MONTHYEARML20217C0521999-10-0505 October 1999 Proposed Tech Specs 15.3.1.A,15.3.3.A & 15.3.3.C,eliminating Inconsistencies & Conflict Between TSs ML20210M6171999-08-0404 August 1999 Proposed Tech Specs 15.3.5,removing Word Plasma from Discussion of Type of Display Monitor for sub-cooling Info in CR & TS 15.3.7,removing Discussion That Allowed Delay in Declaring EDG Inoperable Due to OOS Fuel Oil Transfer Sys ML20210B5121999-07-15015 July 1999 Pbnp Simulator Four-Yr Rept ML20209C1831999-07-0101 July 1999 Proposed Tech Specs Page Re Amend to Licenses DPR-24 & DPR-27,removing Ifba Enrichment Curve Methodology from TS ML20205R6741999-04-12012 April 1999 Proposed Tech Specs Updating References to Reflect Relocation of Referenced Info in UFSAR ML20203A2261999-02-0202 February 1999 Proposed Tech Specs Bases Page 15.4.4,correcting References to Pbnp FSAR Re Reactor Containment Design ML20202F6521999-01-29029 January 1999 Proposed Tech Specs 15.6 & 15.7,reflecting Administrative Control Changes ML20154G5601998-10-0707 October 1998 Proposed Tech Specs Ensuring That 4 Kv Bus Undervoltage Input to Reactor Trip Is Controlled IAW Design & Licensing Basis for Facility ML20154H4231998-10-0505 October 1998 Proposed Tech Specs Section 15.4.1,removing Requirement to Check Environ Monitors on Monthly Basis ML20154C0561998-09-30030 September 1998 Rev 5 to Pbnp Units 1 & 2 IST Program Third 10-Yr Interval ML20154C1941998-09-28028 September 1998 Proposed Tech Specs Table 15.4.1-1 Re Min Frequencies for Checks,Calibrations & Tests of Instrument Channels ML20153G7361998-09-23023 September 1998 Proposed Tech Specs Removing Explicit Testing Requirements of TS Section 15.4.13, Shock Suppressors (Snubbers) ML20206E2731998-08-26026 August 1998 Rev 11 to Pbnps Odcm ML20206E2681998-08-26026 August 1998 Rev 12 to EM Environ Manual for Wepc ML20236W7861998-07-30030 July 1998 Proposed Tech Specs Change 206,revising to Incorporate Changes to TS to More Clearly Define Requirements for Service Water Sys Operability ML20249C3811998-06-22022 June 1998 Proposed Corrected Tech Specs Pages Re Radiological Effluents ML20248C6651998-05-28028 May 1998 Proposed Tech Specs Providing Specific Numerical Setting for Rt,Rcp Trip & AFW Initiation on Loss of Power to 4 Kv Buses ML20248G1671998-05-27027 May 1998 Proposed Edited Tech Specs Pages Adding CR & Condenser Air Ejector Radiation Monitor SR & Correcting Errors in Notes of Table 15.4.1-1 ML20203K9571998-02-26026 February 1998 Proposed Tech Specs,Revising Sections 15.3.6, Containment Sys bases,15.3.12 CREFS Including bases,15.4.4 Containment Tests bases,15.4.11 CREFS Including Bases, 15.6.8 Plant Operating Procedures & 15.6.12 ML20203K2981997-12-15015 December 1997 Proposed Tech Specs Re Administrative Controls ML20203K3081997-12-0808 December 1997 Rev 0 to Draft Radiological Effluent & Matls Control & Accountability Program ML20203K3231997-12-0202 December 1997 Rev 11 to Draft Odcm ML20203K3121997-12-0101 December 1997 Rev 12 to Draft Environ Manual Wisconsin Electric ML20203K3201997-11-25025 November 1997 Rev 0 to Draft Radiological Effluent Control Manual Wisconsin Electric ML20247P2681997-09-23023 September 1997 Proposed Tech Specs Implementing Boron Concentration Changes Re Planned Conversion of Unit 2 to 18-month Fuel Cycles ML20210M5151997-08-14014 August 1997 Proposed Tech Specs,Removing Requirement in Plant TS to Perform Pbnp Unit 2 Containment Integrated Leak Rate 60-months from Previous Test ML20210J0331997-08-0707 August 1997 Proposed Tech Specs,Replacing Wording & Double Underlining of Revised Wording ML20140C9111997-06-0303 June 1997 Proposed Tech