 Issue dateTitleTopic
PNO-I-99-039, on 990831,Haddam Neck Plant CR Was Notified by Transportation Contractor,Hittman Transportation Svcs,That Driver of Truck,Left Plant Earlier in Day Noticed Water Leakage from from sea-land Container He Was Transporting1 September 1999PNO-I-99-039:on 990831,Haddam Neck Plant CR Was Notified by Transportation Contractor,Hittman Transportation Svcs,That Driver of Truck,Left Plant Earlier in Day Noticed Water Leakage from from sea-land Container He Was Transporting
PNO-I-98-033, on 980728,licensee Identified Leak of Approximately 1,000 Gallons of Demineralized Water & Chemical Agents Used for Decontamination of Plant Sys.Region I Radiation Specialist Will Be Onsite to Review Licensee28 July 1998PNO-I-98-033:on 980728,licensee Identified Leak of Approximately 1,000 Gallons of Demineralized Water & Chemical Agents Used for Decontamination of Plant Sys.Region I Radiation Specialist Will Be Onsite to Review Licensee
PNO-I-97-073A, on 971210,update of Offsite Surveys for Contaminated Blocks Made.Total of 114 Blocks Out of 3032 Indicated Radioactive Contamination at Greater than Two Times Background Levels.Licensee Plans to Return to Sites11 December 1997PNO-I-97-073A:on 971210,update of Offsite Surveys for Contaminated Blocks Made.Total of 114 Blocks Out of 3032 Indicated Radioactive Contamination at Greater than Two Times Background Levels.Licensee Plans to Return to Sites
PNO-I-97-074, on 971203,licensee Announced Senior Mgt Restructuring,Which Included Naming New Chairman,President, Chief Executive Officer,Chief Financial Officer & Promotion of Director of Site Operations4 December 1997PNO-I-97-074:on 971203,licensee Announced Senior Mgt Restructuring,Which Included Naming New Chairman,President, Chief Executive Officer,Chief Financial Officer & Promotion of Director of Site Operations
PNO-I-97-073, survey Identified Former Cask Wash Down Area Needing Further Characterization & Remediation within Licensee Control Area.Concrete Blocks Used for Temporary Shield Wall Was Used by 15 Households as of 9711301 December 1997PNO-I-97-073:survey Identified Former Cask Wash Down Area Needing Further Characterization & Remediation within Licensee Control Area.Concrete Blocks Used for Temporary Shield Wall Was Used by 15 Households as of 971130
PNO-I-97-049, on 970807,inadvertent Actuation of Halon Sys Occurred Affecting CR & Adjacent Central Alarm Station. Personnel Took Photographs of Panel of Halon Actuation Panel,Prior to Actuation.Root Cause of Actuation Evaluated8 August 1997PNO-I-97-049:on 970807,inadvertent Actuation of Halon Sys Occurred Affecting CR & Adjacent Central Alarm Station. Personnel Took Photographs of Panel of Halon Actuation Panel,Prior to Actuation.Root Cause of Actuation EvaluatedFire Watch
PNO-I-97-014, on 970227,retrieval of Contaminated Matl at Vendor Facility Made.Licensee Dispatched Survey Team, Consisting of HP Supervisor,Hp Technician & Radioactive Matl Handler to Vendor Facility to Survey & Retrieve Matl28 February 1997PNO-I-97-014:on 970227,retrieval of Contaminated Matl at Vendor Facility Made.Licensee Dispatched Survey Team, Consisting of HP Supervisor,Hp Technician & Radioactive Matl Handler to Vendor Facility to Survey & Retrieve Matl
PNO-I-96-085, on 961204,board of Directors of Connecticut Yankee Atomic Power Co Voted to Retire Haddam Neck Nuclear Power Generating Station,After Nearly 29 Yrs of Svc.Nrc Responding to Media Inquires & Present at Press Conference5 December 1996PNO-I-96-085:on 961204,board of Directors of Connecticut Yankee Atomic Power Co Voted to Retire Haddam Neck Nuclear Power Generating Station,After Nearly 29 Yrs of Svc.Nrc Responding to Media Inquires & Present at Press Conference
