ML20059K975
From kanterella
Jump to navigation
Jump to search
ML20059K975 | |
Person / Time | |
---|---|
Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
Issue date: | 06/29/1993 |
From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
To: | |
References | |
PNO-I-93-033, PNO-I-93-33, NUDOCS 9311160258 | |
Download: ML20059K975 (2) | |
Similar Documents at Haddam Neck | |
---|---|
Category:PRELIMINARY NOTIFICATION OF EVENT OR OCCURRENCE (PNO
MONTHYEARPNO-I-99-039, on 990831,Haddam Neck Plant CR Was Notified by Transportation Contractor,Hittman Transportation Svcs,That Driver of Truck,Left Plant Earlier in Day Noticed Water Leakage from from sea-land Container He Was Transporting1999-09-0101 September 1999
[Table view]PNO-I-99-039:on 990831,Haddam Neck Plant CR Was Notified by Transportation Contractor,Hittman Transportation Svcs,That Driver of Truck,Left Plant Earlier in Day Noticed Water Leakage from from sea-land Container He Was Transporting PNO-I-98-033, on 980728,licensee Identified Leak of Approximately 1,000 Gallons of Demineralized Water & Chemical Agents Used for Decontamination of Plant Sys.Region I Radiation Specialist Will Be Onsite to Review Licensee1998-07-28028 July 1998 PNO-I-98-033:on 980728,licensee Identified Leak of Approximately 1,000 Gallons of Demineralized Water & Chemical Agents Used for Decontamination of Plant Sys.Region I Radiation Specialist Will Be Onsite to Review Licensee PNO-I-97-073A, on 971210,update of Offsite Surveys for Contaminated Blocks Made.Total of 114 Blocks Out of 3032 Indicated Radioactive Contamination at Greater than Two Times Background Levels.Licensee Plans to Return to Sites1997-12-11011 December 1997 PNO-I-97-073A:on 971210,update of Offsite Surveys for Contaminated Blocks Made.Total of 114 Blocks Out of 3032 Indicated Radioactive Contamination at Greater than Two Times Background Levels.Licensee Plans to Return to Sites PNO-I-97-074, on 971203,licensee Announced Senior Mgt Restructuring,Which Included Naming New Chairman,President, Chief Executive Officer,Chief Financial Officer & Promotion of Director of Site Operations1997-12-0404 December 1997 PNO-I-97-074:on 971203,licensee Announced Senior Mgt Restructuring,Which Included Naming New Chairman,President, Chief Executive Officer,Chief Financial Officer & Promotion of Director of Site Operations PNO-I-97-073, survey Identified Former Cask Wash Down Area Needing Further Characterization & Remediation within Licensee Control Area.Concrete Blocks Used for Temporary Shield Wall Was Used by 15 Households as of 9711301997-12-0101 December 1997 PNO-I-97-073:survey Identified Former Cask Wash Down Area Needing Further Characterization & Remediation within Licensee Control Area.Concrete Blocks Used for Temporary Shield Wall Was Used by 15 Households as of 971130 PNO-I-97-049, on 970807,inadvertent Actuation of Halon Sys Occurred Affecting CR & Adjacent Central Alarm Station. Personnel Took Photographs of Panel of Halon Actuation Panel,Prior to Actuation.Root Cause of Actuation Evaluated1997-08-0808 August 1997 PNO-I-97-049:on 970807,inadvertent Actuation of Halon Sys Occurred Affecting CR & Adjacent Central Alarm Station. Personnel Took Photographs of Panel of Halon Actuation Panel,Prior to Actuation.Root Cause of Actuation Evaluated PNO-I-97-014, on 970227,retrieval of Contaminated Matl at Vendor Facility Made.Licensee Dispatched Survey Team, Consisting of HP Supervisor,Hp Technician & Radioactive Matl Handler to Vendor Facility to Survey & Retrieve Matl1997-02-28028 February 1997 PNO-I-97-014:on 970227,retrieval of Contaminated Matl at Vendor Facility Made.Licensee Dispatched Survey Team, Consisting of HP Supervisor,Hp Technician & Radioactive Matl Handler to Vendor Facility to Survey & Retrieve Matl PNO-I-96-085, on 961204,board of Directors of Connecticut Yankee Atomic Power Co Voted to Retire Haddam Neck Nuclear Power Generating Station,After Nearly 29 Yrs of Svc.Nrc Responding to Media Inquires & Present at Press Conference1996-12-0505 December 1996 PNO-I-96-085:on 