Specs,Modifying TS Section 15.3.3, Eccs,Acs, Air Recirculation Fan Coolers & Containment Spray, to Incorporate AOT Similar to Ones Contained in NUREG-1431,Rev 1 ML20141C5931997-05-0909 May 1997 Proposed Tech Specs Section 15.3.3, Eccs,Acs,Air Recirculation Fan Coolers & Containment Spray to Incorporate Allowed Outage Times Similar to Those Contained in NUREG-1431,Rev 1 ML20140H0321997-05-0101 May 1997 Rev 5 to Training Programs Trpr 33.0, Licensed Operator Requalification Training Program ML20140H0171997-05-0101 May 1997 Rev 12 to Training Courses Trcr 86.0, Administrative ML20140G9811997-04-29029 April 1997 Assessment of Corrective Action Program Pbnp ML20140D7251997-04-14014 April 1997 Proposed Tech Specs,Changing Title of Corporate Officer Responsible for Nuclear Operations from Vice President- Nuclear Power, to Chief Nuclear Officer Per TS Section 15.6.2.1.c ML20140D7091997-04-14014 April 1997 Proposed Tech Specs,Eliminating Provisions for Operation of Units at Below 3.5% Rated Power W/Only One RCP ML20140G9241997-04-11011 April 1997 Rev 6 to ISTs IT 536, Containment Sump B Suction Line Leak Test (Refueling Shutdown) ML20140G9071997-04-0707 April 1997 Rev 8 to ISTs IT 525B, Leakage Reduction & Preventive Maint Program Test of 2SI-896A&B,SI Pump Suction Valves (Refueling) ML20140G8741997-04-0707 April 1997 Rev 35 to ISTs IT 04, Low Head Safety Injection Pumps & Valves (Quarterly) ML20217P2851997-04-0303 April 1997 Rev 10 to Point Beach Nuclear Plant,Units 1 & 2 Odcm ML20137N6451997-04-0202 April 1997 Proposed Tech Specs 14.2.4, Steam Generator Tube Rupture ML20140G9031997-03-21021 March 1997 Rev 8 to ISTs IT 325, CVCS Valves (Cold Shutdown) ML20140G9741997-03-21021 March 1997 Rev 0 to Operations Refueling Tests Ort 10A, Recovery from Integrated Lrt W/Core Off-Loaded ML20137C8331997-03-20020 March 1997 Proposed Tech Specs 15.2.2, Safety Limit,Reactor Coolant Sys Pressure ML20140G9621997-03-19019 March 1997 Rev 0 to Operations Refueling Tests Ort 9A, Preparation for Integrated Lrt W/Core Off-Loaded ML20140G9131997-03-17017 March 1997 Rev 4 to ISTs IT 535B, Leakage Reduction & Preventive Maint Program Test of Train B HHSI & RHR Sys (Refueling) ML20140G9521997-03-17017 March 1997 Rev 16 to Operations Refueling Tests Ort 6, Containment Spray Sequence Test ML20140G8821997-03-0404 March 1997 Rev 9 to ISTs IT 115, Instrument Air Valves (Quarterly) ML20140H3401997-02-28028 February 1997 WO Work Plan WO 9612073, Removal/Replacement of Breakers 1Y-06-11 ML20140H3011997-02-28028 February 1997 WO Work Plan WO 9612056, Removal/Replacement of Breakers 1Y-06-05 ML20140H3331997-02-28028 February 1997 WO Work Plan WO 9612072, Removal/Replacement of Breakers 1Y-06-01 ML20140H3241997-02-27027 February 1997 WO Work Plan WO 9612057, Removal/Replacement of Breakers 1Y-06-03 1999-08-04
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20154C0561998-09-30030 September 1998 Rev 5 to Pbnp Units 1 & 2 IST Program Third 10-Yr Interval ML20206E2731998-08-26026 August 1998 Rev 11 to Pbnps Odcm ML20206E2681998-08-26026 August 1998 Rev 12 to EM Environ Manual for Wepc ML20203K3081997-12-0808 December 1997 Rev 0 to Draft Radiological Effluent & Matls Control & Accountability Program ML20203K3231997-12-0202 December 1997 Rev 11 to Draft Odcm ML20203K3121997-12-0101 December 1997 Rev 12 to Draft Environ Manual Wisconsin Electric ML20203K3201997-11-25025 November 1997 Rev 0 to Draft Radiological Effluent Control Manual Wisconsin Electric ML20140H0171997-05-0101 May 1997 Rev 12 to Training Courses Trcr 86.0, Administrative ML20140H0321997-05-0101 May 1997 Rev 5 to Training Programs Trpr 33.0, Licensed