PNO-I-96-080, on 961102,two Radiation Workers Entered Reactor Cavity & Fuel Transfer Canal Area to Inspect & Collect Debris in Preparation for Flooding Cavity to Accomplish Defueling Operation Causing Airborne Contamination8 November 1996PNO-I-96-080:on 961102,two Radiation Workers Entered Reactor Cavity & Fuel Transfer Canal Area to Inspect & Collect Debris in Preparation for Flooding Cavity to Accomplish Defueling Operation Causing Airborne Contamination
PNO-I-94-005, ;on 940113,util Declared & Terminated Unusual Event Due to TS Required Shutdown Due to Three Rods Being Declared Inoperable Based on Position Indication.Senior Resident Inspector,State of CT & Media Advised of Event13 January 1994PNO-I-94-005;on 940113,util Declared & Terminated Unusual Event Due to TS Required Shutdown Due to Three Rods Being Declared Inoperable Based on Position Indication.Senior Resident Inspector,State of CT & Media Advised of Event
ML20059K97529 June 1993PNO-1-93-033:on 930622,26 & 27,util Declared Ue as Result of Problems During Electrical Sys Testing.Caused by Loss of Offsite Power Event During Performance of TS a Train Partial Loss of Power Surveillance Testing
PNO-I-89-078, notifies of Potential Strike by Svcs Personnel on Weekend of 890909-10.Personnel from Bargaining Unit Will Assist Util Staff in Certain Maint & Const Activities & Util Developed Contingency Plan8 September 1989PNO-I-89-078:notifies of Potential Strike by Svcs Personnel on Weekend of 890909-10.Personnel from Bargaining Unit Will Assist Util Staff in Certain Maint & Const Activities & Util Developed Contingency Plan
PNO-I-89-013, on 890224,licensee Identified Unmonitored Release Path from Uncontrolled Spent Fuel Bldg Drain Through Switchyard Drain Sys.Caused by Radwaste Water Being Erroneously Discharged Into Floor Drain.Drain Plugged24 February 1989PNO-I-89-013:on 890224,licensee Identified Unmonitored Release Path from Uncontrolled Spent Fuel Bldg Drain Through Switchyard Drain Sys.Caused by Radwaste Water Being Erroneously Discharged Into Floor Drain.Drain Plugged
ML20236P50413 November 1987PNS-I-87-018:on 871112,handgun Detected in Duffle Bag of Contract Security Guard.Guard Denied Access to Plant & Suspended Pending Further Investigation.Plant Security Personnel Confirmed That Guard Was Licensed to Carry Gun
PNO-I-87-056, on 870620,security Guard Found in Possession of half-smoked Marijuana Cigarette.Guard Escorted Offsite & & Site Access Terminated.State of CN Police Notified. Addl Drug Screening of Personnel Under Consideration22 June 1987PNO-I-87-056:on 870620,security Guard Found in Possession of half-smoked Marijuana Cigarette.Guard Escorted Offsite & & Site Access Terminated.State of CN Police Notified. Addl Drug Screening of Personnel Under Consideration
PNO-I-86-096, on 861130,reactor Tripped from Full Power Due to Low Water Level & Steam/Feed Mismatch in Steam Generator 3.Caused by Technician Shorting Out Control Power.Cracked Check Valve Replaced1 December 1986PNO-I-86-096:on 861130,reactor Tripped from Full Power Due to Low Water Level & Steam/Feed Mismatch in Steam Generator 3.Caused by Technician Shorting Out Control Power.Cracked Check Valve Replaced
PNO-I-86-055, on 860723,worker Accumulated High Quarterly Radiation Exposure While Changing Video Camera Position for Witnessing Hydrostatic Test in Steam Generator.Caused by Health Physics Technician Monitoring Error23 July 1986PNO-I-86-055:on 860723,worker Accumulated High Quarterly Radiation Exposure While Changing Video Camera Position for Witnessing Hydrostatic Test in Steam Generator.Caused by Health Physics Technician Monitoring ErrorHydrostatic
