached insoection sunmary.)
- 6. There is no significant change in the radiation or con-tantination levels in the facility.
- 7. There are no ranovable contamination levels above 100 drn.
- 8. The radiation levels in all areas are less than 0.1 mR/hr.
- 9. Maximum airborne activity was 1.2 X 10 -9 tCi/cc. Isotopic analysis identified the source to be a naturally occurring isotope.
- 10. The absolute filter samplc on the containment equalization line indicated:
Radiation Level - less than 0.1 mR/hr.
Contanination Level - less thm 100 dpm.
- 11. There were no reportable occurrences reported during the year to the NRC as required by Technical Specification 8.2.4(b) .
'I /Yf #f Sb Station Superintdndent 8604240231 851231 PDR ADOCK 05000171 R PDR
\\\
' ~
]
PEACH BOTTOM UNIT 1 CONTAINMENT AND EXCLUSION AREA INSPECTIONS 1985 INSPECTION
SUMMARY
ST 12.21, the semi-annual Unit 1 Exclusion Area Inspection, was performed in January and August 1985. Neither of these inspections revealed any unacceptable physical or radiological conditions. In addition, periodic inspections were performed to monitor water conditions inside the exclusion area. As noted in the 1984 Unit 1 Annual Decommission Report, inspectio:ts of the exclusion area had revealed accumulations of water in the liquid radwaste room and in the containment lower basement.
The water in the containment consista of a moisture spot in the lower base ment. While the size of the moisture spot varies slightly with time, there has not been any trend in either direction over the past two years. Currently, the spot is less than 10 square feet.
Inspection of accessible containment penetrations revealed no pathway for rain water flow into the containment. An inspection of normally inaccessible areas inside the containment building was conducted. No additional areas with accumulating water were discovered.
The source of water accumulating in the liquid radwaste room has been determined to be rain water leaking through an overhead access hatch.
Accumulation has been correlated with rainfall. At present, no accumulation of water exists in the liquid radwastee room. Cox_ective action required to eliminate this source of water in leakage is currently being evaluated.
Water samples obtained for radiological analysis and radiological surveys performed during all inspections have revealed no significant activity or radiation levels. There is no evidence of ground water movement between the containment and the outside.
.I PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 (215)841 4000 April 17, 1986 Docket No. 50-171 Mr. Robert M. Ber nero, Director Division of BWR Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555
SUBJECT:
Peach Bottom Atomic Power Station Unit No. 1 1985 Annual Decommission Report
Dear Mr. Muller:
Attached is the 1985 Peach Bottom Atomic Power Station Unit No. 1 Decommission Report. The report is submitted pursuant to reporting requirement 8.2.4(a) in Appendix A to License No.
DPR-12.
Very truly yours,
~
/){
W. M. Alden Engineer-In-Charge Licensing Section Nuclear Services LLM:vdw Attachment cc: Dr. T. E. Mt:rley, Administrator, Region I, USNRC Mr. T. P. J7hnson, Resident Site Inspector Distribution Schedule 0Y t i
k l