Rev 6 to Procedure OI-28, Condensate Demineralizer Resin Flush & Recharger U3A,(U3B) & (U3C)
ML20204H519
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/18/1983
From:
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20204H448 List:
References
OI-28, NUDOCS 8411120308
Download: ML20204H519 (6)


Text

-

g #

Date .0I-28 OPS Supervisor MINOR Chem Lab Records Revision 6

[- Updated 11-18-83 OPS Office Records Updated CONDENSATE DEMINERALIZER RESIN FLUSH & RECHARGE U3A (U3B) [U3C]

1.0 PURPOSE 1.1 To sluice the spent resin out of the condensate demineralizer.

1.2 To recharge the demineralizer with fresh resin.

2.0 PRECAUTIONS & LIMITATIONS 2.1 Have Health Physics monitor the demineralizer (contact and general area) prior to start of sluice. Monitor the El. 26' & El. 8' level of the auxiliary building after completion of the sluice.

2.2 Resin storage tank T112 relief valve is set at 150 psig. Monitor the cask continuously during flushing operation. Do not exceed 125 psig

, on resin storage tank pressure gauge.

2.3 Line up monitor tank pump to reactor makeup water header, throttle pump recire valve to maintain 125 psig on the reactor makeup water header.

2.4 If resin storage tank T112 pressure increases to 125 psig and holds, back flushing of the resin retention element on the vent line may be required.

3.0 INITIAL CONDITIONS 3.1 Verify the following:

3.1.1 Verify the storage tank resin inlet and storage tank vent camlock connections are properly mated and securely wired into place.

3.1.2 Camlock female cap installed on the resin storage tank T112 rinse line (center penetration) with padlock installed.

3.1.3 Resin storage tank T112 discharge valve shut (WS-34) and padlock installed.

k 0411120308 841105 PDR ADOCK 05000266 P pyg

o OI-28 Page 2

(

3.2 Perform the following valve lineup: Position Initials 18S-1273 (2BS-1273) [BS-1201] Condensate demin inlet ... S 1B5-1229 (2BS-1229) [BS-1243] Condensate demin resin fill . S IBS-1228 (285-1228) [BS-1274] Condensate demin vent . ... S 1BS-1233 (285-1233) [BS-1205] Condensate demin outlet . .. S WL-1680 Spent resin to storage tank . O WL-1697 Storage tank vent to WHUT . . O WL-1681 RMW to storage tank vent connection ........ S WL-1682 , SA to storage tank resin inlet connection ..... S Storage tank air regulator isolation valves ..... S BS-1219 RMW to WHUT . ........ S BS-1215 Regenerate chemicals to demin S 1B5-1223 (2BS-1223)[BS-1235A] RMW to top of demineralizer . S 1B5-1221 (2BS-1221)[BS-1235B] RMW backflush/demin drain . . S BS-1217 RNW to top of demineralizers O BS-1218 RMW to backflush demin ... O Record demineralizer to be flushed 3.3 Health Physics perform a survey of ion exchanger to be dumped to get initial readings.

Contact General Area .

3.3.1 Permission to sluice resin to storage tank obtained from radioactive waste coordinator who was advised of the above contact reading.

3.4 If the resin being dumped is routed to the resin storage tank via the south dump header, a contact reading of the north header should be taken in the overhead of the north passageway before dumping. After dumping, an increased

, contact reading at this same location is indicative that the north header also needs flushing due to resin carrying l on past resin storage tank.

I If dumping via north header, take contact reading on south j header as explained above.

Opposite dump header contact readings:

Before dumping After dumping i

OI-28 Page 3

-( s 4.0 PROCEDURE Initials 4.1 Pressurize the reactor makeup water header (reference Step 2.3).

4.2 Open 1B5-1231 (2BS-1231) [BS-1202), condensate demineralizer resin dump line valve.

CAUTION: AT THIS POINT THE RESIN IS FREE TO FALL BY GRAVITY TOWARDS THE RESIN CASK. THE RADIATION ,

LEVEL SHOULD BE LOW, BUT CHECK IT.

4.3 Open valve 1BS-1223 (2BS-1223) [BS-1235A), reactor makeup water to the condensate demineralizer bed inlet line.

Vary the flow as required to flush the resin to the storage tank. Do not exceed 125 psig at resin storage tank.

CAUTION: THE RESIN RETENTION ELEMENT ON THE VENT LINE IS LOCATED AT THE TOP OF THE RESIN STORAGE TANK PROVIDING A MINIMUM AIR SPACE. USE CAUTION WHILE FLUSHING WITH HIGH FLOW RATES TO PREVENT OVERPRESSURIZATION AND LIFTING THE TANK INTERNAL RELIEF VALVE.

4.4 Vary the flow rate if required because of radiation levels.

(Flush time 29 minutes at approximately 10 gpm.)

NOTE: IF THE RESIN IS NOT FLOWING FROM THE DEMINERALIZER

, PROPERLY, THE FOLLOWING MAY BE ATTEMPTED:

4.4.1 Shut 1BS-1223 (2BS-1223) [BS-1235A].

4.4.2 Open 1BS-1221 (2BS-1221) [BS-1235B], demineralizer backflush valves. Vary flow as necessary.

NOTE: A COMBINATION OF THE ABOVE TWO WAYS MAY AID IN RESIN FLUSHING.