961204,board of Directors of Connecticut Yankee Atomic Power Co Voted to Retire Haddam Neck Nuclear Power Generating Station,After Nearly 29 Yrs of Svc.Nrc Responding to Media Inquires & Present at Press Conference PNO-I-96-080, on 961102,two Radiation Workers Entered Reactor Cavity & Fuel Transfer Canal Area to Inspect & Collect Debris in Preparation for Flooding Cavity to Accomplish Defueling Operation Causing Airborne Contamination1996-11-0808 November 1996 PNO-I-96-080:on 961102,two Radiation Workers Entered Reactor Cavity & Fuel Transfer Canal Area to Inspect & Collect Debris in Preparation for Flooding Cavity to Accomplish Defueling Operation Causing Airborne Contamination PNO-I-94-005, ;on 940113,util Declared & Terminated Unusual Event Due to TS Required Shutdown Due to Three Rods Being Declared Inoperable Based on Position Indication.Senior Resident Inspector,State of CT & Media Advised of Event1994-01-13013 January 1994 PNO-I-94-005;on 940113,util Declared & Terminated Unusual Event Due to TS Required Shutdown Due to Three Rods Being Declared Inoperable Based on Position Indication.Senior Resident Inspector,State of CT & Media Advised of Event ML20059K9751993-06-29029 June 1993 PNO-1-93-033:on 930622,26 & 27,util Declared Ue as Result of Problems During Electrical Sys Testing.Caused by Loss of Offsite Power Event During Performance of TS a Train Partial Loss of Power Surveillance Testing PNO-I-89-078, notifies of Potential Strike by Svcs Personnel on Weekend of 890909-10.Personnel from Bargaining Unit Will Assist Util Staff in Certain Maint & Const Activities & Util Developed Contingency Plan1989-09-0808 September 1989 PNO-I-89-078:notifies of Potential Strike by Svcs Personnel on Weekend of 890909-10.Personnel from Bargaining Unit Will Assist Util Staff in Certain Maint & Const Activities & Util Developed Contingency Plan PNO-I-89-013, on 890224,licensee Identified Unmonitored Release Path from Uncontrolled Spent Fuel Bldg Drain Through Switchyard Drain Sys.Caused by Radwaste Water Being Erroneously Discharged Into Floor Drain.Drain Plugged1989-02-24024 February 1989 PNO-I-89-013:on 890224,licensee Identified Unmonitored Release Path from Uncontrolled Spent Fuel Bldg Drain Through Switchyard Drain Sys.Caused by Radwaste Water Being Erroneously Discharged Into Floor Drain.Drain Plugged ML20236P5041987-11-13013 November 1987 PNS-I-87-018:on 871112,handgun Detected in Duffle Bag of Contract Security Guard.Guard Denied Access to Plant & Suspended Pending Further Investigation.Plant Security Personnel Confirmed That Guard Was Licensed to Carry Gun PNO-I-87-056, on 870620,security Guard Found in Possession of half-smoked Marijuana Cigarette.Guard Escorted Offsite & & Site Access Terminated.State of CN Police Notified. Addl Drug Screening of Personnel Under Consideration1987-06-22022 June 1987 PNO-I-87-056:on 870620,security Guard Found in Possession of half-smoked Marijuana Cigarette.Guard Escorted Offsite & & Site Access Terminated.State of CN Police Notified. Addl Drug Screening of Personnel Under Consideration PNO-I-86-096, on 861130,reactor Tripped from Full Power Due to Low Water Level & Steam/Feed Mismatch in Steam Generator 3.Caused by Technician Shorting Out Control Power.Cracked Check Valve Replaced1986-12-0101 December 1986 PNO-I-86-096:on 861130,reactor Tripped from Full Power Due to Low Water Level & Steam/Feed Mismatch in Steam Generator 3.Caused by Technician Shorting Out Control Power.Cracked Check Valve Replaced PNO-I-86-055, on 860723,worker Accumulated High Quarterly Radiation Exposure While Changing Video Camera Position for Witnessing Hydrostatic Test in Steam Generator.Caused by Health Physics Technician Monitoring Error1986-07-23023 July 1986 PNO-I-86-055:on 860723,worker Accumulated High Quarterly Radiation Exposure While Changing Video Camera Position for Witnessing Hydrostatic Test in Steam Generator.Caused by Health Physics Technician Monitoring Error PNO-I-86-050A, on 860715,plant Taken to Cold Shutdown. Preparations for Tube