Operator Requalification Training Program ML20140G9811997-04-29029 April 1997 Assessment of Corrective Action Program Pbnp ML20140G9241997-04-11011 April 1997 Rev 6 to ISTs IT 536, Containment Sump B Suction Line Leak Test (Refueling Shutdown) ML20140G8741997-04-0707 April 1997 Rev 35 to ISTs IT 04, Low Head Safety Injection Pumps & Valves (Quarterly) ML20140G9071997-04-0707 April 1997 Rev 8 to ISTs IT 525B, Leakage Reduction & Preventive Maint Program Test of 2SI-896A&B,SI Pump Suction Valves (Refueling) ML20217P2851997-04-0303 April 1997 Rev 10 to Point Beach Nuclear Plant,Units 1 & 2 Odcm ML20140G9031997-03-21021 March 1997 Rev 8 to ISTs IT 325, CVCS Valves (Cold Shutdown) ML20140G9741997-03-21021 March 1997 Rev 0 to Operations Refueling Tests Ort 10A, Recovery from Integrated Lrt W/Core Off-Loaded ML20140G9621997-03-19019 March 1997 Rev 0 to Operations Refueling Tests Ort 9A, Preparation for Integrated Lrt W/Core Off-Loaded ML20140G9521997-03-17017 March 1997 Rev 16 to Operations Refueling Tests Ort 6, Containment Spray Sequence Test ML20140G9131997-03-17017 March 1997 Rev 4 to ISTs IT 535B, Leakage Reduction & Preventive Maint Program Test of Train B HHSI & RHR Sys (Refueling) ML20140G8821997-03-0404 March 1997 Rev 9 to ISTs IT 115, Instrument Air Valves (Quarterly) ML20140H3401997-02-28028 February 1997 WO Work Plan WO 9612073, Removal/Replacement of Breakers 1Y-06-11 ML20140H3011997-02-28028 February 1997 WO Work Plan WO 9612056, Removal/Replacement of Breakers 1Y-06-05 ML20140H3331997-02-28028 February 1997 WO Work Plan WO 9612072, Removal/Replacement of Breakers 1Y-06-01 ML20140H3241997-02-27027 February 1997 WO Work Plan WO 9612057, Removal/Replacement of Breakers 1Y-06-03 ML20137P8441997-02-14014 February 1997 Rev 5 to Authorization of Changes,Test & Experiments (10CFR50.59 & 72.48 Reviews) ML20140G9351997-02-14014 February 1997 Rev 13 to ISTs IT 585, Leakage Reduction & Preventive Maint Program Test of Post-Accident Containment Atmospheric Sampling Sys (Refueling) ML20140G8921997-02-14014 February 1997 Rev 7 to ISTs IT 215, SI Valves (Cold Shutdown) ML20140G9401997-02-0707 February 1997 Rev 21 to TS Tests TS 10A, Containment Airlock Door Seal Testing ML20138K2991997-01-31031 January 1997 Rev 46 to OP 4D,Part 1, Draining RCS to CVCS Hut W/O Entering Reduced Inventory ML20138K2031997-01-31031 January 1997 Rev 6 to IT 380, Purge Valve Air Sys Check Valve (Quarterly) for Unit 1 ML20138K2551997-01-31031 January 1997 Rev 2 to IT 530B, Leakage Reduction & Preventive Maint Program Test of Train B HHSI & RHR Sys (Refueling) for Unit 1 ML20138K2411997-01-31031 January 1997 Rev 12 to IT 530, Leakage Reduction & Preventive Maint Program Test of RHR Sys (Refueling) for Unit 1 ML20138K3231997-01-31031 January 1997 Rev 9 to RP 6A, SG Crevice Flush (Vacuum Mode) ML20137P8551997-01-31031 January 1997 Brine Tank Standpipe Mod ML20138K3071997-01-31031 January 1997 Rev 38 to OP 9C, Containment Venting & Purging ML20138K2901997-01-31031 January 1997 Rev 2 to IT 535A, Leakage Reduction & Preventive Maint Program Test of Train a HHSI & RHR Sys (Refueling) Unit 2 ML20138K2641997-01-31031 January 1997 Rev 12 to IT 535, Leakage Reduction & Preventive Maint Program Test of RHR Sys (Refueling) for Unit 2 ML20138K4991997-01-31031 January 1997 Rev 9 to Ort 4, Main Turbine Mechanical Overspeed Trip Device for Unit 2 ML20138K3181997-01-31031 January 1997 Rev 33 to RP 1B, Recovery from Refueling ML20138K3031997-01-31031 January 1997 Rev 1 to OP 4D,Part 5, Draining RCS to CVCS Hut W/O Entering Reduced Inventory & W/O SG Tubes ML20138K2251997-01-31031 January 1997 Rev 7 to IT 385, Purge Valve