4.5 When the demineralizer is empty, shut the reactor makeup water valves used per Steps 4.3 & 4.4, then shut and lock 185-1231 (2BS-1231) [BS-1202], resin dump valve.

Lock #

4.6 At the U3's (evaporator condensate demineralizers), check the following valves shut - 1B5-1221, 2BS-1221, BS-1235B, BS-1235A, 2BS-1223 & 1B5-1223. Open BS-1231A to flush residual resin out of the north dump header. Do not exceed 125 psig on resin storage tank. Then shut and lock BS-1231A. Lock #

(

f

  • OI-28 Page 4

(

Initials 4.7 Survey all resin dump lines for radiation. If there is any present, the other resin dump lines.from other demineralizers might have to be flushed.

4.8 Perform the following valve lineup to return the resin cask to a normal condition:

WL-1680 Spent resin to storage tank . .. S WL-1697 Storage tank vent to WHUT . ... O BS-1217 RMW to top of demineralizers . . . S BS-1218 RMW backflush supply . . . . . . . S 4.9 Obtain required resin volume and lot number from Chemistry laboratory.

Volume ft3 Lot #

Chem. Supvr.

4.10 Recharge the demineralizer in the following manner.

Do steps in order indicated.

4.10.1 Open 1BS-1228 (2BS-1228) [BS-1274),

demineralizer vent.

4.10.2 Open BS-1219, RMW/U3A, B&C drain to WHUT.

4.10.3 Open 1BS-1221 (2BS-1221) [BS-1235B],

demineralizer drain /backflush.

4.10.4 After approximately 2-3 minutes, open then reclose the selected demineralizer resin fill valve 1BS-1229 (2BS-1229) [BS-1234).

4.10.5 Remove resin fill connection flange and bolt recharge funnel into place.

4.10.6 When Health Physics is present to take a grab sample and low volume air particulate, open 1B5-1229 (2BS-1229) [BS-1243), demineralizer resin fill. Use demineralized water and begin recharging demineralizer.

CAUTION: ENSURE ALL PERSONNEL INVOLVED IN RECHARGING OPERATIONS HAVE POCKETS TAPED, GLASSES SECURED, ETC.

5.10.7 After sluicing approximately two-thirds of the required resin into the demineralizer, shut

(

1BS-1221 (2BS-1221)-[BS-1235B], demineralizer drain /backflush.

OI-28 Page 5

(.

Initials l 4.10.8 Sluice the remaining resin into the demineralizer and then shut IBS-1228 (2BS-1228) [BS-1274],

demineralizer vent.

4.10.9 Fill the balance of the demineralizer tank volume from El. 46' until water is visable just above the resin fill valve.

4.10.10 Shut 1BS-1229 (2BS-1229) [BS-1243),

demineralizer resin fill.

4.10.11 Remove the recharge funnel and reinstall the blank flange utilizing a new flexitallic gasket.

4.10.12 Align the demineralizer per instructions of the Duty Shift Superintendent.

4.11 Shut BS-1219, RNW/U3A, B&C drains to WHUT and place the reactor makeup water supply to the condition as requested by the Duty Shift Superintendent.

(

(

OI-28 Pagn 6

.[. . -- usa RMW RMW .

e,

' *4

: BS Il67 A Bs123lA: : 03C ss-ius: :

2012 ;.

iuizc lui2A U6 03B 1012B 9  :: -

::  :: amw _

o . . . .!

P E - -

In overhead of 1HX-11B # d In overhead of 2HX-111 RHR heat exchanger RHR heat exchanger cubicle cubicle 9 f' Unit 1 boric acid # Unit 2 boric acid evaporator cubicle l u evaporator cubicle

" r 1 r 1 r 3 r 1 1 r J L J b J b J k J b .

  • los IUZA 109 101A 1U18 (1U28 1 rWL 1825 co.in o rusa 1372.

y1  :  ;;

,( gg WL18540 ,

-@ I:: :: RMW

\ 1-3908 l-390A 1-390A 2-390B RMY!  :: :: @ F F osmau FWS4 202 209 2VIA 20l8 2V 1 r r 1 r 1 r 9 P

] '

l Unit 1 boric acid o Unit 2 boric acid evaporator cubicle

" p p evaporator cubicle

~ ~

y &

Passage to No. 2 Passageway to No. 3 pipeway pipeway Unit 1 non-regenerative Unit 2 non-regenerativ heat exchanger cubicle,,,

ps.;.

a s.-

1.EAD,,,Gr,,

..~.

SHOT SHIELD.,

.m

[?f}1, ,..peatexchangercubicl

.q

. y swe~
n. h . . . . . ..,v.

- v.-.e-wa 7

l

h. . .. . .. g%d h.w ~':"'. 4 N RMW I O l SA. ,  :: 2 :: 'A S 1681 ~ U A - ", -.:l-:16 81 e VENT - TO W.H.U.T.

== ,

1697 i Host "Jumre.R E

l T-il 2. '

SPENT RESIN "

s

{ STOR AGE tat 4 K H LJ

WS _ . ._ ..-_,._._ _ _ , _ _ . _ _ - . _ _ _ _ _ . _ _ . - _ . _ _ _ _ _ _ _ _ _ _ _ . . . _ . _ . . . .