PNO-I-97-074, on 971203,licensee Announced Senior Mgt Restructuring,Which Included Naming New Chairman,President, Chief Executive Officer,Chief Financial Officer & Promotion of Director of Site Operations

From kanterella
Revision as of 23:42, 1 January 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
PNO-I-97-074:on 971203,licensee Announced Senior Mgt Restructuring,Which Included Naming New Chairman,President, Chief Executive Officer,Chief Financial Officer & Promotion of Director of Site Operations
ML20202E084
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 12/04/1997
From: Bellamy R, Joseph Nick
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
References
PNO-I-97-074, PNO-I-97-74, NUDOCS 9712050244
Download: ML20202E084 (1)


________

December 4, 1997 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE PNO-I-97-074 Thic preliminary notification constitutes EARLY notice of events of POSSIBLE D safety or public interest significance. The information is as initially received without verification or evaluation, and la basically all that is known by Region I staff in King of Prussia, Pennsylvania on this date.

Facility Licensee Emeroency Classification Connecticut Yankee Atomic Power Co. Notification of Unusual Event Haddam Neck 1 Alert 7

East Hampton, Connecticut Site Area Emergency Dockets: 50-213 General Emergency X Not Applicable

Subject:

CONNECTICUT YANKEE SENIOR MANAGEMENT RESTRUCTURING The licensee announced a senior management restructuring on December 3, 1997. The restructuring included naming a new Chairman / President / Chief Executive Officer, a new Chief Financial Officer, and a promotion of the Director of Site Operations.

The new Chairman / President / Chief Executive Officer (CEO) is Don K. Davis, who is also the Chairman and CEO of Yankee Atomic Electric Company (YAEC). The new Chief Financial Officer (CFO) is Thomas W. Bennet, Jr.,

who is also Vice President, Treasurer and CFO of YAEC. Both senior managers will continue to hold their current positions and renponsibilities at YAEC in addition to their new positions, and will bring significant decommissioning experience from Yankee Rowe to Connecticut Yankee.

Russel Mellor was promoted from Connecticut Yankee (CY) Director of Operations to the position of Vice President, CY Operations and Decommissioning. The licensee stated that the changes were designed to prepare CY for the start of physical decommissioning of the plant.

The licensee issued a press release on December 3, 1997, and there were several news articles. The State of Connecticut has been notified and the Division of Nuclear Materials Safety in Region I is prepared to respond to inquirien.

Contact:

Ronald R. Bellamy Joseph Nick (610)337-5200 (610)337-5056

,L (kso\.

j 97 WO50244 971204 *

  • PDR I&E PNO-1-97-074 pog
\

-_ _-- -- _