Plugging of Approx 70 Steam Generator Tubes w/50% or Greater through-wall Indications in Top Inch of Rolled Area of Tubes Continuing1986-07-16016 July 1986 PNO-I-86-050A:on 860715,plant Taken to Cold Shutdown. Preparations for Tube Plugging of Approx 70 Steam Generator Tubes w/50% or Greater through-wall Indications in Top Inch of Rolled Area of Tubes Continuing PNO-I-86-050, on 860711,plant Shut Down Due to Repairs on Charging Pump a Not Completed within 72 H Limit.Delay Caused by Galling of Rotating Element Locking Nut.Further Delays Expected Due to Tube Cracking Problems1986-07-15015 July 1986 PNO-I-86-050:on 860711,plant Shut Down Due to Repairs on Charging Pump a Not Completed within 72 H Limit.Delay Caused by Galling of Rotating Element Locking Nut.Further Delays Expected Due to Tube Cracking Problems PNO-I-86-021, on 860226,fuel Element Dropped 3 Ft After Being Lifted W/Upper Guide Structure Out of Reactor Vessel for Refueling.Insp in Progress.Recovery Will Be Attempted on 8602271986-02-27027 February 1986 PNO-I-86-021:on 860226,fuel Element Dropped 3 Ft After Being Lifted W/Upper Guide Structure Out of Reactor Vessel for Refueling.Insp in Progress.Recovery Will Be Attempted on 860227 PNO-I-85-071, on 850927,Hurricane Gloria Located 50 Miles East of Cape May,Nj.Reactor Facilities Located Along Coast Implementing Procedures Per Emergency Plans.Listed Plants Shutting Down.Oyster Creek Reduced Power Levels to 35%1985-09-27027 September 1985 PNO-I-85-071:on 850927,Hurricane Gloria Located 50 Miles East of Cape May,Nj.Reactor Facilities Located Along Coast Implementing Procedures Per Emergency Plans.Listed Plants Shutting Down.Oyster Creek Reduced Power Levels to 35% PNO-I-80-041, on 800313,radiological Surveys of Site Grounds Uncovered Three Small Patches of Contaminated Soil Outside Controlled Area.Approx Three Tablespoons Soil Removed.Survey Continuing to Determine If Other Areas Contaminated1980-03-14014 March 1980 PNO-I-80-041:on 800313,radiological Surveys of Site Grounds Uncovered Three Small Patches of Contaminated Soil Outside Controlled Area.Approx Three Tablespoons Soil Removed.Survey Continuing to Determine If Other Areas Contaminated ML20248H9441978-05-0909 May 1978 PNO-78-105:on 780508,NRC Region I,Received Notification of Licensee Determination That in Event of LOCA Coincident W/Loss of Offsite Power & Failure of 1 DG to Start,Connected Load on Remaining DG Would Exceed Long Term Load Rating ML20248H7811978-05-0101 May 1978 PNO-78-100:on 780427 During Handling of Spent Fuel,Binding Detected Between Fuel Assembly & Storage Rack.Fuel Assembly Returned to Initial Position.Licensee Evaluating Problem. State of Connecticut Informed & Press Release Planned ML20249A7471978-04-28028 April 1978 PNO-78-019:on 780428,anonymous Call Stating That 3 Bombs Had Been Placed in Berlin Corp Headquarters Bldg to Protest Nuclear Power Was Received.Bomb Threat Procedures Were Instituted But Bldg Was Not Evacuated ML20248J9031978-04-10010 April 1978 PNO-78-075:on 780406,approx 300 Gallons of Unneutralized Water Was Released to Discharge Canal.State of CT Informed ML20248L2921978-03-23023 March 1978 PNO-78-059:on 780323,failure of Terminal Blocks Inside of Protective Boxes During Environ Qualification Testing Occurred.Licensee Planning Shutdown Late on 780323 to Replace Presently Installed Aluminum Boxes That Failed ML20249A0211978-01-27027 January 1978 PNO-78-017:on 780127,plant Planning Shutdown to Replace 48 Terminal Blocks Located Inside Containment Necessary for Operation of Certain Safety Related Equipment & to Balance Main Turbine.Shutdown Expected to Last 24-36 Hrs ML20151Y3501977-09-19019 September 1977 PNO-77-163:on 770918,waste Gas Tank Rupture Disc Failed While Tank Was Being Filled,Resulting in Monitored,Unplanned Release of Radioactive Material Environment.State of Connecticut Informed.Licensee Plans to Notify Media 1999-09-01 Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS MONTHYEARPNO-I-99-039, on 990831,Haddam Neck Plant CR Was Notified by Transportation Contractor,Hittman Transportation Svcs,That Driver of Truck,Left Plant Earlier in Day Noticed Water Leakage from from sea-land Container He Was Transporting1999-09-0101 September 1999
