Part 21 & Updated Interim Deficiency Rept RER-QSE 86-47 Re Diesel Engine Generator Failure.Initially Reported on 861223.Iron Plated Rod Previously Identified as 6 Should Be Rod 9.Final Rept Will Be Submitted by 870220
ML20212Q123
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/13/1987
From: Haynes J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
REF-PT21-87, REF-PT21-87-009-000 ANPP-39703-JGH, PT21-87-009-000, PT21-87-9, RER-QSE-86-47, NUDOCS 8702020152
Download: ML20212Q123 (3)


Text

- ..  %

Arizona Nuclear Power Project P O. BOX 52034 e PHOENIX, ARIZONA 85072-2034 January 13, 1987 ANPP-39703-JGil/DJW/DRL-92.11 U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. D. F. Kirsch, Director Division of Reactor Safety and Projects Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, 3 Docket No 530

Subject:

Update to Interim Report - RER-QSE 86-47 A 50.55(e) Potentially Reportable Deficiency and 10CFR21 Relating to Diesel Generator Engine Failure File: 87-006-216

Reference:

(A) Telephone Conversation between D. Willet and R. Rouse on December 23,1986 (Initial Notification - RER-QSE 86-47)

(E) ANPP-39650, dated January 9, 1987 (Interim Report - RER -

QSE 86-47)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in reference A and an interim report by reference B.

Additional information to update reference B is attached. It is still expected that this information will be finalized by February 20, 1987 at which time a complete report will be submitted.

Very trul yours, A

J. G. Ilaynes Vice President Nuclear Production @

~

JGil/DRL:kp :n b:

x 8

w m

Attachments @ c$ @@

$ #T cc: See Page 2 g h,, o W

o 8702020152 870113 PDR ADOCK 05000528 S PDR k ff'lf

. .- T Update to Intelim Report RER-QSE 86-47 Mr. D. F. Kirsch Director ,

Page Two January 13, 1987 ANPP-39703-JGH/DJW/DRL-92.11 cc: J.11. Taylor Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission .

Washington, D. C. 20555 A. C. Gehr (4141)

R. P. Zimmerman (6295)

Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway - Suite 1500 ,

Atlanta, Georgia 30339 r

e k

sw.

i. .- 'a UPDATE TO INTERIM REPORT - RER-QSE 86-47 POTENTIAL REPORTABLE DEFICIENCY ARIZONA NUCLEAR POWER PROJECT (ANPP)

PVNCS UNITS 1,' 2, 3 The iron plated rod in the Unit 2A diesel generator, was the number nine (9) connecting rod and not the number six (6) connecting rod as previously l

, indicated.

Incorrect information originally supplied was a result of incorrect verbal Information received from the vendor.

i

! Because of this communication problem, traceability of location and serial

-I

. numbers for diesel generator connecting rods will be verified by ANPP.