ML20064J374

From kanterella
Revision as of 13:54, 6 January 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Tech Specs Re Sti/Aot Extensions for Isolation Actuation Instrumentation
ML20064J374
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 03/07/1994
From:
Public Service Enterprise Group
To:
Shared Package
ML20064J372 List:
References
NUDOCS 9403210166
Download: ML20064J374 (3)


Text

- , ~ , . - .=. - . . - . . . .. - . . . - - . . . . -- . .

. .t .

d

?<

ATTACllMENT REVISED TECIINICAL SPECIFICATION PAGE WITII PEN AND INK CIIANGES i REVISION TO LICENSE AMENDMENT APPLICATION 93-03, NLR-N94025 STI/AOT EXTENSIONS.FOR ISOLATION ACTUATION INSTRUMENTATION FACILITY OPERATING LICENSE NPF-57

!! OPE CREEK GENERATING STATION DOCKET NO. 50-354 The following Technical Specification page has boon revised to reflect the modification which resulted from the discussion with the NRC on the original amendment application:

Technical Snecification Paco 3.3.2 3/4 3-9 All other pages remain as proposed in the original amendment application. -

i i

l 1

i l

I 9403210166 940307 L  !

PDR:.ADOCK 05000354 P.. PDR 2

INSTRUMENTATION I l

3/4.3.2 ISOLATION ACTUATION INSTRUMENTATION

) LIMITING CONDITION FOR OPERATION t

a 4

3.3.2 The isolation actuation instrumentation channels shown in Table 3.3.2-1

}

shall be OPERABLE with their trip setpoints set consistent with the values shown in the Trip Setpoint column of Table 3.3.2-2 and with ISOLATION SYSTEM RESPONSE TIME as shown in Table 3.3.2-3.

APPLICABILITY: As shown in Table 3.3.2-1,

.a ACTION:

a. With an isolation actuation instrumentation channel trip setpoint less conservative than the value shown in the Allowable Values column of Table 3.3.2-2, declare the channel inoperable until the channel

" is restored to OPERABLE status with its trip setpoint adjusted consistent with the Trip Setpoint value.

, = p' INSERT /\ b. With th; n_;b 7 Of OPERAeLE chenne;; ;es; then required by tne uini ;

-OPERACLE Chennels per Trip System r.qwic;.:;nt fer ene trip system, piece the ineperable channel (s) end/or thet trip system in th; tripp:d i

-ecnditf0n* withir One'50er The pr0"f ai+#4-*' Sp f 'itati c" 3. 0. ^ -

-4r net :pplic:ble.

c. With The numb:r Of OPERABLE ch nn:1 1 :: th:n r:quir:d by th: "'-i um LOREPABLE Ch:rnel: per 7-fp Sy:t: r:quir;::nt fer 50th trip syste=s,

. -place-at least cae t-ip syste ** i^ the tripp:d ::nditien withi" ene

-hour-and-take-the ACTJON-r4 quired-by T:51: 3.3.2-1.

V AAn 4ngpgp3p} ghgnag} n993 ngt ha p}3 gag da thA tpjp gd ; 3djtjan wkapa thjg.

wng1d ragga tha Tein Functinn tn necyr in thaga cagag, +km 4na-acahla_

_ehannal chall ha castnrad tn OD[D&DI C State; gjthjn 2 h gpg ac the ArTfnN required by-Table 2.3.2-1 #er thet 7-ip eenetier :h:11 b: t:h:r

    • The trin, sueta= nand ant ha n, l ar_ ad 4a + h -_ + - 4, -a, _ d _ a -d_ 4 + 4 a_ - 4r +hte wan1H

-cause the Taip re actica te eccur wher : trip ;y;te: ::n b; p):::d in the tripp.ed condition without causiag the T-1; cuncti:r i; :;;;r, p!::- the trip

-4ystem with-the =ast 4aaperable channels i- th: tripp:d ::ndition; if both

-syst^=5 have the s e a"-Aer of 4acper:51: :henn:12, piece either trip :ystem ia the tripped conditica l

I e

t HOPE CREEK 3/4 3-9 c

I kttachment LCR 93-03 Marked Up TS Pages NLR-N94025 1

liGERP A

b. With the number of OPERABE channels less than required by the minimum OPERABLE channels per trip system requirement for one trip system, either
1) place the inoperable channel (s) in the tripped condition within a) 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> for trip functions without an OPERABLE channel, b) 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for trip functions cmmon to RPS instrumentation, and c) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for trip functions not common to RPS instrumentation, or
2) take the ACTION required by Table 3.3.2-1.

'Ibe pruvisions of Specification 3.0.4 are not applicable,

c. With the number of OPEPABLE channels less than required by the minimum OPERABIE channels per trip system requirement for both trip systems,
1) place the inoperable channel (s) in one trip system in the tripped condition within one hour and
2) a) place the inoperable channel (s) in the rennining trip system in the tripped condition within
1) 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> for trip functions without an OPEPABIE channel,
2) 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for trip functions cmmon to RPS instrumentation, and
3) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for trip functions not common to RPS instrumentation, or b) take the ACTION required by Table 3.3.2-1.

'Ihe provisions of Specification 3.0.4 are not aplicable.

Insert Page 1 of 2