[Table view]PNO-I-99-039:on 990831,Haddam Neck Plant CR Was Notified by Transportation Contractor,Hittman Transportation Svcs,That Driver of Truck,Left Plant Earlier in Day Noticed Water Leakage from from sea-land Container He Was Transporting IR 05000213/19990021999-08-20020 August 1999 Insp Rept 50-213/99-02 on 990420-0719.No Violations Noted. Major Areas Inspected:Decommissioning Operations & Sf Safety Maint & Surveillance,Plant Support & Rediological Controls IR 05000213/19990011999-05-21021 May 1999 Insp Rept 50-213/99-01 on 980119-990419.No Violations Noted. Major Areas Inspected:Aspects of Licensee Activities in Preparation for Dismantlement & Decommissioning of Facility ML20206R7391999-05-12012 May 1999 Notice of Violation from Investigation on 970616-0718. Violations Noted:On 961209 & 10,J Foley Deliberately Caused Util to Be in Violation of 10CFR50.9 & TS 6.11 & in June 1997 Provided Inaccurate Info to NRC Inspector ML20206R7141999-05-12012 May 1999 Notice of Violation from Investigation on 970314-0722. Violation Noted:M Thomas Engaged in Deliberate Misconduct on 970227,that But for Detection,Would Have Caused Licensee to Be in Violation of 10CFR20.1802 ML20205J8031999-04-0505 April 1999 Notice of Violation from Insp on 961102-27.Violation Noted:Licensee Failed to Adequately Instruct Workers & Failed to Perform Adequate Radiological Surveys in Reactor Cavity & Fuel Transfer Cavity ML20206B3801999-03-29029 March 1999 EN-99-015:informs Commission That Staff Intends to Exercise Discretion Pursuant to Section VII.B.6 of Enforcement Policy & Not Propose Civil Penalty for Severity Level III Problem That Occurred in Nov 1996,prior to Licensee Decision IR 05000213/19980061999-02-26026 February 1999 Insp Rept 50-213/98-06 on 981103-990118.Violations Noted. Major Areas Inspected:Aspects of Licensee Activities in Preparation for Dismantlement & Decommissioning of Facility. Security Program Was Also Inspected ML20207B7041999-02-26026 February 1999 Notice of Violation from Insp on 981103-990118.Violations Noted:Two Different Locked High Radiation Area Doors in Containment Builiding Found Unlocked & Unattended IR 05000213/19980051998-12-21021 December 1998 Insp Rept 50-213/98-05 on 980720-1102.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20155F8511998-10-29029 October 1998 Insp Rept 50-213/98-04 on 980720-0911.Violations Noted. Major Areas Inspected:Aspects of Licensee Preparations, Planning & Implementation of RCS Chemical Decontamination, Operations,Engineering,Maint & Plant Support IR 05000213/19980031998-08-21021 August 1998 Insp Rept 50-213/98-03 on 980414-0803 & 13.Violations Noted. Major Areas Inspected:Operations,Maint,Sf Safety, Decommissioning Activities & Radiological Controls ML20237D4071998-08-21021 August 1998 Notice of Violations from Insp on 980414-0803 & 13. Violations Noted:Licensee Failed to Declare Unusual Event Re 980620 Release of About 800 Gallons of Water Containing Approx 2200 Uci Radioactivity from a Waste Test Tank PNO-I-98-033, on 980728,licensee Identified Leak of Approximately 1,000 Gallons of Demineralized Water & Chemical Agents Used for Decontamination of Plant Sys.Region I Radiation Specialist Will Be Onsite to Review Licensee1998-07-28028 July 1998 PNO-I-98-033:on 980728,licensee Identified Leak of Approximately 1,000 Gallons of Demineralized Water & Chemical Agents Used for Decontamination of Plant Sys.Region I Radiation Specialist Will Be Onsite to Review Licensee IR 05000213/19980011998-05-13013 May 1998 Insp Rept 50-213/98-01 on 980113-0413.Violations Noted.Major Areas Inspected:Decommissioning Support Activities,Spent Fuel Safety,Plant Support & Radiological Controls & Facility Mgt & Control IR 05000213/19980021998-05-0505 May 1998 Insp Rept 50-213/98-02 on 980316-20 & 25-27.No Violations Noted.Major Areas Inspected:Radiological Control Programs