PNO-I-86-050A, on 860715,plant Taken to Cold Shutdown. Preparations for Tube Plugging of Approx 70 Steam Generator Tubes w/50% or Greater through-wall Indications in Top Inch of Rolled Area of Tubes Continuing16 July 1986PNO-I-86-050A:on 860715,plant Taken to Cold Shutdown. Preparations for Tube Plugging of Approx 70 Steam Generator Tubes w/50% or Greater through-wall Indications in Top Inch of Rolled Area of Tubes Continuing
PNO-I-86-050, on 860711,plant Shut Down Due to Repairs on Charging Pump a Not Completed within 72 H Limit.Delay Caused by Galling of Rotating Element Locking Nut.Further Delays Expected Due to Tube Cracking Problems15 July 1986PNO-I-86-050:on 860711,plant Shut Down Due to Repairs on Charging Pump a Not Completed within 72 H Limit.Delay Caused by Galling of Rotating Element Locking Nut.Further Delays Expected Due to Tube Cracking Problems
PNO-I-86-021, on 860226,fuel Element Dropped 3 Ft After Being Lifted W/Upper Guide Structure Out of Reactor Vessel for Refueling.Insp in Progress.Recovery Will Be Attempted on 86022727 February 1986PNO-I-86-021:on 860226,fuel Element Dropped 3 Ft After Being Lifted W/Upper Guide Structure Out of Reactor Vessel for Refueling.Insp in Progress.Recovery Will Be Attempted on 860227
PNO-I-85-071, on 850927,Hurricane Gloria Located 50 Miles East of Cape May,Nj.Reactor Facilities Located Along Coast Implementing Procedures Per Emergency Plans.Listed Plants Shutting Down.Oyster Creek Reduced Power Levels to 35%27 September 1985PNO-I-85-071:on 850927,Hurricane Gloria Located 50 Miles East of Cape May,Nj.Reactor Facilities Located Along Coast Implementing Procedures Per Emergency Plans.Listed Plants Shutting Down.Oyster Creek Reduced Power Levels to 35%
PNO-I-80-041, on 800313,radiological Surveys of Site Grounds Uncovered Three Small Patches of Contaminated Soil Outside Controlled Area.Approx Three Tablespoons Soil Removed.Survey Continuing to Determine If Other Areas Contaminated14 March 1980PNO-I-80-041:on 800313,radiological Surveys of Site Grounds Uncovered Three Small Patches of Contaminated Soil Outside Controlled Area.Approx Three Tablespoons Soil Removed.Survey Continuing to Determine If Other Areas Contaminated
ML20248H9449 May 1978PNO-78-105:on 780508,NRC Region I,Received Notification of Licensee Determination That in Event of LOCA Coincident W/Loss of Offsite Power & Failure of 1 DG to Start,Connected Load on Remaining DG Would Exceed Long Term Load Rating
ML20248H7811 May 1978PNO-78-100:on 780427 During Handling of Spent Fuel,Binding Detected Between Fuel Assembly & Storage Rack.Fuel Assembly Returned to Initial Position.Licensee Evaluating Problem. State of Connecticut Informed & Press Release Planned
ML20249A74728 April 1978PNO-78-019:on 780428,anonymous Call Stating That 3 Bombs Had Been Placed in Berlin Corp Headquarters Bldg to Protest Nuclear Power Was Received.Bomb Threat Procedures Were Instituted But Bldg Was Not Evacuated
ML20248J90310 April 1978PNO-78-075:on 780406,approx 300 Gallons of Unneutralized Water Was Released to Discharge Canal.State of CT Informed
ML20248L29223 March 1978PNO-78-059:on 780323,failure of Terminal Blocks Inside of Protective Boxes During Environ Qualification Testing Occurred.Licensee Planning Shutdown Late on 780323 to Replace Presently Installed Aluminum Boxes That Failed
ML20249A02127 January 1978PNO-78-017:on 780127,plant Planning Shutdown to Replace 48 Terminal Blocks Located Inside Containment Necessary for Operation of Certain Safety Related Equipment & to Balance Main Turbine.Shutdown Expected to Last 24-36 Hrs
ML20151Y35019 September 1977PNO-77-163:on 770918,waste Gas Tank Rupture Disc Failed While Tank Was Being Filled,Resulting in Monitored,Unplanned Release of Radioactive Material Environment.State of Connecticut Informed.Licensee Plans to Notify Media