Air Sys Check Valve (Quarterly) for Unit 2 ML20138K4791997-01-31031 January 1997 Rev 15 to Ort 67, Component Cooling Water to & from Excess Letdown Heat Exchanger-Refueling Shutdown for Unit 1 ML20138K4701997-01-31031 January 1997 Rev 17 to Ort 59, Train Spray Sys CIV Leakage Test for Unit 1 ML20138K5041997-01-31031 January 1997 Rev 7 to Ort 50, PRT to Gas Analyzer Sample Line for Unit 2 ML20138K5161997-01-31031 January 1997 Rev 18 to Ort 60, Train B Spray Sys CIV Leakage Test for Unit 2 ML20138K4751997-01-31031 January 1997 Rev 19 to Ort 60, Train B Spray Sys CIV Leakage Test for Unit 1 ML20138K5231997-01-31031 January 1997 Rev 7 to Ort 71, Electrical Penetration Leak Test for Unit 2 ML20138K7311997-01-31031 January 1997 Rev 9 to TS 80, Sampling of Emergency Fuel Oil Tank (T-72), Fuel Oil Storage Tanks (T-175A,B) & EDG Day Tanks (T-31A,B & T-176A,B)(Quarterly) ML20138K7171997-01-31031 January 1997 Rev 6 to TS 37, Containment Spray Nozzles Check (Frequency of Less than or Equal to Five Yrs) for Unit 1 ML20138K3121997-01-31031 January 1997 Rev 43 to RP 1A, Preparation for Refueling 1998-09-30
[Table view] |
Text
s RDW 3.3 MINOR Revision 2
( 03-09-84
, PROCEDURE TO ABSORB OIL WITH HI DRI FOR SHIPMENT TO RICHLAND, WASHINGTON, BURIAL SITE 1.0 GENERAL This procedure defines the method to be used to absorb oil for shipment to the burial site at Richland, Washington.
2.0 DEFINITIONS 2.1 Waste oil Drum Drums in which waste oil is stored prior to absorption. They are normally identified with an "NR-- " number. These drums are not used for shipping.
2.2 Shipping Drum Drums into which oil and Hi Dr1 are layered. These drums should not
(. have been used for anything else previously. When full, they will be shipped to the burial site.
2.3 Separation Drum Drums used to hold water pumped out of a waste oil drum. These drums are used to provide extra time to get complete water and oil separation prior to pumping water to a control side floor drain.
3.0 REFERENCES
3.1 . " Absorbents Approved for Use in Packaging Radioactive Wastes", undated memorandum from E. Lee Gronemeyer, In-Charge Transportation and Waste Management, Department of Social and Health Services, State of Washington, 3.2 49 CPR Parts 100 to 178.
3.3 10 CFR Part 71.
3.4 U.S. Ecology, Inc. State of Washington Radioactive Materials License WN-1019-2.
3.5 Waste oil Shipping Drum Contents, form CHP-76.
?
DOC PDR P
t RDW 3.3 Page 2 4.0 MATERTALS NEEDED 4.2 Hi Dri in 40 pound bags 4.2 Two and one-half gallon bucket 4.3 New 55-gallon drums 4.4 Four mil (or greater) thick plastic bags large enough to line a 55 gallon drum 4.5 Adhesive tape to seal plastic bag 4.6 Hand pump and hoses to fit 4.7 Bottom probe for pump 4.8 Protective clothing for handling contaminated liquids ,
4.9 " Radioactive" markings 5.0 PRECAUTIONS I Handle oil carefully. It is a contaminated liquid.
Also, avoid spilling Hi Dri.
6.0 FILLING THE DRUMS 6.1 Obtain a waste permit number from the Duty Snift Supervisor. .
6.2 Each drum of oil should be checked for the pre.ence of water which may have settled below the oil at the bottom of the drum.
6.2.1 Let the drum set for at least one hour after it haw been moved. This will allow the drum contents to settle.
6.2.2 Place the probe of the transfer pump into the very bottom of the drum.
6.2.3 Pump any water that may have accumulated in the bottom of the drum into a bucket.
6.2.4 Cease pumping when oil comes out of the pump.
6.2.5 Allow the oil water mixture in the bucket to separate.
6.2.6 Pour the oil off of the top and back into the waste oil drum. The water should be solidified according to
( RDW 3.2 or OP-9B.