IR 05000213/19970091998-02-17017 February 1998 Insp Rept 50-213/97-09 on 971012-980112.Violations Noted. Major Areas Inspected:Decommissioning Operations & Planning & Included Aspects of Engineering,Maint & Plant Support ML20203E6771998-02-17017 February 1998 Notice of Violation from Insp on 971012-980112.Violation Noted:Licensee Did Not Provide for Verifying or Checking Adequacy of Design for Listed Sys & Components IR 05000213/19970121998-01-15015 January 1998 Insp Rept 50-213/97-12 on 970812-13 & 1006-09.No Violations Noted.Major Areas Inspected:Status of Rp&C Facilities & Equipment ML20198Q9091998-01-14014 January 1998 Insp Rept 50-213/97-10 on 971008-1128.No Violations Noted. Major Areas Inspected:Plant Support IR 05000213/19970111997-12-29029 December 1997 Insp Rept 50-213/97-11 on 971006-09 & 1103-07.No Violations Noted.Major Areas Inspected:Programs for Radioactive Liquid Control PNO-I-97-073A, on 971210,update of Offsite Surveys for Contaminated Blocks Made.Total of 114 Blocks Out of 3032 Indicated Radioactive Contamination at Greater than Two Times Background Levels.Licensee Plans to Return to Sites1997-12-11011 December 1997 PNO-I-97-073A:on 971210,update of Offsite Surveys for Contaminated Blocks Made.Total of 114 Blocks Out of 3032 Indicated Radioactive Contamination at Greater than Two Times Background Levels.Licensee Plans to Return to Sites PNO-I-97-074, on 971203,licensee Announced Senior Mgt Restructuring,Which Included Naming New Chairman,President, Chief Executive Officer,Chief Financial Officer & Promotion of Director of Site Operations1997-12-0404 December 1997 PNO-I-97-074:on 971203,licensee Announced Senior Mgt Restructuring,Which Included Naming New Chairman,President, Chief Executive Officer,Chief Financial Officer & Promotion of Director of Site Operations PNO-I-97-073, survey Identified Former Cask Wash Down Area Needing Further Characterization & Remediation within Licensee Control Area.Concrete Blocks Used for Temporary Shield Wall Was Used by 15 Households as of 9711301997-12-0101 December 1997 PNO-I-97-073:survey Identified Former Cask Wash Down Area Needing Further Characterization & Remediation within Licensee Control Area.Concrete Blocks Used for Temporary Shield Wall Was Used by 15 Households as of 971130 IR 05000213/19970051997-11-26026 November 1997 Insp Rept 50-213/97-05 on 970708-1006.No Violations Noted. Major Areas Inspected:Plant Operations,Maint Engineering & Plant Support ML20199D4881997-11-0707 November 1997 Corrected Page for Insp Rept 50-213/97-07 on 970715-30 ML20199D4621997-11-0707 November 1997 Corrected Pages for Insp Rept 50-213/97-03 on 970408-0707 & 0805 ML20198N2761997-10-29029 October 1997 Notice of Violation from Insp on 970703,0811-0919.Violation Noted:On 950222,individual Working on Radiation Work Permit (RWP) 1950603,received Facial Contamination & Not Sent to Be whole-body-counted ML20198N2821997-10-29029 October 1997 Insp Rept 50-213/97-08 on 970703,0811-0919.Violations Noted. Major Areas Inspected:Applied Radiological Controls Program, Contamination Control Program & Training of Personnel Relative to 49CFR172,subpart H IR 05000213/19970031997-10-0909 October 1997 Insp Rept 50-213/97-03 on 970408-0707 & 0805.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20217J3981997-10-0909 October 1997 Notice of Violation from Insp on 970408-0805.Violations Noted:From 960814-970311,licensee Did Not Assure That Significant Condition Adverse to Quality Was Promptly Corrected ML20199B5731997-10-0202 October 1997 EN-97-095:on 971009,staff Intends to Issue Notice of Violation for Two Severity Level III Violations of App B, Criterion Xvi, Corrective Actions. Violations Involved Discovery of Old Plant Design Discrepancy in SWS IR 05000213/19970071997-08-18018 August 1997 Insp Rept 50-213/97-07 on 970715-30.No Violations Noted. Major Areas Inspected:Plant Support Area ML20210P0101997-08-12012 August 1997 Notice of Violation from Insp on 970616-0718.Violation noted:post-dive Diver Tritium Bioassay Sample for 961108 Dive