ML20249A021

From kanterella
Jump to navigation Jump to search
PNO-78-017:on 780127,plant Planning Shutdown to Replace 48 Terminal Blocks Located Inside Containment Necessary for Operation of Certain Safety Related Equipment & to Balance Main Turbine.Shutdown Expected to Last 24-36 Hrs
ML20249A021
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 01/27/1978
From: Klingler G, Nolan F, Sniezek J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
References
PNO-78-017, PNO-78-17, NUDOCS 9806150325
Download: ML20249A021 (1)


Text

g - --

g - --

l PRELIMINARY NOTIFICATION s

Q9m=

January 27, 1978 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO This preliminary notification constitutes EARLY notice of an event of POSSIBLE safety or public interest significance.

The information presented is as initially received without verification or evaluation i

and is basically all that is known by IE staff on this date.

Facility:

Connecticut Yankee Atomic Power Company Haddam Neck Plant (DN 50-213)

Haddam Neck, Connecticut

Subject:

SHUTDOWN FOR REPL*sCEMENT OF TERMINAL BLOCKS Haddam Neck Plant is planning a shutdown commencing this evening (January 27,1978) to replace 48 terminal blocks located inside the containment which are necessary for the operation of certain safety related equipment, and to also balance the main turbine.

Recent tests conducted indicate that these terminal blocks (a type of electrical connector) are incapable of performing satisfact,orily in the high temperature / humidity environment following a loss of coolant accident.

pr.a <

The shutdown is expected to last 24-36 hours.

, E:1..

(-

Media interest is expected because of the extensive interast in environ-lQ mental qualification of safety related electrical connectors. The State

' /

of Connecticut has been informed. A press release is planned by the i'

licensee.

NRC Region I is considering a press release.

i 6

NRC, Region I, (Philadelphia) received notification of this occurrence 4,

by telephone from Haddam Neck Plant Superintendent on January 27, 1978, n

at 9:10 a.m.

Q

Contact:

GKlingler, IE x28019 FNolan, IE x28019 JSniezek, IE x28019 Distribution:

Transmitted H St /.* A d Chairman Hendrie Commissioner Bradford Commissioner Kennedy S. J. Chilk, SECY C. C. Kammerer, CA Commissioner Gilinsky (ForDistribution)

Transmitted: MNBB //M P Bldg /.* 2-E. Volgenau Region I, IE/.' d-L. V. 1iossick, EDO '

E. G. Case, NRR S. H. Hanauer, EDO J. J. Fouchard, PA SS Bldg / / ~2-+f (MAIL)

R. Hartfield, MIPC C. V. Smith, NMSS T. J. McTiernan, 0IA R. G. Ryan, OSP R. Minogue, SD H. K. Shapar, ELD PRELIMINARY NOTIFICATION

.,U'8 1

.J-t 9906150325 790127 PDR 18sE PNO-78-017 PDR