RDW 3.3 Page 3
(
6.3 Line a 55-gallon drum with a plastic bag. This will be the shipping drum. The bag must be at least four mils thick. Thickness should be checked by referring to manufacturer's data or with a micrometer.
6.4 Pour one bag of Hi Dri into the shipping drum.
6.5 Pour one two and one-half gallon peil of oil into the shipping drura.
6.6 Repeat Steps 6.4 and 6.5 three more times. There will then be four bags of Hi Dri and 10 gallons of oil in the shipping drum.
6.7 Add one more bag of Hi Dri.
6.8 Twist bag shut and seal tightly with tape.
6.9 Place a " Radioactive" marking on the top of the bag.
6.10 See Figure 1 which illustrates the distribution of Hi Dri and oil.
6.11 Place lid on drum and tighten.
6.12 Put two " Radioactive Material" labels 180' degrees apart on the drum.
NOTE: THESE LABELS WILL NOT BE NECESSARY IF THE DRUM IS TO BE IMMEDIATELY SURVEYED AND PROPERLY MARKED OR LABELED FOR SHIPMENT.
6.13 Fill out a drum processing tag, form OPS-14 and attach it to the shipping drum. Some information such as total activity may not be l
known at the time of drum processing and may be added at a later time.
6.14 In order to keep track of the activity in each shipping drum, record l
the following data on form CHP-76.
6.14.1 Waste permit number.
6.14.2 Waste oil drum number.
l l 6.14.3 Number of gallons from a waste oil drum put in the shipping drum. If oil is taken from more than one waste oil drum, record the gallons taken from each.
NOTE: THE TOTAL NUMBER OF GALLONS OF OIL PUT IN A DRUM MUST NEVER EXCEED 10 GALLONS.
6.15 Survey the drum and place it in the drum staging area. Post the area j as necessary.
(
L
t RDW 3.3 Page 4
/
I 7.0 PREPARING DRUMS FOR SHIPMENT 7.1 Contact the Nuclear P3 ant Specialist or Engineer assigned to radwaste to establish the hazardous material classification of the shipment.
This will determine which radioactive. handling materials procedure will be used for processing.
7.2 After the shipping drums have been prepared for shipment, place them in an appropriate storage area.
7.3 Send completed form CHP-76 to the Nuclear Plant Specialist or Engineer assigned to radwaste.
L
RDW 3.3 Page 5 i
ATTACHMENT 1 CALCULATION OF AMOUNTS OF OIL AND HI DRI TO BE PUT IN A 55-GALLON DRUM
- 1. Oil /Hi Dri Ratio to be Used for Shipping Purposes Testing at Point Beach Nuclear Plant shows that Hi Dri will absorb 77% of its weight in oil.
However, regulations require that a container must be filled with enough Hi Dri to absorb twice the amount of oil present. The oil /Hi Dri ratio used is only half of the actual dasorption ability of the Hi Dri.
Weight oil
= 0.385 Weight Hi Dri The ratio shown above is used for shipping purposes.
- 2. Weight of Hi Dri per Drum
/
\
A little over five forty-pound bags of Hi Dri will fill a 55-gallon drum.
Weight Hi Dri per Drum = 200 porads.
- 3. Weight Oil Allowed in 200 Pounds of Hi Dri 200 pounds Hi Dri x 77 lbs. oil lb H Dri
- 4. Gallons of 011 Allowed in 200 Pounds of Hi Dri This assumes a specific gravity of 0.9 for oil. This is higher than actual, but allows a. safety margin.
um
- 0.9 x 8.33 lbs./ gal. = 10.27 gallon / drum
- 5. Amounts of Hi Dri And Oil to be Put in a 55-Gallon Drum The amounts will be stated in terms of bags and pail fulls for convenience.
A bag of Hi Dri is 40 pounds. A pail of oil is 2.5 gallons.
Hi Dri to be placed in drum = 5 bags
! Oil to be placed in drum = 4 pails Note that this allows only 10 gallons of oil in the drum, less than the allowable. This provides another safety margin.
l i
l
FIGURE 1 9
1
'I 1 Bag
( 1 Bag + 2 Gal.
1 Bag + 2 Gal.
1 Bag + 2 Gal.
1 Bag + 2 Gal.