Was Not Shipped as Expeditiously as Possible for Analysis & No Preservative Was Added IR 05000213/19970061997-08-12012 August 1997 Insp Rept 50-213/97-06 on 970616-0718.Violations Noted. Major Areas Inspected:Radiological Controls Program at Cyap Station,Haddam,Ct PNO-I-97-049, on 970807,inadvertent Actuation of Halon Sys Occurred Affecting CR & Adjacent Central Alarm Station. Personnel Took Photographs of Panel of Halon Actuation Panel,Prior to Actuation.Root Cause of Actuation Evaluated1997-08-0808 August 1997 PNO-I-97-049:on 970807,inadvertent Actuation of Halon Sys Occurred Affecting CR & Adjacent Central Alarm Station. Personnel Took Photographs of Panel of Halon Actuation Panel,Prior to Actuation.Root Cause of Actuation Evaluated ML20149D6211997-06-13013 June 1997 Mgt Meeting Rept 50-213/97-03 on 970528.Areas Discussed: Actions in Response to Findings Detailed in NRC Insp Repts 50-213/96-12.96-201 & 97-01.Deficiencies Involved Implementation of Radiation Protection Program IR 05000213/19970041997-06-0303 June 1997 Physical Security Insp Rept 50-213/97-04 on 970505-08.No Violations Noted.Major Areas Inspected:Previously Identified Items,Mgt Control,Pa Detection Aids,Alarm Stations & Communication,Testing,Maint & Compensatory Measures ML20140G4491997-05-12012 May 1997 EN-97-035:on 970512,notice of Proposed Imposition of Civil Penalty in Amount of $650,000 Issued to Licensee.Action Based on Three Severity Level II Problems Consisting of Multiple Individual Violations ML20141D2621997-05-12012 May 1997 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $650,000.Violation Noted:Licensee Did Not Assure That Applicable Regulatory Requirements & Design Basis Were Correctly Translated Into Specifications ML20141F8181997-05-0808 May 1997 Notice of Violation from Insp on 970106-0407.Violation Noted:No RCS Chemistry Samples Were Taken from 961115-970206 ML20141F8301997-05-0808 May 1997 Insp Rept 50-213/97-01 on 970106-0407.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000213/19970021997-03-21021 March 1997 Insp Rept 50-213/97-02 on 970207-07 & 0224-26.Violation Noted.Major Area Inspected:Programs for Radioactive Liquid & Gaseous Effluent Control,Including Organization & Effectiveness of Program Implementation PNO-I-97-014, on 970227,retrieval of Contaminated Matl at Vendor Facility Made.Licensee Dispatched Survey Team, Consisting of HP Supervisor,Hp Technician & Radioactive Matl Handler to Vendor Facility to Survey & Retrieve Matl1997-02-28028 February 1997 PNO-I-97-014:on 970227,retrieval of Contaminated Matl at Vendor Facility Made.Licensee Dispatched Survey Team, Consisting of HP Supervisor,Hp Technician & Radioactive Matl Handler to Vendor Facility to Survey & Retrieve Matl ML20136B4471997-02-25025 February 1997 Summary of Meeting Re Insp 50-213/96-12 on 970205 in King of Prussia,Pa to Discuss Findings Detailed in Insp Rept on 961102.Radiation Program Was Deficient in Several Areas That Resulted in Potential Exposure to Radiation ML20138J6751997-02-0404 February 1997 Insp Rept 50-213/96-13 on 961116-970105.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Engineering & Plant Support ML20138J6721997-02-0404 February 1997 Notice of Violation from Insp on 961116-970105.Violation Noted:On 961127,during Preparations to Test EG2B After Jacking Engine,Operator Failed to Remove Crank Over Tool Per Step 6.2.10 Prior to Running Diesel for One Hour Test ML20133A4911996-12-24024 December 1996 Notice of Violation from Insp on 960921-1115.Violation Noted:On 960924,B Residual Heat Removal Pump Failed Due to Inherent Manufacturing Defects & Marginal Design Tolerance ML20133A5031996-12-24024 December 1996 Insp Rept 50-213/96-11 on 960921-1115.Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support ML20132G6211996-12-19019 December 1996 Insp Rept 50-213/96-12 on 961102-27.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Review of Airborne Radioactivity Event That Occurred on 961102 1999-09-01 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20059K975&oldid=3558286"